Repository navigation
Issue-205: Record D-43: release milestones replace M1–M5 - #218
raghavburtony-creator wants to merge 3 commits into
Conversation
Closes #205 Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_017Dj9JMHTKZZ4Vn2G9wyGNq
JoottunAtish
left a comment
There was a problem hiding this comment.
Thanks for picking up #205. This is the right scope, and the D-29/D-30 amendment lines and the D-43 ID are correct (D-43 is free on dev, and no other open PR takes a D- ID). I'm requesting changes for one factual problem, plus a few small fixes.
Blocking: HN-11 and HN-16 belong in R1b, not R2
The milestone split isn't open. It was set on 20 Nov in the GitHub milestones themselves (gh api repos/0ffrian/SphereX/milestones):
- R1b · First validated hunts: "Rest of A22 release 1: HN-4, HN-7, HN-8, HN-9, HN-10, HN-11, HN-16."
- R2 · More hunts: "A22 release 2: HN-4b (release 2 part), HN-12, HN-13, HN-14, HN-15."
A22.12 agrees: only HN-12 to HN-15 are labelled release 2. HN-11 (H4 spectra and precovery) and HN-16 (the verified submission routes) are part of R1b's "Done when". So D-43 as written contradicts the decision it says it records ("Decided (Atish, 20 Nov 2026)"). If this merged, anyone reading CLAUDE.md would file HN-11 or HN-16 under R2 and they would drop out of the first validated release.
Please fix it in all four places (inline comments below):
docs/decisions/scope-process.mdR1b and R2 rows. Then cut the "Open for Atish" bullet down: the split is decided. Cite the GitHub milestone descriptions as the source.docs/architecture/discovery-hunts.md"Milestones (D-43)" paragraph. Also drop the "proposed … wait for Atish" sentence.CLAUDE.mdbuild schedule.docs/decisions/README.mdD-43 index row. Drop "the R1a/R1b split and HN-11, HN-16 placement are proposed".
Non-blocking
- Milestone names: use the real titles in the D-43 table so people can search GitHub for them: "R0 · Foundations and onboarding", "R1a · Hunts core (minimum)", "R1b · First validated hunts", "R2 · More hunts", "DR4 · Gaia dark companions", "Maintenance".
- R1a and HN-4b: say "HN-4b (release 1 part)" in R1a, as the milestone does, so R1a and R2 don't both appear to own all of HN-4b. Also, R-27's minimum includes HN-0, which D-43 puts in R0. Word it as "R-27's minimum, except HN-0 (in R0)" or similar.
- R0: the milestone description is "Licence, the dev branch, HN-0, onboarding docs and the first starter tickets … V6 and the library checks". Not every
Vcheck is in R0: #202 (V36) is in R1b. Please mirror the milestone text. - One owner per fact: CLAUDE.md repeats the ticket lists and already differs from D-43 (it leaves out HN-0 in R0 and the HN-4b part in R2). I'd prefer CLAUDE.md to name the milestones and point to D-43 for what each one holds.
- Index size:
scope-process.mdis now 25,564 bytes, so the index row should say 25 KB, not 24 KB. docs/architecture/plan.md:7(not in this diff) still says work is tracked as M1 to M5. A one-line "Superseded by D-43 (20 Nov 2026)" pointer would stop agents treating that status board as current.docs/architecture/discovery-hunts.md:1268(not in this diff) still says the next free IDs are D-42 / Q-485. Since D-43 is now taken, HN-0 (#203) registers the A22 rows from D-44. Worth a note here or in #203./sx-spec-syncwasn't run. It probably changes nothing here (no section-map or UML impact), but please run it before merge.
CI is green, and the branch merges cleanly into dev.
| |---|---| | ||
| | **R0** | Housekeeping and verification before the build: HN-0, the `V` checks, the library checks, the README and test-helper tickets | | ||
| | **R1a** | The release 1 minimum (A22.12, R-27): HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6 | | ||
| | **R1b** | The rest of release 1 (R-8): HN-4, HN-7, HN-8, HN-9, HN-10 | |
There was a problem hiding this comment.
Blocking. The R1b milestone (set 20 Nov) holds HN-4, HN-7, HN-8, HN-9, HN-10, HN-11 and HN-16. Suggest:
| **R1b · First validated hunts** | The rest of release 1 (R-8): HN-4, HN-7, HN-8, HN-9, HN-10, HN-11, HN-16 |
| | **R0** | Housekeeping and verification before the build: HN-0, the `V` checks, the library checks, the README and test-helper tickets | | ||
| | **R1a** | The release 1 minimum (A22.12, R-27): HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6 | | ||
| | **R1b** | The rest of release 1 (R-8): HN-4, HN-7, HN-8, HN-9, HN-10 | | ||
| | **R2** | Release 2: HN-11 to HN-16, and the release 2 part of HN-4b (R-54) | |
There was a problem hiding this comment.
Blocking. R2 holds only HN-12 to HN-15 and the release 2 part of HN-4b. A22.12 labels only those as release 2. Suggest:
| **R2 · More hunts** | Release 2: HN-12, HN-13, HN-14, HN-15, and the release 2 part of HN-4b (R-54) |
| | Milestone | Holds | | ||
| |---|---| | ||
| | **R0** | Housekeeping and verification before the build: HN-0, the `V` checks, the library checks, the README and test-helper tickets | | ||
| | **R1a** | The release 1 minimum (A22.12, R-27): HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6 | |
There was a problem hiding this comment.
Nit: say "HN-4b (release 1 part)" here, as the milestone does. Otherwise R1a and R2 both appear to own HN-4b. R-27's minimum also includes HN-0, which is in R0, so "R-27's minimum, except HN-0 (R0)" is more accurate.
|
|
||
| | Milestone | Holds | | ||
| |---|---| | ||
| | **R0** | Housekeeping and verification before the build: HN-0, the `V` checks, the library checks, the README and test-helper tickets | |
There was a problem hiding this comment.
Nit: not every V check is in R0. #202 (V36) is in R1b, next to the ticket it blocks. Please mirror the milestone description: "Licence, the dev branch, HN-0, onboarding docs and the first starter tickets; V6 and the library checks."
| - **Difficulty is a label, not a milestone:** `good first issue` is Level 1, `help wanted` is Level 2, and a ticket with neither is core work. Atish assigns every ticket (D-17). | ||
| - **Unchanged:** the contents of the A22 releases. D-43 only names where each ticket is tracked. | ||
| - **Why:** M1 to M5 were the event's independent tracks, due 8 to 15 Nov. The event build is done, and the Discovery hunts ship in releases that overlap, so the old names and due dates no longer describe the work. | ||
| - **Open for Atish:** the A22.12 text does not define R1a and R1b. The split above follows "Release 1 minimum" (R1a) and issue #202 ("R1b: blocks HN-4"). Placing HN-11 and HN-16 in R2 is also proposed: A22.12 does not label them. |
There was a problem hiding this comment.
Blocking (follows from the rows above). The split isn't open: the GitHub milestone descriptions, created by Atish on 20 Nov, define R1a, R1b and R2 ticket by ticket. Please replace this bullet with a Source: line citing those descriptions, and drop the "proposed" wording.
| | **HN-17** | H10 cross-match on Gaia DR4 | HN-1; DR4 | Kevin | | ||
| | Later | Watch saved objects; sharing squares between PCs; replay with hunts | | | | ||
|
|
||
| **Milestones (D-43).** Tickets are tracked under release milestones: **R0** (HN-0 and the housekeeping and verification tickets), **R1a** (the release 1 minimum: HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6), **R1b** (the rest of release 1: HN-4, HN-7, HN-8, HN-9, HN-10), **R2** (HN-11 to HN-16, and the release 2 part of HN-4b), **DR4** (HN-17, when Gaia DR4 is out) and **Maintenance** (standing, outside the hunts). The R1a/R1b split and the placing of HN-11 and HN-16 are proposed in D-43 and wait for Atish. |
There was a problem hiding this comment.
Blocking. Same fix as in D-43: R1b is HN-4, HN-7 to HN-11 and HN-16; R2 is HN-12 to HN-15 plus the release 2 part of HN-4b. Please also drop the last sentence ("proposed in D-43 and wait for Atish"). Better still, keep this to a pointer ("tracked under the release milestones of D-43") so the mapping lives only in D-43.
| ## Build schedule | ||
|
|
||
| The team builds from 5 Nov 2026 (decisions D-14), setting aside the event rule against building before 14 Nov. Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" as milestones M1–M5 (D-29). M1–M4 build against fixtures and do not depend on each other; only M5 integrates them. | ||
| The team builds from 5 Nov 2026 (decisions D-14), setting aside the event rule against building before 14 Nov. Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" under release milestones (D-43, which amends D-29 and D-30; M1–M5 are closed): **R0** (housekeeping and verification), **R1a** (the release 1 minimum: HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6), **R1b** (the rest of release 1: HN-4, HN-7 to HN-10), **R2** (HN-11 to HN-16), **DR4** (HN-17, ships when Gaia DR4 is out) and **Maintenance** (standing, app fixes outside the hunts). No due dates for now. Difficulty is a label: `good first issue` is Level 1, `help wanted` is Level 2, no label is core work. Atish assigns every ticket. |
There was a problem hiding this comment.
Blocking. Every agent loads CLAUDE.md, so a wrong mapping here does the most damage. HN-11 and HN-16 are in R1b, not R2. This list also already differs from D-43 (no HN-0 in R0, no HN-4b part in R2). Suggest dropping the ticket lists and naming the milestones only, e.g. "…under the release milestones R0, R1a, R1b, R2, DR4 and Maintenance (D-43 lists what each holds; it amends D-29 and D-30, and M1–M5 are closed)."
| | D-40 | Issue #93: engine speed, seeded patterns, physics corrections and new card fields | Decided (Atish, 11 Nov 2026); built except Q-361; Q-346 built by Q-385; performance waves Q-381 to Q-387 | [rendering-engines-tuning](rendering-engines-tuning.md#d-40-issue-93-engine-speed-seeded-patterns-physics-corrections-and-new-card-fields-decided-by-atish-11-nov-2026) | | ||
| | D-41 | Project licence: BSD-3-Clause for code and mock-ups, CC-BY-4.0 for docs; data and third-party parts keep their terms (their licence table comes with #200); GPL only as an optional plugin the user installs | Decided (Atish, 24 Nov 2026, PR #212); Space Apps terms checked 24 Nov 2026 | [scope-process](scope-process.md#d-41-project-licence) | | ||
| | D-42 | `dev` is the development branch: all work branches off `dev` and merges back into it by PR; `main` is frozen at `b7b4a1d6` and `dev` is the default branch | Decided (Atish, 20 Nov 2026); GitHub settings to apply | [scope-process](scope-process.md#d-42-dev-is-the-development-branch-main-is-frozen) | | ||
| | D-43 | Release milestones R0, R1a, R1b, R2, DR4 and Maintenance replace M1 to M5; difficulty by label; Atish assigns every ticket | Decided (Atish, 20 Nov 2026); the R1a/R1b split and HN-11, HN-16 placement are proposed | [scope-process](scope-process.md#d-43-release-milestones-replace-m1-to-m5) | |
There was a problem hiding this comment.
Blocking. Drop "the R1a/R1b split and HN-11, HN-16 placement are proposed": both were decided with the milestones on 20 Nov. Status: Decided (Atish, 20 Nov 2026).
| | File | Holds | Size | | ||
| |---|---|---| | ||
| | [scope-process.md](scope-process.md) | scope cuts, doc layout, owners, build dates, milestones, the post-event backlog, the demo object and data release, ID reservations | 8 D, 13 Q, 23 KB | | ||
| | [scope-process.md](scope-process.md) | scope cuts, doc layout, owners, build dates, milestones, the post-event backlog, the demo object and data release, ID reservations | 9 D, 13 Q, 24 KB | |
There was a problem hiding this comment.
Nit: scope-process.md is 25,564 bytes on this branch, so 25 KB.
HN-11 and HN-16 move to R1b as in the GitHub milestones; real milestone titles; CLAUDE.md and A22.12 point to D-43; plan.md and the A22.15 next-free note get pointers. Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_017Dj9JMHTKZZ4Vn2G9wyGNq
JoottunAtish
left a comment
There was a problem hiding this comment.
Re-reviewed at 29096d4. Every point from the first review is addressed:
- Blocking, fixed: R1b now holds HN-4, HN-7 to HN-11 and HN-16, and R2 holds HN-12 to HN-15 plus the release 2 part of HN-4b. This matches the GitHub milestone descriptions and A22.12. The "Open for Atish" bullet is now a Source: line, and the "proposed" wording is gone from the index row and from A22.12.
- CLAUDE.md and A22.12 now just name the milestones and point to D-43, so the ticket lists live in one place.
- The milestone titles match GitHub. R1a says "HN-4b (release 1 part)" and leaves out HN-0, and R0 mirrors its milestone description. The V36/#202 exception is noted.
- The index size is 25 KB,
plan.mdA13 has a superseded-by-D-43 pointer, and A22.15 notes that HN-0 registers its rows from D-44.
The section links resolve (#d-43-release-milestones-replace-m1-to-m5, #a2212-plan-tickets-and-owners). D-43 is still free on dev, and the next-free line (D-44 / Q-487) is correct. Approved.
KevinYerkiah
left a comment
There was a problem hiding this comment.
Approving. Docs-only, scope matches #205, D-43 is free on dev, and the index row, the "Amended by D-43" lines on D-29 and D-30, and the next-free line (D-44, Q-487) are consistent. No blocking issues. Non-blocking comments:
- "Proposed" marking missing. The PR body says D-43 marks the R1a/R1b split and the HN-11/HN-16 placement as proposed. The diff (
docs/decisions/scope-process.mdand the index row) says flatly "Decided (Atish, 20 Nov 2026)". Either mark the split as proposed, or say Atish confirmed it. - Body contradicts the table. The body puts HN-11 and HN-16 in R2. The D-43 table puts them in R1b; R2 holds only HN-12 to HN-15 and the HN-4b release-2 part. Fix one of them.
- Body understates the change. It says
docs/architecture/plan.mdis not changed, but the diff adds a "Superseded by D-43" banner to A13 there. - #189. The body says "Blocked by #189". Please confirm it is merged or irrelevant before merging.
- Sweep not done.
/sx-spec-syncwas not run, anddocs/architecture/moving-objects/(A16.7, A19.14) may still place tickets in M4/M5. Good-to-have before R1a starts: point those at the D-43 milestones.
Generated by Claude Code
… are closed milestones (D-43) Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_017Dj9JL8HPhcxQHyG7e9ABN
Co-Authored-By: Claude Sonnet 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_017Dj9JL8HPhcxQHyG7e9ABN
Closes #205
What
docs/decisions/scope-process.md, amending D-29 and D-30: milestones R0, R1a, R1b, R2, DR4 and Maintenance replace M1–M5; no due dates; difficulty by label (good first issue= Level 1,help wanted= Level 2, none = core); Atish assigns every ticket.docs/decisions/README.md.CLAUDE.md"Build schedule" names the new milestones and points to D-43 for what each holds.docs/architecture/plan.md(A13) gets a "Superseded by D-43" banner; the dated status board itself is unchanged.area-plan.md,track-contract.md,track-ui.md) say that their M-labels are the closed event milestones (added after review).Split
The R1a/R1b/R2 split is decided, not proposed: it follows the descriptions of the GitHub milestones Atish created on 20 Nov 2026. R1b holds HN-4, HN-7 to HN-11 and HN-16; R2 holds HN-12 to HN-15 and the release 2 part of HN-4b (R-54). The earlier draft of this PR put HN-11 and HN-16 in R2; that was corrected after review.
Not changed: the A22 release contents.
Checks
Docs only. #189, which #205 lists as blocking, is closed as completed (20 Nov 2026).
/sx-spec-syncnot run.