Repository navigation
docs(site): roadmap after desync, fallbacks and the second audit - #181
Merged
Merged
Conversation
Done: desync outbound, Xray-style fallbacks and XHTTP over HTTP/3, egress guard and CA roots, speed groups, the second audit (#166-#178), sing-box interop, MikanApp and the panel on Citrus. In progress: beta.3 with the changelog for #149-#180, the manual mihomo sync (17 commits, ten conflicting files), what is left of the panel move. New section with the core-side tasks from the mikan development plan (13, E2, E4, 19, desync in MikanApp); sing-mux sub-stream limit and the fork tags under decisions.
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
The roadmap was last edited on 2026-10-20 (#149). This brings it to the current
dev, in Russian and English.Done: the desync outbound (#163, #172, #180), VLESS/Trojan fallbacks and
fallback-page(#159, #153), XHTTP over HTTP/3 (#160),egress-guard(#162),tls.ca-rootsand the CA denylist (#161), speed groups (#151), the second audit of the whole core (#166–#171, #176–#178) and the Windows TUN forwarding check (#157), sing-box interop and the race detector on the inbound suite (#158, #150). MikanApp and the panel'sgo.modon Citrus move from "In progress" to "Done".In progress: beta.3 with the changelog for #149–#180; the manual mihomo sync (17 upstream commits conflict in ten files; the weekly workflow cannot open an issue or PR in this org); what is left of the panel move (PQ REALITY and
pqv=,max-time-differencein ms, e2e/slice on a Citrus image). The/eventsand controllersecretitems are dropped: the panel embeds the core as a library.New section "For the mikan panel and apps": the core-side tasks from the mikan development plan — paid access after expiry via
IN-USER(13), a special mode for MikanApp/Kabosu (E2), desync in MikanApp, embeddable builds (E4), a Citrus page on the mikan site (19).Needs a decision: the weekly sync item moves to "In progress"; added the sing-mux sub-stream limit; fork tags now list restls-client-go and the pseudo-versions.
Checked:
pnpm buildpasses (49 pages), every internal link and the#root-certificates/#корневые-сертификатыanchors resolve indist/.