Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
52 changes: 28 additions & 24 deletions docs/kit-handoff.md
Original file line number Diff line number Diff line change
Expand Up @@ -14,32 +14,36 @@
> Older session blocks graduate to [`kit-handoff-history.md`](kit-handoff-history.md) once
> this file crosses its line budget (`scripts/check_doc_budget.py`).

Last updated: 2026-09-11 — approved ITEM5-B review follow-up applied; operator merge hold.
Last updated: 2026-09-11 — ITEM5-B kit repair merged; retained-update decision remains separate.
Phase 5 delivery item 5 remains incomplete; item 6's replay remains complete.

## Latest session — 2026-09-11 (ITEM5-B review follow-up, in Codex)

The operator approved ITEM5-B-KIT-REVIEW-02 as scoped. The [execution record](../saved_plans/phase5-item5-b-review-followup-execution_2026-09-11.md)
binds authority, pre-fix review receipts, original bytes and applied hashes. The kit
documents the accepted inherited special-file-root limitation and adds root-symlink
compatibility tests with the supplied release manifest. A FIFO can still obstruct
engine state persistence; the approval does not claim that mechanism is repaired.

`make test` in `/Users/topi/Coding/agentic-dev-kit` at
`1d6c5413148c46ee7a0a4cf86e47e403632610fb` on 2026-09-11 reached pytest's terminal summary with the disclosed #393
failure. The execution evidence retains the actual result, manifest self-check and
separate #561 shell parses. [PR #731](https://github.com/topij/agentic-dev-kit/pull/731)
owns the final full-panel reports, hosted results and exact head-bound disposition.
Repair merge remains operator-held; an earlier review is not evidence for a later head.

No retained update, baseline refresh, initialization, client/profile/tracker exercise
or fixture merge was performed. Ownership acceptance does not establish functionality
or field exit. Item 6's replay, #723's deferral, #585's earlier placement and #724's
delivered #722 batch are preserved. The friction sweep stays parked.

▶ Next: `$session-start` — read back PR #731's final review/CI disposition and exact
reviewed head, then decide operator merge. Keep retained updates separately scoped;
do not repeat UPDATE-01 or the completed replay.
## Latest session — 2026-09-11 (ITEM5-B repair delivery, in Codex)

The operator approved ITEM5-B-KIT-REVIEW-02 and subsequently said “merge when ready.”
[PR #731](https://github.com/topij/agentic-dev-kit/pull/731) merged as
`e6d6e77d118454349f8e8bb046e99ef3009c5f5c`, from reviewed head
`1bd4e10b423b0b4b230fb1a481bbc477de784a61`. The
[merge checkpoint](https://github.com/topij/agentic-dev-kit/pull/731#issuecomment-5629015678)
retains the exact-head merge, forge readback and completed review disposition.
The [execution record](../saved_plans/phase5-item5-b-review-followup-execution_2026-09-11.md)
links the complete panel reports and distinguishes hosted success from the disclosed
local #393 failure. The accepted inherited special-file-root limitation remains;
separate shell parses covered #561's omitted checks without repairing its recipe.

The resume readback used `gh pr view 731` and `gh run list` with the kit repository
and merge SHA from `/Users/topi/Coding/agentic-dev-kit` at
`1bd4e10b423b0b4b230fb1a481bbc477de784a61` on 2026-09-11: merge confirmed and
[post-merge Test run](https://github.com/topij/agentic-dev-kit/actions/runs/34558574354) succeeded.
This record follow-up began from that protected-main merge.

Ownership acceptance does not establish functionality or field exit. The repair did
not update the retained installation. Item 6's replay, #723's deferral, #585's earlier
placement and #724's delivered #722 batch are preserved. The friction sweep stays parked.

▶ Next: prepare the exact retained-update decision packet for the merged #731 repair,
starting from the post-acceptance checkpoint linked in the execution record. Preparation
is authorized; execution needs its own exact decision. Do not repeat UPDATE-01 or the
completed replay, refresh the baseline, exercise clients/profiles/trackers, or merge the fixture PR.

______________________________________________________________________

Expand Down
8 changes: 5 additions & 3 deletions saved_plans/codex-parity-plan_2026-08-23.md
Original file line number Diff line number Diff line change
Expand Up @@ -447,11 +447,13 @@ historical observation it was and is not silently refreshed.
PR-01 is paused at the recorded P2 inherited detector gap and P3 wording
imprecision. The [kit-only repair decision](phase5-item5-b-review-repair-decision_2026-09-10.md)
was approved on 2026-09-10. The [kit repair execution](phase5-item5-b-kit-repair-execution_2026-09-10.md)
carries the applied kit scope and operator merge hold. Its panel recorded a P2
carries the applied kit scope and pre-fix review receipts. Its panel recorded a P2
inherited FIFO-root gap and P3 root-symlink coverage gap; the [follow-up packet](phase5-item5-b-review-followup-decision_2026-09-10.md)
was approved as ITEM5-B-KIT-REVIEW-02 on 2026-09-11. The [follow-up execution](phase5-item5-b-review-followup-execution_2026-09-11.md)
owns the applied scope and exact reviewed-head operator merge decision. No retained update is authorized
by that approval. Fixture merge remains excluded; the nonfunctional custom
records the applied scope, final panel and separately authorized merge of kit #731 as
`e6d6e77d118454349f8e8bb046e99ef3009c5f5c`. Prepare the next exact retained-update
decision packet; neither repair approval nor kit merge authorizes its execution.
Fixture merge remains excluded; the nonfunctional custom
wrap-up carries ownership acceptance only. No original continuity or prior field
credit was recreated.
Delivery item 6 is independent of these paths. The approved
Expand Down
5 changes: 3 additions & 2 deletions saved_plans/phase5-item5-b-acceptance-execution_2026-09-10.md
Original file line number Diff line number Diff line change
Expand Up @@ -198,8 +198,9 @@ preserves completed item 6 and its replay evidence, cs-toolkit #2222/#2223/#2255
The friction-log sweep remains parked; no tracker payload or new intake was started.

**Next:** follow the [approved kit repair execution](phase5-item5-b-kit-repair-execution_2026-09-10.md)
through the approved REVIEW-02 follow-up to its operator merge decision. A later retained-fixture update still needs its own
exact decision; keep the systemize field-exit matrix and fixture merge separate.
through its REVIEW-02 execution record's verified #731 merge, then prepare the exact
retained-update decision packet. Retained execution still needs its own exact decision;
keep the systemize field-exit matrix and fixture merge separate.

## Kit record review amendment

Expand Down
13 changes: 7 additions & 6 deletions saved_plans/phase5-item5-b-kit-repair-execution_2026-09-10.md
Original file line number Diff line number Diff line change
Expand Up @@ -51,10 +51,10 @@ retain argv, directory, revision, timestamps, environment and output hashes.
and `sh -n init.sh` exited successfully. These explicitly cover #561's omitted parses;
they do not repair the recipe or establish shell behavior.

The independent adversarial/correctness reports, actual rollout compute, mutations,
restoration evidence, hosted results and final exact-head disposition belong on the
repair PR. Read that disposition and revalidate its head before any merge decision;
an earlier fixture or record panel does not review this implementation.
The [follow-up execution](phase5-item5-b-review-followup-execution_2026-09-11.md)
links the repair PR's final independent reports, actual rollout compute, mutations,
restoration evidence, hosted results and exact-head disposition. It also records the
subsequently authorized merge; earlier fixture or record panels do not review this implementation.

## Preservation, limits and rollback

Expand Down Expand Up @@ -90,5 +90,6 @@ pre-fix receipts remain in the [follow-up packet](phase5-item5-b-review-followup
The operator approved that follow-up on 2026-09-11; its [execution record](phase5-item5-b-review-followup-execution_2026-09-11.md)
owns the subsequent payloads and review handoff. The earlier panel is not a receipt for a later head.

**Next:** follow that execution to PR #731's exact reviewed-head operator merge decision.
A retained update still needs a separate exact decision; UPDATE-01 is consumed and fixture merge is excluded.
**Next:** follow that execution's verified #731 merge and prepare the exact retained-update
decision packet. A retained update still needs a separate exact execution decision;
UPDATE-01 is consumed and fixture merge is excluded.
Original file line number Diff line number Diff line change
Expand Up @@ -4,7 +4,10 @@
question below. The [execution record](phase5-item5-b-review-followup-execution_2026-09-11.md)
binds that authority to the unchanged proposal ledger and applied payloads. The
preparation evidence retains its historical approval fields and hashes. The inherited
special-file-root limitation is accepted for this repair; it is not fixed. Merge remains operator-held.
special-file-root limitation is accepted for this repair; it is not fixed.
**Delivery amendment, 2026-09-11:** the operator later said “merge when ready”; the
execution record links the verified #731 merge. That separate authorization discharged
the merge hold without changing the preserved approval question or repair ledger.

The preserved proposal and its verification/rollback requirements follow.

Expand Down
46 changes: 39 additions & 7 deletions saved_plans/phase5-item5-b-review-followup-execution_2026-09-11.md
Original file line number Diff line number Diff line change
Expand Up @@ -42,10 +42,36 @@ The following ran in `/Users/topi/Coding/agentic-dev-kit` at `1d6c5413148c46ee7a

The [evidence index](phase5-item5-b-review-followup-execution-evidence_2026-09-11/sha256.json)
retains complete command metadata, raw output, authority, original bytes, applied hashes
and compressed retention checkpoints. A fresh full adversarial/correctness panel and
hosted CI are required at the published review head. Their complete reports, actual
rollout compute and final head-bound disposition belong on PR #731; read them back
before deciding merge. No earlier receipt automatically covers that head.
and compressed retention checkpoints.

## Final review and separately authorized delivery

The full [adversarial report](https://github.com/topij/agentic-dev-kit/pull/731#issuecomment-5628936492)
and [correctness report](https://github.com/topij/agentic-dev-kit/pull/731#issuecomment-5628930335)
reviewed `1bd4e10b423b0b4b230fb1a481bbc477de784a61` against
`f408039dc3a9b0d2e0e8d246c126af892839cee8` on 2026-09-11. Their complete command
records name the private directories, actual rollout compute, terminal `make test`
results, behavioral mutations and restoration checks. Each local suite reached the
disclosed #393 failure; the reports do not claim a passing local suite. The
[panel disposition](https://github.com/topij/agentic-dev-kit/pull/731#issuecomment-5628956860)
binds their findings to that exact head. CodeRabbit declined the full-review request;
the [refusal disposition](https://github.com/topij/agentic-dev-kit/pull/731#issuecomment-5628983875)
records why the completed panel remains the independent review evidence.

The operator subsequently said “merge when ready.” The
[merge checkpoint](https://github.com/topij/agentic-dev-kit/pull/731#issuecomment-5629015678)
records the `gh pr merge 731 --squash --match-head-commit` operation, final non-persisting
watch result and forge readback from `/Users/topi/Coding/agentic-dev-kit` at that reviewed
SHA on 2026-09-11. PR #731 merged as `e6d6e77d118454349f8e8bb046e99ef3009c5f5c`.
This later authorization discharged the merge hold; it did not widen the repair ledger.

Resume reads on 2026-09-11 in the same cockpit at the reviewed SHA used
`gh pr view 731 --repo topij/agentic-dev-kit --json url,state,isDraft,headRefOid,mergedAt,mergeCommit,baseRefName`
and `gh run list --repo topij/agentic-dev-kit --commit e6d6e77d118454349f8e8bb046e99ef3009c5f5c --json databaseId,name,status,conclusion,url,headSha`.
They confirmed the merge and the successful terminal
[post-merge Test run](https://github.com/topij/agentic-dev-kit/actions/runs/34558574354).
`gh api repos/topij/agentic-dev-kit/branches/main` confirmed that merge as protected main.
The ordinary record follow-up began from this merge, preserving the reviewed repair head.

## Preservation and next action

Expand All @@ -66,6 +92,12 @@ field exit are separate. Item 6's completed replay is preserved without repeat o
credit for cs-toolkit #2222/#2223/#2255. Kit #723 remains the approved upstream deferral;
#585 stays earlier outside Phase 6; #724 delivered the #722 batch. The friction sweep stays parked.

**Next:** read PR #731's final review/CI disposition and decide operator merge of its
exact reviewed head. This execution approval excludes merge. A later retained update
needs its own exact decision; UPDATE-01 is consumed and fixture PR merge is excluded.
**Next:** prepare the exact retained-update decision packet for the merged #731 repair.
Revalidate read-only against the
[post-acceptance retention checkpoint](phase5-item5-b-review-followup-evidence_2026-09-10/retained-final.json.gz)
and [fixture forge checkpoint](phase5-item5-b-acceptance-execution-evidence_2026-09-10/forge-after-exit.json).
Use the current checkpoint inventory/identity comparison, not the historical UPDATE
FINAL equality assertions as a current-state check. Preserve the original missing paths.
Preparation is authorized; retained execution needs its own exact write ledger and
decision. UPDATE-01 is consumed; baseline refresh, initialization, client/trust/profile
exercises, tracker payloads and fixture PR closure/merge retain their separate decisions.
Original file line number Diff line number Diff line change
Expand Up @@ -6,7 +6,8 @@ owns the subsequent application and review handoff. The proposal ledger and evid
retain their preparation-time fields and hashes; the execution authority record binds
the approval without rewriting that historical input. The [review follow-up](phase5-item5-b-review-followup-decision_2026-09-10.md)
was approved on 2026-09-11; its [execution](phase5-item5-b-review-followup-execution_2026-09-11.md)
owns the subsequent review handoff. Repair merge remains operator-held.
owns the subsequent review and verified #731 merge. The operator separately authorized
that merge on 2026-09-11; the preserved proposal below retains its original merge hold.

The preserved preparation scope follows. `ITEM5-B-KIT-REVIEW-01` is separate scope. ACCEPT-01
accepted the preserved-file ownership outcomes. PR-01 applied its exact fixture
Expand Down
Loading