Repository navigation
Hard scenario remixes: irregular land, shaped terrain, woods and park rules (+ Mossgrove Isle) - #190
Merged
Merged
Conversation
…and add Mossgrove Isle Co-authored-by: Nori <contact@tilework.tech>
…notes Co-authored-by: Nori <contact@tilework.tech>
… island core Co-authored-by: Nori <contact@tilework.tech>
Co-authored-by: Nori <contact@tilework.tech>
…p-heavy tests Co-authored-by: Nori <contact@tilework.tech>
Co-authored-by: Nori <contact@tilework.tech>
…sign doc draft Co-authored-by: Nori <contact@tilework.tech>
… park map Co-authored-by: Nori <contact@tilework.tech>
Co-authored-by: Nori <contact@tilework.tech>
…rated play Co-authored-by: Nori <contact@tilework.tech>
… and bands, offset gate corridor, real pre-remix save fixture Co-authored-by: Nori <contact@tilework.tech>
Co-authored-by: Nori <contact@tilework.tech>
…oof spec Co-authored-by: Nori <contact@tilework.tech>
Co-authored-by: Nori <contact@tilework.tech>
Co-authored-by: Nori <contact@tilework.tech>
Co-authored-by: Nori <contact@tilework.tech>
Co-authored-by: Nori <contact@tilework.tech>
jiro-by-nori Bot
added a commit
that referenced
this pull request
Nov 1, 2026
Co-authored-by: Nori <contact@tilework.tech>
Co-authored-by: Nori <contact@tilework.tech>
Contributor
Author
|
Proof: gallery · overview with ownership overlay: |
This was referenced Nov 1, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.



Summary
🤖 Generated with Nori
This remixes the four hard parks (Copper Ridge, Tidewater Docks, Thunderhead Mesa, Glacier Point) and adds a new Challenging park, Mossgrove Isle. Each is an original OpenCoaster design built from an RCT2 idea, with rough terrain, irregular parks, woods and build limits. The design matrix and citations are in docs/scenario-remixes.md. No original maps, layouts, park names, sprites or OpenRCT2 code are used.
Engine and scenario format (additive)
land.parcels: real non-rectangular ownership, painted from rect, ellipse and band shapes as owned, land for sale, rights for sale, or not for sale. Owned land must be one connected piece containing the gate apron. Not-for-sale parcels stay unbuyable after every sale is bought.terrain.shapesraise or lower ground to a level (ridges, benches, mesas, channels and inlets) while keeping legal slopes.terrain.apronOffsetmoves the small gate clearing along the gate edge.trees.stands(dense, random woods or rock fields) andtrees.clearings(also kept free of ambient trees). Trees and rocks are ordinary solid scenery.landscapeandchallengetext on the title screen, alongside the Park rules from Scenario restrictions: tree, landscaping, height, ride-type and marketing rules #188. Previews are rendered from the real park map (prepareScenarioPark).src/save/fixtures/copper-ridge-pre-remix.ocsave.gz).The five parks
Test plan
pnpm testin CI, typecheck, lint, format, build: green.src/sim/scenario/hard-scenarios.test.ts: one connected non-rectangular owned piece; parcels stay locked after buying everything; gate clearing 60–420 tiles; height variation; each park's own feature (benches, rights-only water, shelves, lake and mountains, woods and open trails).bench/hard-parks.test.ts: each park played legally with real cash. Gate, stalls and first ride open; then the defining move is built and used by guests:Each park's rules are also checked against a control run with the rules removed.
Balance, before (main, old maps and scripts) → after (site plans, 12 seeds; details in docs/BALANCE.md#hard-park-remixes):
Tidewater and Thunderhead keep their goals, but no script has won them: this is reported, not hidden. Unchanged parks all stay at 12/12. The old flat-apron scripts can't build on the new ground; the hard parks now use site plans.
Browser proof (desktop and Pixel 8, WebGL2 and Canvas2D), reviewed: scenario list with terrain, challenge and rules; whole-map overviews with the Land rights overlay; gate views; built proof parks. Proof gallery. Headless SwiftShader crashes on WebGL2 whole-map and imported-park views (it does the same on
mainwith unchanged parks), so those views are Canvas2D.Known and pre-existing (also failing on
main, not in CI):e2e/land-ownership.spec.ts(clicks owned tile 16,41) ande2e/context-menu.spec.tspatrol right-click time out. Otherwisee2e:quickand the scenario-selection spec pass.Owner request: https://demo.norisessions.com/chat/01a16c13-c814-7295-9955-b11ff875ed14
Share Nori with your team: https://www.npmjs.com/package/nori-skillsets
Co-authored-by: Nori contact@tilework.tech