You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Before starting, read AGENTS.md, docs/north-star.md (principles P1–P8, decisions D1–D17) and docs/roadmap.md. The acceptance criteria below and the roadmap's default definition of done are the definition of done.
Scope
An upload endpoint authenticated with a #83 key that has the write scope and is restricted to the project (never the public DSN key). Files are keyed by release, dist, URL path, and debug id. They are stored in the data directory with metadata in events.db.
Acceptance criteria
Tests for upload, overwrite, and auth. Uploads count toward the disk budget.
Foundation first: blocked by the Stage F exit gate, directly or through its dependencies. Backend code builds on the Effect services that own each responsibility after Stage F.
Agent parity (P8): every capability this issue adds to the UI ships with its MCP tool in the same PR or stack, calling the same Effect service (D14). Writes follow the feat: command layer with idempotent, scoped, previewable writes #84 conventions (request_id, dry_run, scopes).
Activity