2 changes: 1 addition & 1 deletion CLAUDE.md
Original file line number Diff line number Diff line change
Expand Up @@ -76,7 +76,7 @@ Project agents live in `.claude/agents/` and skills in `.claude/skills/`. Agents

## Build schedule

The team builds from 5 Nov 2026 (decisions D-14), setting aside the event rule against building before 14 Nov. Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" as milestones M1–M5 (D-29). M1–M4 build against fixtures and do not depend on each other; only M5 integrates them.
The team builds from 5 Nov 2026 (decisions D-14), setting aside the event rule against building before 14 Nov. Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" under the release milestones **R0**, **R1a**, **R1b**, **R2**, **DR4** and **Maintenance** (D-43 lists what each holds; it amends D-29 and D-30, and M1–M5 are closed). No due dates for now. Difficulty is a label: `good first issue` is Level 1, `help wanted` is Level 2, no label is core work. Atish assigns every ticket.

## Layout

Expand Down
4 changes: 3 additions & 1 deletion docs/architecture/discovery-hunts.md
Original file line number Diff line number Diff line change
Expand Up @@ -1170,6 +1170,8 @@ Owners follow D-17 and are to be confirmed. Each search hunt ticket ships its ca
| **HN-17** | H10 cross-match on Gaia DR4 | HN-1; DR4 | Kevin |
| Later | Watch saved objects; sharing squares between PCs; replay with hunts | | |

**Milestones (D-43).** Tickets are tracked under the release milestones R0, R1a, R1b, R2, DR4 and Maintenance. [D-43](../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5) lists the tickets each one holds.

**Order.** HN-5 comes before any search hunt is Validated: a tool whose first hunt misses every known asteroid has no standing to offer more. The export bundle (HN-4b) comes before the first hunt ships, because without it nothing is usable in research.

### A22.13 Tests
Expand Down Expand Up @@ -1263,7 +1265,7 @@ The first draft's research (17 Nov 2026) was at the level of search results and

### A22.15 Decisions

This PR may not touch `docs/decisions/`, so nothing here has an id yet. On approval each row becomes a `D-` or `Q-` entry (next free at the time of writing: **D-42** and **Q-485**; PR #183 reserves Q-484 and the project licence takes D-41) in `docs/decisions/moving-objects.md` and the index. R-1 to R-12 were **decided by Moon on 18 Nov 2026**, taking the recommendations made on Atish's twelve questions. R-13 to R-28 and the PD rows were **decided by Moon on 19 Nov 2026** on Atish's re-review (changes requested at 76eca86). R-29 to R-49 were **decided by Moon on 19 Nov 2026** from a literature review (arXiv, ADS, IVOA and archive documentation; abstracts and repository pages, not full texts, so sources not opened are marked [verify] and listed as V37). They are registered only once V37 is closed (HN-0). Atish's third review (20 Nov 2026) corrected the citations of R-29, R-39, R-44, R-46, R-47 and R-48, re-decided R-37, corrected the wording of R-3, R-14, R-16, R-18, R-24, R-39, R-40, R-42 and PD-3, and took R-51 to R-54. Atish confirmed the corrections and took these decisions as a code owner on 20 Nov 2026 (Q-484; Moon may still reopen any of them on the PR). The project licence stays a whole-team `D-` decision (HN-0).
This PR may not touch `docs/decisions/`, so nothing here has an id yet. On approval each row becomes a `D-` or `Q-` entry (next free at the time of writing: **D-42** and **Q-485**; PR #183 reserves Q-484 and the project licence takes D-41; **since then D-42 and D-43 are taken, so HN-0 registers these rows from D-44**) in `docs/decisions/moving-objects.md` and the index. R-1 to R-12 were **decided by Moon on 18 Nov 2026**, taking the recommendations made on Atish's twelve questions. R-13 to R-28 and the PD rows were **decided by Moon on 19 Nov 2026** on Atish's re-review (changes requested at 76eca86). R-29 to R-49 were **decided by Moon on 19 Nov 2026** from a literature review (arXiv, ADS, IVOA and archive documentation; abstracts and repository pages, not full texts, so sources not opened are marked [verify] and listed as V37). They are registered only once V37 is closed (HN-0). Atish's third review (20 Nov 2026) corrected the citations of R-29, R-39, R-44, R-46, R-47 and R-48, re-decided R-37, corrected the wording of R-3, R-14, R-16, R-18, R-24, R-39, R-40, R-42 and PD-3, and took R-51 to R-54. Atish confirmed the corrections and took these decisions as a code owner on 20 Nov 2026 (Q-484; Moon may still reopen any of them on the PR). The project licence stays a whole-team `D-` decision (HN-0).

| Ref | Decision | Status |
|---|---|---|
Expand Down
2 changes: 1 addition & 1 deletion docs/architecture/moving-objects/area-plan.md
Original file line number Diff line number Diff line change
Expand Up @@ -6,7 +6,7 @@ The end of [A16](area-search.md#a16-area-search): the tickets, the Day 0 gate an

### A16.7 Tickets and plan

Three core Area tickets (D-29 "as few tickets as possible"): D1 and D2 in **M4 Extras**, D3 in **M5**, priority P2. Four **gated extras** (D4 to D7, [Q-203](../../decisions/moving-objects.md)) in **M4 Extras**, priority P3, behind the gate below. Track's tickets T1 to T4 are in [A19.14](track-contract.md#a1914-owners-tickets-and-tests) and [A20.15](track-ui.md#a2015-tests-and-tickets).
Three core Area tickets (D-29 "as few tickets as possible"): D1 and D2 in **M4 Extras**, D3 in **M5**, priority P2. Four **gated extras** (D4 to D7, [Q-203](../../decisions/moving-objects.md)) in **M4 Extras**, priority P3, behind the gate below. Track's tickets T1 to T4 are in [A19.14](track-contract.md#a1914-owners-tickets-and-tests) and [A20.15](track-ui.md#a2015-tests-and-tickets). (M1 to M5 are the event milestones, closed on 20 Nov 2026 and replaced by release milestones, [D-43](../../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5); the labels below are kept as history.)

| Ticket | Owner | Checklist |
|---|---|---|
Expand Down
2 changes: 1 addition & 1 deletion docs/architecture/moving-objects/track-contract.md
Original file line number Diff line number Diff line change
Expand Up @@ -80,7 +80,7 @@ Q-21's text still says `frames:truncated` past the cone cap; PR #53's entry, mer
| OUTLIER-core rule in Stage 2 (A4.2) | Moon | **T4** |
| Track screen; Track sound | Atish | T2, T3 ([A20.15](track-ui.md#a2015-tests-and-tickets)) |

Milestone M4 Extras, priority P1 because Track is the MVP demo (**Proposed (Q-187)**). Tests (backend, offline on recorded answers): the path from the recorded Horizons replies; an over-limit 200 text answer is not cached; the interpolated marker against the TLIST positions within the stated bound; the Horizons gate never runs two calls at once; Eros gives 14 of 16 points, 13 flagged `outlier_core` **[verify]**; the star list's radii and the near-track filter; the ECSV round trip (tags in the metadata, refusal rows kept, no spin columns); `path:deferred` then a final path.
Milestone M4 Extras, priority P1 because Track is the MVP demo (**Proposed (Q-187)**). Tests (backend, offline on recorded answers): the path from the recorded Horizons replies; an over-limit 200 text answer is not cached; the interpolated marker against the TLIST positions within the stated bound; the Horizons gate never runs two calls at once; Eros gives 14 of 16 points, 13 flagged `outlier_core` **[verify]**; the star list's radii and the near-track filter; the ECSV round trip (tags in the metadata, refusal rows kept, no spin columns); `path:deferred` then a final path. (M1 to M5 are the event milestones, closed on 20 Nov 2026 and replaced by release milestones, [D-43](../../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5); the labels below are kept as history.)

### A19.15 Open items

Expand Down
2 changes: 2 additions & 0 deletions docs/architecture/moving-objects/track-ui.md
Original file line number Diff line number Diff line change
Expand Up @@ -133,6 +133,8 @@ Track's path sound (Q-134: one tick per exposure, wavelength to pitch, drawn x t
| **T2 Track screen** (A20.1 to A20.14) | Atish | M4 Extras, P1 (**Proposed (Q-187)**) |
| **T3 Track sound** (R8.9.2, A20.9) | Atish | M3 (renamed "Sound", Q-132) |

(M1 to M5 are the event milestones, closed on 20 Nov 2026 and replaced by release milestones, [D-43](../../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5); the labels below are kept as history.)

| Layer | Tests |
|---|---|
| Unit | Interpolation between samples and the snap at exposures (`trackTime.ts`); slider and marker in sync; the hash `track=<id>`; Escape closes Track before any other surface (a focused text field keeps it, Q-170) |
Expand Down
2 changes: 2 additions & 0 deletions docs/architecture/plan.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,6 +4,8 @@

## A13 Plan to 14 Nov

> **Superseded by D-43 (20 Nov 2026):** milestones M1 to M5 are closed and replaced by release milestones; see [D-43](../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5). The board below is a 9 Nov snapshot.

Status board as of **9 Nov 2026**, from GitHub (issues and merged PRs). Dates are targets, not promises. The team builds from 5 Nov and has set aside the event rule against building before 14 Nov (D-14). Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" as milestones M1 to M5 (D-29, owners D-30). M1 to M4 build against their own fixtures; only M5 joins them. Numbers like #26 are issues; "PR #n" are pull requests.

**What changed since the plan of 5 Nov:** the event build is desktop browser only on the Asus A15 (Q-132), so M3 becomes **"Sound"** (D-29 and D-30 carry the amendment; the rename on GitHub is pending) and phone testing moves after the event. The MVP demo is 433 Eros in the **Track** tool (Q-137, A19, Atish). **Area search** (Q-146, A16 to A18) joins M4 as tickets D1 to D3.