-
Notifications
You must be signed in to change notification settings - Fork 24
Case Study Critical Path Review
Type: OPTIMIZE Skills: cc-performance-tuning Focus: Measure-first principle - knowing when NOT to optimize
This example shows cc-performance-tuning correctly deciding NOT to optimize. The skill identified redundant loops but concluded they weren't worth fixing because the code isn't in the critical path.
User: "use perf tuning to review this code"
→ cc-performance-tuning: Critical Path Review
→ Is this in the critical path (<4% causing >50% runtime)?
→ NO - I/O-bound, not CPU-bound
→ Check anti-patterns anyway
→ Found 2 warnings, but verdict: not worth fixing
| Factor | Assessment |
|---|---|
| Trigger frequency | User-initiated, ~few times/minute |
| Operation type | Window move = RPC to server (network I/O dominates) |
| Hot path? | NO - I/O-bound, not CPU-bound |
Conclusion: RPC call is ~1000x more expensive than any local computation.
| Item | Status | Evidence |
|---|---|---|
| Measured before tuning? | N/A | Not a tuning change |
| Redundant loop | WARNING | Two separate loops over AllDisplays |
| Redundant loop | WARNING | Loop to find name when UUID already found |
| Work inside loop | PASS | Only simple arithmetic |
| Expensive operation in loop | PASS | Map lookup is O(1) |
WARNING #1: Two methods both iterate over AllDisplays separately.
- Impact: Negligible (1-3 entries, user-triggered)
- Verdict: Not worth fixing
WARNING #2: Display name could be captured in first loop instead of looping again.
- Impact: Negligible
- Verdict: Not worth the refactoring complexity
| Metric | Value |
|---|---|
| Added operations per move | ~6 map lookups + 2-3 small loops |
| Typical AllDisplays size | 1-3 entries |
| Dominant cost | RPC to server (~1000x more expensive) |
| Overall impact | < 0.1% of operation time |
PASS - No performance issues requiring action.
Per McConnell: "If not worth profiling, not worth degrading readability for."
The skill found issues but correctly concluded: readability > micro-optimization for non-hot-path code. This is the "measure first" principle in action.
| Skill | Role |
|---|---|
| cc-performance-tuning | Critical path analysis, anti-pattern checklist |
Task Guides
Case Studies
- Picker History Review ⭐
- Comment Renumbering
- Critical Path Review
- Border Cleanup
- Picker Text Overflow
- Tab Indicator Removal
- Picker Focus Bug
- Window Picker Plan
Reference