Skip to content

Run temporary real-repository adoption validation - #25

Closed
hzw0813 wants to merge 4 commits into
mainfrom
chore/runtime-adoption-validation
Closed

Run temporary real-repository adoption validation#25
hzw0813 wants to merge 4 commits into
mainfrom
chore/runtime-adoption-validation

Conversation

@hzw0813

@hzw0813 hzw0813 commented Aug 14, 2026

Copy link
Copy Markdown
Owner

Purpose

One-time hosted real-repository validation only. Do not merge.

The validation completed successfully against the exact ProofDiff fix head 1f2e8b00e1c3923d4d678a933bec80ad605593ed:

  • pinned colinhacks/zod@2d90846af918af9602e088812d63a035d47cdbe4 + real Vitest 4.1.5 produced exact target observations after the fix
  • packages/zod/src/v3/tests/string.test.ts aggregated duplicate multi-project results into 110 passed tests
  • 57/58 selected targets were exactly observed
  • the mutation to packages/zod/src/v3/types.ts reached verified with strongest evidence related-test-file-passed
  • pinned vitest-dev/vitest@667c13954daff2d1bec8a866702da8934b9ce539 root workspace orchestration remained opaque with zero invented targeted checks

The validated fix was merged separately via PR #26. This temporary workflow branch is intentionally closed without merge.

@hzw0813 hzw0813 closed this Aug 14, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant