Skip to content

docs(site): roadmap after desync, fallbacks and the second audit - #181

Merged
Nemu-x merged 4 commits into
devfrom
docs/roadmap-november
Nov 10, 2026
Merged

Nemu-x merged 4 commits into
devfrom
docs/roadmap-november

Conversation

@Nemu-x

@Nemu-x Nemu-x commented Nov 9, 2026

Copy link
Copy Markdown
Collaborator

The roadmap was last edited on 2026-10-20 (#149). This brings it to the current dev, in Russian and English.

Done: the desync outbound (#163, #172, #180), VLESS/Trojan fallbacks and fallback-page (#159, #153), XHTTP over HTTP/3 (#160), egress-guard (#162), tls.ca-roots and the CA denylist (#161), speed groups (#151), the second audit of the whole core (#166–#171, #176–#178) and the Windows TUN forwarding check (#157), sing-box interop and the race detector on the inbound suite (#158, #150). MikanApp and the panel's go.mod on Citrus move from "In progress" to "Done".

In progress: beta.3 with the changelog for #149–#180; the manual mihomo sync (17 upstream commits conflict in ten files; the weekly workflow cannot open an issue or PR in this org); what is left of the panel move (PQ REALITY and pqv=, max-time-difference in ms, e2e/slice on a Citrus image). The /events and controller secret items are dropped: the panel embeds the core as a library.

New section "For the mikan panel and apps": the core-side tasks from the mikan development plan — paid access after expiry via IN-USER (13), a special mode for MikanApp/Kabosu (E2), desync in MikanApp, embeddable builds (E4), a Citrus page on the mikan site (19).

Needs a decision: the weekly sync item moves to "In progress"; added the sing-mux sub-stream limit; fork tags now list restls-client-go and the pseudo-versions.

Checked: pnpm build passes (49 pages), every internal link and the #root-certificates / #корневые-сертификаты anchors resolve in dist/.

Done: desync outbound, Xray-style fallbacks and XHTTP over HTTP/3,
egress guard and CA roots, speed groups, the second audit (#166-#178),
sing-box interop, MikanApp and the panel on Citrus.

In progress: beta.3 with the changelog for #149-#180, the manual mihomo
sync (17 commits, ten conflicting files), what is left of the panel move.

New section with the core-side tasks from the mikan development plan
(13, E2, E4, 19, desync in MikanApp); sing-mux sub-stream limit and the
fork tags under decisions.
The sync from mihomo (#182, #184) and the sing-mux sub-stream limit (#187)
move to Done; the core side of access after a subscription ends (#189)
is done, the panel part stays; the beta.3 changelog is ready (#185); the
fork tags are chosen and wait for publishing.
@Nemu-x
Nemu-x merged commit e268c1c into dev Nov 10, 2026
2 checks passed
@Nemu-x
Nemu-x deleted the docs/roadmap-november branch November 10, 2026 11:52
Nemu-x added a commit that referenced this pull request Nov 11, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant