Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
13 changes: 13 additions & 0 deletions docs/kit-friction-log.md
Original file line number Diff line number Diff line change
Expand Up @@ -24,6 +24,19 @@
>
> Tracker board: https://github.com/topij/agentic-dev-kit/issues

## 2026-09-11

- **The review runtime stopped before delivering required adversarial coverage.**
PR #733's [receipt at `88c5b044d5a42e33d2c4b0158be0957b4014678a`](https://github.com/topij/agentic-dev-kit/pull/733#issuecomment-5633065607)
and [receipt at `207683b073f4d34cf22c5d9e1635f1c23239b6d4`](https://github.com/topij/agentic-dev-kit/pull/733#issuecomment-5633204702)
preserve the actual `codex exec` argv, private review directories, compute readback
and terminal cybersecurity-content flags on 2026-09-11. **M** — required review
could not reach a final report. The runtime supplied no classifier diagnosis;
no kit mechanism or repair is established. Parked for runtime-access diagnosis,
with the unfinished commands distinguished from completed verification. No
tracker payload or sweep is authorized by this record, and incomplete coverage
is not merge clearance.

## 2026-09-09

- **ITEM5-B exposed a drift-check applicability mismatch after #705.** The
Expand Down
48 changes: 30 additions & 18 deletions docs/kit-handoff.md
Original file line number Diff line number Diff line change
Expand Up @@ -14,25 +14,37 @@
> Older session blocks graduate to [`kit-handoff-history.md`](kit-handoff-history.md) once
> this file crosses its line budget (`scripts/check_doc_budget.py`).

Last updated: 2026-09-11 — ITEM5-B source follow-up approved; retained update remains separate.
Last updated: 2026-09-11 — source repair delivered; revised retained-update decision prepared.
Phase 5 delivery item 5 remains incomplete; item 6's replay remains complete.

## Latest session — 2026-09-11 (ITEM5-B source-review follow-up, in Codex)

The operator approved the kit-only source repair, tests/release metadata, required
review and merge when clean, followed by preparation of a revised retained-update
packet. The [source repair record](../saved_plans/phase5-item5-b-source-review-repair_2026-09-11.md)
retains the exact approval, complete pre-fix review receipt and author verification.
[PR #734](https://github.com/topij/agentic-dev-kit/pull/734) carries that work; #733
preserves the earlier unapproved packet and incomplete review history.

No retained fixture/source update is approved. The special-file-root limitation,
ownership/function/field-exit distinctions, item 6/replay completion, #723 deferral,
#585 placement and delivered #724/#722 batch remain. The friction sweep stays parked.

▶ Next: complete PR #734's required review and pr-watch, merge under the explicit
operator authority, then prepare the revised packet against the delivered source.
Obtain its exact retained-update approval before execution. Fixture merge stays excluded.
## Latest session — 2026-09-11 (ITEM5-B revised retained-update packet, in Codex)

The operator-approved source repair [#734](https://github.com/topij/agentic-dev-kit/pull/734)
merged as `7e0232ed871b37a315c5509c97b83d3b00b1a3fd`, from reviewed head `7224547da0c766a4fd9ee5791e53ddb3f7db6cdf`. Its
[delivery checkpoint](https://github.com/topij/agentic-dev-kit/pull/734#issuecomment-5637494093)
retains the exact-head watch/merge, complete panel receipts, CodeRabbit disposition
and local #393 versus hosted verification limits. Separate shell parses account for
#561's recipe gap. The source repair did not update the retained installation.

The [UPDATE-03 packet](../saved_plans/phase5-item5-b-update03-decision_2026-09-11.md)
selects that immutable source and binds payloads, write ledger, baseline prediction,
preservation, verification, limits, rollback and an exact approval question. Its
read-only audit and forge records retain post-acceptance checkpoint comparisons.
The packet retains complete review receipts before its audit-ordering correction,
with earlier UPDATE-03 questions/evidence preserved and the current `-r5` binding
explicit. The packet records unresolved generic-upgrade bootstrap findings outside
its proposed execution; no further source repair or approved deferral is claimed. PR #733 owns packet review/delivery. UPDATE-01 is consumed; UPDATE-02 and its old
Comment thread
coderabbitai[bot] marked this conversation as resolved.
questions, payloads, ledgers and incomplete review receipts remain preserved.

No retained update is approved. Ownership acceptance does not establish custom
wrap-up functionality, client verification or field exit. The accepted inherited
special-file-root limitation remains. Item 6/replay, #723's approved deferral,
#585's earlier placement and #724's delivered #722 batch are preserved. The friction
sweep stays parked; no credited exercise is repeated.

▶ Next: revalidate UPDATE-03's bound inputs and obtain its exact approval before
retained execution. Fixture PR continuation requires a separate decision; fixture
merge stays excluded.

______________________________________________________________________

Expand All @@ -59,7 +71,7 @@ Ownership acceptance does not establish functionality or field exit. The repair
not update the retained installation. Item 6's replay, #723's deferral, #585's earlier
placement and #724's delivered #722 batch are preserved. The friction sweep stays parked.

The latest session block owns the subsequent source follow-up and next decision.
The latest session block owns the revised packet and next decision.

______________________________________________________________________

Expand Down
18 changes: 13 additions & 5 deletions saved_plans/codex-parity-plan_2026-08-23.md
Original file line number Diff line number Diff line change
Expand Up @@ -451,11 +451,19 @@ historical observation it was and is not silently refreshed.
inherited FIFO-root gap and P3 root-symlink coverage gap; the [follow-up packet](phase5-item5-b-review-followup-decision_2026-09-10.md)
was approved as ITEM5-B-KIT-REVIEW-02 on 2026-09-11. The [follow-up execution](phase5-item5-b-review-followup-execution_2026-09-11.md)
records the applied scope, final panel and separately authorized merge of kit #731 as
`e6d6e77d118454349f8e8bb046e99ef3009c5f5c`. The subsequent UPDATE-02 preparation
in #733 led to the separately approved [source-review repair](phase5-item5-b-source-review-repair_2026-09-11.md)
in #734. Complete its required review and merge when clean, then prepare the
revised exact retained-update packet. Neither repair approval nor kit merge
authorizes retained execution. Preserve the old packet and review receipts.
`e6d6e77d118454349f8e8bb046e99ef3009c5f5c`. UPDATE-02 preparation in #733 led
to the separately approved [source-review repair](phase5-item5-b-source-review-repair_2026-09-11.md),
delivered by #734 at `7e0232ed871b37a315c5509c97b83d3b00b1a3fd`. The
[UPDATE-03 packet](phase5-item5-b-update03-decision_2026-09-11.md) proposes the
revised exact local retained update after fresh read-only checkpoint checks.
Its current `-r5` binding retains the audit and dependent-command isolation correction,
corrects copied provenance, and preserves unresolved generic-upgrade source findings
outside the proposed execution;
earlier UPDATE-03 questions and evidence remain historical and unanswered.
Obtain its exact approval before execution; neither repair approval nor kit
record merge supplies it. UPDATE-02's old question, payloads, ledger and review
evidence remain preserved. Fixture PR continuation needs a separate exact
CI/body/publication decision.
Fixture merge remains excluded; the nonfunctional custom
wrap-up carries ownership acceptance only. No original continuity or prior field
credit was recreated.
Expand Down
Original file line number Diff line number Diff line change
Expand Up @@ -92,8 +92,12 @@ field exit are separate. Item 6's completed replay is preserved without repeat o
credit for cs-toolkit #2222/#2223/#2255. Kit #723 remains the approved upstream deferral;
#585 stays earlier outside Phase 6; #724 delivered the #722 batch. The friction sweep stays parked.

**Next:** prepare the exact retained-update decision packet for the merged #731 repair.
Revalidate read-only against the
**Next:** revalidate the [UPDATE-03 packet](phase5-item5-b-update03-decision_2026-09-11.md)
and obtain its exact approval before retained execution. The separately approved
source follow-up was delivered by #734; the revised packet selects its immutable
merge. Historical UPDATE-02 questions, payloads, ledgers and review evidence remain
preserved. Neither source repair nor kit record merge authorizes retained execution.
The revised packet revalidates read-only against the
[post-acceptance retention checkpoint](phase5-item5-b-review-followup-evidence_2026-09-10/retained-final.json.gz)
and [fixture forge checkpoint](phase5-item5-b-acceptance-execution-evidence_2026-09-10/forge-after-exit.json).
Use the current checkpoint inventory/identity comparison, not the historical UPDATE
Expand Down
24 changes: 14 additions & 10 deletions saved_plans/phase5-item5-b-source-review-repair_2026-09-11.md
Original file line number Diff line number Diff line change
Expand Up @@ -44,16 +44,20 @@ with the assigned heading in the working tree. This targeted correction does not
turn the earlier full run into a passing one. The focused workflow/hook run and
individual shell parses covering #561 are retained alongside it.

Required independent review and delivery receipts belong to PR #734. Do not infer
source coverage from retained-fixture results or incomplete reviewers. The repair
preserves #393 and #561 as separate limitations; it changes neither implementation.

**Next:** complete PR #734's required review and pr-watch, then merge under the
operator's scoped authority. Prepare a replacement retained-update packet against
the delivered immutable source with a fresh read-only checkpoint comparison, new
hash-bound payloads/ledger/baseline prediction, preservation/verification/rollback
and exact approval question. Preserve UPDATE-01's consumed decision and historical
UPDATE-02 records. No retained update follows without its separate exact approval.
The [delivery checkpoint](https://github.com/topij/agentic-dev-kit/pull/734#issuecomment-5637494093)
retains the completed independent reports, CodeRabbit disposition and exact-head
watch/merge. `gh pr view 734 --repo topij/agentic-dev-kit` with the JSON fields in
that checkpoint, from `/Users/topi/Coding/agentic-dev-kit` at
`7224547da0c766a4fd9ee5791e53ddb3f7db6cdf` on 2026-09-11, read back merge `7e0232ed871b37a315c5509c97b83d3b00b1a3fd`.
The source repair preserves #393 and #561 as separate limitations; their
implementations are unchanged. No source coverage is inferred from retained-fixture
results or historically incomplete reviewers.

**Next decision:** the [UPDATE-03 packet](phase5-item5-b-update03-decision_2026-09-11.md)
selects the delivered immutable source with fresh checkpoint evidence, bound payloads,
ledger/baseline prediction, preservation/verification/rollback and an exact question.
UPDATE-01 remains consumed and historical UPDATE-02 records remain unchanged.
No retained update follows without its separate exact approval.

Phase 5 item 5 remains incomplete; item 6 and replay evidence remain complete.
Do not repeat or re-credit cs-toolkit #2222/#2223/#2255. #723 remains the approved
Expand Down
Loading
Loading