Repository navigation
Conversation
… linear claim on the committed table
…-step (c), before any registered run
…(c), raw, as written
… (W fitted to the caller's claim), before its run
…), raw, as written
…as a linear claim on the committed table
… search for other callers covered
Conflicts: research/results.yaml, README.md, CLAIMS.md. results.yaml is main's file plus this PR's own entry (qwen-m3a1-inproj), unchanged and appended at the end. README/CLAIMS take main's side here and are regenerated in the following commit after the merge makes the metric commits available in branch history; README stamp is main's verbatim.
…9d2b scripts/update-results.py after the merge commit (77 results); stamp line kept as main's verbatim. Adds this PR's row for qwen-m3a1-inproj to the README block and CLAIMS.md on top of main's; no other change.
|
Main sync: merged main Conflicted files: All 23 files under |
|
APPROVE at 276303f class A, Opus review, same vendor family as the author, second family not available; this verdict does not by itself allow a merge Reviewer: review lane review242-opus, claude-opus-5-5. The build lane ran on claude-fable-5-2 (same vendor family) and the sync lane on claude-opus-5-5. I reviewed this as if no one else will look at it. What I checked myself, with counts
Worry a: what an accepting verifier has checked (from the code)
I found no link that the prover chooses and could use for a cheat. The N6 run and my R1 and R2 runs agree with this reading. Worry c: what the negatives testN1a, N2b and N3b are built so that the trace is consistent with itself, W is the honest g^T M, (Eval) and (Dot) are true, and the caller claim is false. They are the 3 of 9 registered negatives that test the new claim. That this claim is what refuses is true by construction for all three, and my drop-the-claim control shows it directly for N1a; I did not run that control for N2b or N3b. The other six registered negatives test other things:
N6 (added later) tests LIN's tie of W, on which the claim relies. The PASS rule as first committed is met. It means something for the new piece through 3 cases of the same pattern, not through 9. Must-fixNone that touches the statement, the runs or the wording. Nonblocking
Main sync needed: noMain is fef9d2b, and the PR is CLEAN against it. CIFrom the check-runs API at 276303f: Skipped checksNone skipped. Partial items:
What a second reviewer should look at firstThe joining of LIN's first chain to the trace chain by values in its first query (rho, v, a, the table name) rather than by the trace chain's seal. Together with the 10 / |E| argument, this is the only part of the composition that is new and not exercised by the library's own tests. For the person deciding on a waiverWhat a merge would put on main: a new research operator directory (research/operators/qwen_m3a1c), one experiment directory, one inventory row and one results row. Together they show, on a CPU research harness, that for ONE token, ONE head and ONE layer of the stock Qwen3.8-27B, 514 committed output cells are in their classes and satisfy the in_proj rounding equation in the field against PR #231's committed table, with a public input. The verdicts rebuild from source exactly, and a verifier whose input differs by one unit in one coordinate refuses. What it would NOT establish:
What I am least sure of: that the argument in this review, and the lane's own, holds once it is compiled. The tie's 10 / |E| bound and the chain join are reasoned by two models of the same vendor family and by nobody else. A priced version would need a change to |
Part of #229
Sub-step (c) of issue #229: the in_proj outputs of one Gated DeltaNet head of Qwen3.8-27B (layer 0, V head 0) for ONE token, proved as a linear claim on the committed weight table of PR #231, with the layer's normed input public. Research harness, CPU only. Draft, not for merge by this lane.
This branch conflicts with main and needs the coordinator. Main moved during the lane (PR #224 added a
research/results.yamlrow; both it and this branch append at the end of that file, so the generated README and CLAIMS rows collide too).fp_merge_main.pyaborted on conflicts inCLAIMS.md,README.mdandresearch/results.yaml. Per the lane rules nothing was resolved by hand. No CI run is listed for the last two commits;claims-checkandhost-path-guardwere green on the five commits before them. The same checks pass locally on the head.What was built
blocks/iop/lin.hsays a caller may add its own claims to the request's own group before the chain is sealed. So the public input is applied by ONE extra linear claim on W: sum over j < 5,120 of a_j W[j] = v. No sumcheck over the column index. This is what the reviewer of PR research: Qwen M3a-1 weight side, committed head-0 weight table and cell tie (#229) #231 suggested checking (nonblocking 5 of research: Qwen M3a-1 weight side, committed head-0 weight table and cell tie (#229) #231 (comment)).research/operators/qwen_m3a1c/only. No existing source file is changed. One coverage row (OP-R21) and one results row.The statement
For every one of the 514 rows: sum_j a_j M[r][j] + 2^(s_r - 1) = 2^(s_r) x_r + rem_r as an equation in the field, M the committed table, a public, x_r in [-2^23, 2^23), rem_r in [0, 2^(s_r)).
Verdicts (measured, unreplicated, one shared host, research setting)
Where each negative test was refused, with source lines:
experiments/20261129-229-qwen-m3a1-inproj/RESULTS.md. Two of the nine (another key; the input changed after the proof) are refused by transcript binding, not by the claim; their twins with a matching transcript are refused by the claim.Measured, n = 5: prove median 1.009 s (0.969 to 1.122), verify median 0.104 s (0.103 to 0.110), table commit median 3.607 s, peak RSS median 488,424 kB; 20,178 product columns, 39,328 relations, table length 2^15.
What is and is not bound
NOT established
Deviations
Open risks
blocks/frame/lin_frame.hplans a request's own test with exactly 2 + 3 x samples batched claims and BAT ends the process on another count. Here one hand-made plan in the new file has 6. Read, not run.Proposed claim, for the ledger row
qwen-m3a1-inproj: as the row's summary states, nothing stronger.Must merge with a merge commit (it adds results.yaml metrics that point at this branch's commits).