Phaethon: Multi-Node Cyprus Grid Stability & Control Simulation

This repository contains a 5-node isolated power system simulation modeled after the transmission network of Cyprus. It analyzes the risk of cascading distributed photovoltaic (PV) disconnections following a severe generation contingency (unit trip) and evaluates structural mitigation strategies through Grid-Forming (GFM) BESS, Grid-Following (GFL) BESS, and Synchronous Condensers.

Transmission Network & Grid Layout

The framework separates the Cyprus 132/220 kV grid into 5 distinct geographical nodes based on actual load centers and generation hubs:

  1. Node 0: Vasilikos (South) - The primary conventional generation center. This node hosts the 130 MW contingency trip (Vasilikos Unit 5).
  2. Node 1: Limassol (South-West) - A heavy industrial and commercial load center.
  3. Node 2: Athalassa (Center/Nicosia) - The main residential load center, hosting the utility-scale 120 MW Grid-Forming BESS defense.
  4. Node 3: Dhekelia (East/Larnaca) - Secondary generation hub, hosting the 30 MVar Synchronous Condenser for physical inertia injection.
  5. Node 4: Paphos (West) - High distributed PV penetration area, hosting the commercial GFL BESS fleet.

All nodes are interconnected through transmission line power flows modeled via real world synchronizing power coefficients ((K_{ij})).

Coordinated Defense Architecture

This project evaluates the multi tier defense scheme currently deployed or planned by Cyprus power authorities (TSO-Cyprus, CERA, and EAC):

  • Physical Inertia Base (Synchronous Condenser): Replicates the retrofitting of legacy thermal units at Dhekelia. It provides instantaneous physical spinning mass inertia ((H_{sc} = 1.5)) to damp the sub-second spatial RoCoF wavefront shocks before power electronics can react.
  • Digital Virtual Inertia (Grid-Forming VSM BESS): A 120 MW centralized asset at Athalassa emulating a rotating machine mass via Virtual Synchronous Machine (VSM) loops.
  • Fast Frequency Response (Grid-Following Fleet): A 150 MW private commercial battery array at Paphos utilizing an automated RoCoF derivative trigger (|RoCoF| ≥ 1.0 Hz/s) to bypass native telemetry and phase-locked loop (PLL) tracking latencies.
  • Inverter Fault Ride-Through (FRT): Models physical inverter protections (20% Legacy with 50 ms trip thresholds vs 80% Modern with 200 ms FRT timers).

Repository Layout

phaethon/
│
├── src/
│   └── pv_cascade.py        # 5-node swing equations, power flows, and BESS/SC controls
│
├── experiments/
│   └── run_cascade.py       # Automated 3-scenario sensitivity sweep execution script
│
├── results/                 # Output performance metrics and comparative charts
│   ├── sweep_results.csv
│   ├── pv_disconnection_comparison.png
│   └── grid_blackout_comparison.png
│
├── config.json              # Operational variables (TSO-Cyprus 650 MW Spring/Autumn layout)
├── requirements.txt
└── README.md

Mathematical Implementation

The multi-node differential state equations are solved simultaneously using a 4th-Order Runge-Kutta (RK4) integration solver operating at an explicit time step of $dt = 0.01$ seconds. This prevents numerical propagation and truncation errors, accurately capturing the interaction between network power flows, localized breaker timers, and sub-second battery control loops.

Execution and Validation

To set up the local environment and run the automated multi-scenario sweep:

pip install -r requirements.txt
PYTHONPATH=. python3 -m experiments.run_cascade

The script automatically executes and compares 3 distinct scenarios:

  1. 2026 Baseline: High PV penetration without storage arrays or synchronous condensers.
  2. 2027 GFM Only: Digital storage protection assets online, but without the Dhekelia spinning mass.
  3. 2027 Complete Defense: Coordinated configuration integrating both the GFM/GFL BESS fleet and the active Synchronous Condenser.

Outputs are compiled into results/ showcasing how physical inertia and coordinated fast frequency responses drop structural system blackout risk to 0% across high renewable operational envelopes.

About

A RK4 stability model analyzing distributed PV inverter cascading trips on the Cyprus isolated grid and validating multi tier GFM and FFR BESS controls.

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages