Skip to content

Dome on two graphics cards: opacity test reverted, symptom documented, CPU route backlogged - #1143

Draft
rulkens wants to merge 1 commit into
mainfrom
docs/dome-two-card-findings
Draft

rulkens wants to merge 1 commit into
mainfrom
docs/dome-two-card-findings

Conversation

@rulkens

@rulkens rulkens commented Nov 17, 2026

Copy link
Copy Markdown
Owner

Follow-up to the on-site dome test of 2026-11-17. Four changes, no behaviour change beyond the revert.

  1. Revert the October field test. src/styles/global.css: opacity: 0.99 on the dome canvas (fix(dome): opacity 0.99 on the dome canvas as a projector field test #944) and its comment are gone. It did not help.
  2. Dome setup docs. A short section for a dome computer that spreads its projectors over two graphics cards (some projectors show the interface and no sky; seen on one system; no fix yet), and one sentence that a Wi-Fi which keeps devices apart can block every port.
  3. New backlog item. "CPU present route for domes on two graphics cards" (needs-design), with a detail file that records the measurements, the source check, the prototype's shape and the switch test for the next visit. The owner ruled that the switch test comes first and the build decision after it.
  4. Public-relay backlog detail. A dated note with the on-site evidence: the dev-server relay was unreachable on a Wi-Fi that isolates devices, and the remote worked through a public address.

Claims about the mechanism are limited to what was measured on site or read in Chromium and Dawn source. What the NVIDIA driver does per card, and whether the cards run Mosaic, are listed as not verified.

Checks run: npm run format, npx vitest run tests/packages/website (59 files passed, 1 skipped), npm run typecheck:fast (0 errors).

🤖 Generated with Claude Code

…ptom, backlog the CPU route

- global.css: drop opacity 0.99 on the dome canvas (#944); it did not help.
- dome-setup docs: projectors on a second card can show the interface and no sky; a Wi-Fi that keeps devices apart can block every port.
- Backlog: CPU present route for two-card domes, with the on-site measurements and the source check.
- Public-relay backlog detail: on-site evidence from 2026-11-17.
@cloudflare-workers-and-pages

Copy link
Copy Markdown

Deploying with  Cloudflare Workers  Cloudflare Workers

The latest updates on your project. Learn more about integrating Git with Workers.

Status Name Latest Commit Preview URL Updated (UTC)
✅ Deployment successful!
View logs
skymap 02e610b Commit Preview URL

Branch Preview URL
Nov 17 2026, 05:20 PM

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant