Repository navigation
Track live commands with /track (initial slice of #393) - #394
raiseCatError wants to merge 33 commits into
Conversation
…nd tracker limits
/track hardening review — exact-head verificationReview/fix head: Published PR CI 38715312969 completed successfully on attempt 1 at this head: both macOS and Ubuntu shards, Node 22 compatibility, Quality and aggregate Verify (22.x/26.x) all passed. PR-triggered Fedora and both timing smoke jobs are skipped by workflow design; they are not acceptance evidence here. Physical terminal/clipboard QA remains unperformed. Problems found and corrected: the first PR CI (38710353898) exposed missing Ask coverage and altered palette ranking; both were corrected without changing palette order. An intermediate macOS shard exposed two test-portability assumptions (OS-specific spawn error code and a width-clipped fallback message); assertions now check failure semantics and safety at the actual visible width. Earlier failed/cancelled runs remain recorded, not reclassified as flakes. Hardened behaviors:
Scope limits: This is an initial window-scoped |
|
v0.21 handoff (2026-10-18): Retargeted this draft from the released/stale |
|
v0.21 reconciliation: this draft's |
|
Closing as superseded by #416 (merged into
Verified in the v0.21.0 release audit against |
Goal
Initial implementation of #393 built on NMSh's existing finite-command
/watchscheduler. This is a post-v0.20 draft and must not merge into the ongoing v0.20 release candidate.Implemented
/track df -h /Volumes/T7Projectsand/track --every 5s -- docker system df; native alias sharing the scheduler and manager with/watch.Still outstanding in #393
Release coordination
Based on
release/v0.20.0for interface compatibility, not in v0.20 scope. Do not merge until separately approved. Frozen #359 branches, Opus release heads, site, tap and history are untouched. PR CI is new and must be checked; no claims of completed physical verification.Refs #393, #382, #388.