Fixes deferred from the v2.5.0 cut.
No due date•0/1 issues closedCapability grant enforcement, configuration split implementation, and the runtime/store seam extraction. Deliberately off the demonstration critical path.
No due date•0/1 issues closedContracts settled and everything the firmware demonstration depends on. Contracts land here even when their implementation belongs to the next train, so sibling repos do not build against a superseded authority model. Due date is the INTEGRATION FREEZE: everything merged, only end-to-end proof and triage remaining. Demo day is approximately 2026-09-15 — the week between exists because rc.3 and rc.4 both needed one. Both dates are estimates pending confirmation.
Overdue by 28 day(s)•Due by September 8, 2026•0/1 issues closed