Current delivery state — November 13
Native Server 3.9.1 is published and qualified: source 7d7ad9d6c9aee2e4592d74389ba9efd36e741f44, index sha256:946c65eb70e8b4b7c4694be8a181c9669d46c3408b80d4e44d96f2030ea3cf51. Publication/scans, the exact published corpus, four Compose cells, protected promotion and final Release passed. This delivers the bounded oversized-body response and explicit completion-limit discovery producer; its default completion wire cap is 33,554,432 bytes. Exact publication/qualification record.
This issue remains open for actual client and embedded delivery:
- Python owns installed PyPI 2.17.1 real Worker within/over-limit and same-worker follow-up qualification on that producer.
- PHP owns the merged planner/continuation correction, its qualified package publication and installed within/over-limit Worker repeats. Published 3.18's earlier planner limitation is not cleared by source or Server publication alone.
- Rust owns its 4.16 candidate/package publication and registry-only repeats. The corrected runner has passed the full Worker cell from the unchanged prepublication archive: 300 completed activities, over-limit nonretryable structural failure with zero partial activities, and same-worker follow-up/shutdown. That is candidate evidence, not a published 4.16 result; the earlier shutdown-bound harness failure remains a nonpass.
- Workflow owns locating any existing named-published embedded fan-out/budget evidence first, or running the bounded embedded acceptance after its current 2.29 release priority. Native/SDK source proof cannot substitute for embedded mode.
- Documentation must state the per-task aggregate wire limit beside per-command limits and retain any still-unqualified SDK limitation until its exact published proof. General owns cross-mode acceptance and closure; documentation alone does not close the defect.
The original reproduction and acceptance below remain the contract. Preserve atomic completion ordering, typed limit/size diagnostics and zero partial admission. Source, image, candidate-package and registry-installed outcomes remain distinct.
Problem
A fan-out that stays within every documented limit can block its run permanently. The limits allow up to 1,000 operations in one all() and 2 MiB per argument. But a workflow task's commands are sent in one completion request, and the Server rejects any request body over 2 MiB.
Reproduced on published Server 2.9.9 with Python SDK 2.6.1:
- A workflow that schedules 50 activities with 10 KB arguments in one parallel group completed.
- One that schedules 300 such activities (about 3 MB in total) got
413 payload_too_largeon workflow-task completion. - The worker recorded "workflow task completion failed after commands were produced". The run became
workflow_replay_blockedwith a failed task, no retry, no activities and onlyStartAcceptedandWorkflowStartedin history.
Repair re-runs the same code into the same limit, so the run can't progress without a code change. The diagnosis says "replay blocked" rather than naming the size limit that was hit.
Acceptance criteria
- A workflow task whose commands are each within the documented limits completes, in the PHP, Python and Rust SDKs and embedded mode. For example, large arguments are offloaded through the runtime payload transport, or commands are split across requests.
- Anything that still can't be accepted fails with a typed structural-limit failure that names the limit and the measured size. It is not recorded as a replay block.
- The structural limits page states any per-task aggregate limit beside
command_batch_sizeandpayload_size_bytes. - Tests against a published Server cover a 300 × 10 KB fan-out and the over-limit case in each SDK.
Activity
rmcdaniel commentedon Oct 21, 2026
Accepted as a cross-repository product defect. The published 300 × 10 KB reproduction and permanent replay block are the baseline; the documented per-command limits must compose into a task that can actually be delivered.
The next implementation step is to trace the aggregate command serialization and runtime external-payload path in all three SDKs and the Server, then add a failing whole-task acceptance control. Preserve one atomic command batch and its deterministic ordering: splitting requests cannot introduce partial command acceptance or replay differences. An unsupported aggregate must produce a typed size-limit outcome with measured size, rather than a determinism/replay-block diagnosis. This is separate from oversized failure diagnostics in #225, though transport-sizing code may be shared after review.
Keep the 300 × 10 KB and actual over-limit published-artifact controls, embedded coverage and explicit aggregate-limit documentation in acceptance. Documentation alone does not close this issue. Current P1 activity-lease delivery remains ahead of this P2; no implementation or released fix is claimed here.
rmcdaniel commentedon Oct 22, 2026
Scope note: the 2 MiB request cap also undercuts the documented per-payload limit for a single value, and for client requests as well as worker completions.
DW_MAX_PAYLOAD_BYTESthe maximum for one payload, while structural limits calls it the total request body.Source-verified, not reproduced. The acceptance should state which size the limit measures (encoded or raw Avro bytes) and keep the request cap from rejecting a value that the documented per-payload limit allows.
rmcdaniel commentedon Nov 4, 2026
General open-item pass, November 4. Owner: Server for request/command boundary; Workflow and SDKs for producer behavior; General for shared size contract.
Next action: Define encoded-envelope versus per-value limits and a bounded completion strategy with countercontrols for valid large fan-outs, avoiding silent drops or endless413 retries.
Action taken in this pass: Asked Server and Workflow for exact existing issue/source ownership and the narrow contract decision; documented1000-operation/per-value limits cannot be dismissed by an unrelated request cap.
General retains the cross-repository follow-through. Existing operator stops and exact source/release/production gates remain binding; the item stays open until its actual acceptance is evidenced.
rmcdaniel commentedon Nov 4, 2026
Workflow maps this to existing #865 (per-site payload/pending guards) and #930 Phase B (whole-transition events/bytes/rows/payload staging). Both remain active; neither is an excuse for the published valid-300x10KB failure. Current bridge pending guards from #933 and start-input guarding already exist and must not be reimplemented from the old report.
Named next action: Server returns a raw Avro value versus base64/JSON envelope/request measurement table and a typed over-limit admission outcome; Workflow audits every normalized field/externalization site and transaction-local staging against it. Keep one atomic ordered completion, zero partial commands/puts on refusal, original deadlines and no endless413/replay-block loop. General owns any effective aggregate cap/capability change; SDKs must not split accepted semantics into independent partial requests. No new published cohort is started from this mapping, and #225 oversized diagnostics remains separate.
rmcdaniel commentedon Nov 11, 2026
Workflow: in progress. workflow#865: service-mode argument/result size guards merged (#1083, ships in 2.23.1). Next: the remaining payload sites (side-effect, local-activity and update results, search attributes), then the fan-out audit against Server's size table. workflow#930 Phase B is P3 hardening.
rmcdaniel commentedon Nov 11, 2026
Server: remaining, tracked in durable-workflow/server#1136 (native caps the whole completion body). Next: per-command limits with a typed structural_limit_exceeded. Owner: server.
5 remaining items
Cap the Server's message on the typed completion error
rmcdaniel commentedon Nov 13, 2026
Installed acceptance on 2026-11-13, 09:08–09:15 UTC. Owner: sdk-python. Published artifacts only: PyPI
durable-workflow==2.17.0(installed outside the source checkout; release commit29f69bfb74b03053c70d7e769196ded0c8668cbc) and native Server3.8.0, Docker Hub indexsha256:7988a23525d9e50e997a9f6f02e801300ed4f626de3cf6977033657ae7e9f58e. Disposable SQLite runtime, amd64, 2 CPUs / 2 GiB. No source overlay or production credentials. Publication workflow: https://github.com/durable-workflow/sdk-python/actions/runs/43398192253 .Results:
UpdateStillPending; a replacement worker completes it withNone; the later read returnsNoneand a completed receipt. Exactly oneUpdateAcceptedis recorded. Reads do not resubmit the update.[300, 3000000].httpx.ReadError, so it never receives the typed 413. The worker retries the completion and the run remains pending/repaired rather than failing structurally. Server confirms its Content-Length middleware rejects before reading this body. Server owns the response-delivery correction; Python will rerun installed acceptance after publication. This is not a complete Large fan-outs within documented limits block their run with a 413 #228 pass.Minimal transport reproduction against that published Server (the token below is synthetic and local):
Observed:
httpx.ReadError('')in 0.11 seconds instead of HTTP 413. The middleware should reject before task lookup, so the synthetic task identity suffices. SDK mock controls pass (69 installed-package update/size tests), but those did not exercise this real HTTP transport failure. The first local fan-out attempt used the sequential example helper and exhausted its harness budget; the qualifying 300 × 10 KB result used the normal concurrent Worker.rmcdaniel commentedon Nov 13, 2026
Rust preparatory transport control, 2026-11-13: exact pre-publication SDK 4.15.0 package bytes (Cargo 1.86.0, source 01d72911078276f7b00cd5efbd145f1c0a5f3df3, SHA-256 4d6504e24845a37afaf325ae576570c9446a261430ecfc9ec795db46c8c1b328), against published native Server 3.8.0 index sha256:7988a23525d9e50e997a9f6f02e801300ed4f626de3cf6977033657ae7e9f58e, amd64. A direct Client::complete_workflow_task with 300 opaque 120KB entries produced a roughly 36MB completion body. Result: PRODUCT FAIL for the transport control, Error::Transport while sending the request; no typed HTTP 413 reaches the SDK. The synthetic task is intentionally nonexistent because aggregate middleware refusal precedes task lookup. This corroborates Python transport evidence, not full fan-out conformance. Runtime container cleanup passed. A first preparatory attempt was runner-blocked by offline Cargo configuration and was corrected before this product result.
The Rust mock controls and ordinary installed-native lifecycle/deadline acceptance remain passing, but they do not close this over-limit requirement. SDK is not yet published, so this is not published-SDK acceptance. Next action: Server owns response-delivery correction and its published tuple; sdk-rust owns rerunning actual installed fan-out/over-limit controls on that tuple and keeping release claims conditional. General and Server were asked in chat.
rmcdaniel commentedon Nov 13, 2026
sdk-php owns the PHP repeat of the published transport control now: installed SDK 3.17.0 and native Server 3.8.0 index sha256:7988a23525d9e50e997a9f6f02e801300ed4f626de3cf6977033657ae7e9f58e, amd64. One isolated SQLite runtime and one bounded PHP runner, synthetic completion task as in Python/Rust. This distinguishes actual typed-413 delivery from mock coverage; it is not full fan-out conformance. Results and exact toolchain follow here; server#1136 remains the response-delivery owner.
rmcdaniel commentedon Nov 13, 2026
PHP published-artifact result, 2026-11-13 approximately 09:41–09:48 UTC. Owner sdk-php. Tuple: Packagist SDK 3.17.0, source/dist reference
daa842c277059471ff246803a8272165b4097c52; native Server 3.8.0, image indexsha256:7988a23525d9e50e997a9f6f02e801300ed4f626de3cf6977033657ae7e9f58e; official PHP 8.3.36 imagephp@sha256:628102249d93494233b54490b785f12db9cd60f4dc89416dfca15973f2125f10, amd64. SDK loaded only from a separate installed consumer, with no source overlay. Disposable SQLite runtime and bounded PHP runner; all containers/volumes removed, diagnostics retained at most 24 hours.Client::completeWorkflowTask()with the same synthetic opaque commands used in Python/Rust sends 36,005,171 bytes and receives typedWorkflowTaskCompletionTooLarge, HTTP 413,payload_too_large, limit 33,554,432 bytes, in 0.115 s. A 3,005,171-byte control reaches ordinary HTTP 422 command validation. This proves PHP receives the actual refusal; it does not prove complete fan-out behavior or the worker’s follow-up command.deferActivity()members are refused locally byRuntimePayloadUploadswithExternalPayloadException: Namespace runtime external payload storage is not available.Default native discovery advertiseslimits.max_payload_bytes = 2097152, external storagestatus: unconfigured, and no workflow-completion aggregate limit. The PHP planner applies that ordinary 2 MiB request limit to completion batches and demands offload even though native accepts a 32 MiB completion. The worker exits before scheduling the activities. Adding the documented synthetic server key did not change the unconfigured storage status; that correction did not produce a pass. The larger valid Worker case was not reached.The PHP slice remains incomplete. Next action: sdk-php owns a scoped completion-planning correction and regression coverage; Server owns an additive discovery field for the actual completion aggregate limit (proposed
limits.max_workflow_task_completion_bytes) alongside its response-delivery correction in server#1136. Server/General are being asked to confirm that field and the unavailable-storage fallback before implementation. Then PHP repeats both installed Worker cases and the one-time structural failure case on the exact published tuple. Native’s Python/Rust early-response defect remains independently valid; PHP’s successful direct transport control does not close it.rmcdaniel commentedon Nov 13, 2026
Published feature acceptance classification: PRODUCT-FAIL, owned by Rust SDK #254.
The registry-only 4.15.0 consumer against published native Server 3.8.0 (index
sha256:7988a23525d9e50e997a9f6f02e801300ed4f626de3cf6977033657ae7e9f58e) passes typed pending-update readback followed by completed JSON null, with exactly one UpdateAccepted event. Ordinary installed lifecycle/deadline checks also pass.The 300 × 10 KB inline activity fan-out fails before completion submission: the worker returns
external_payload_unavailable: namespace runtime storage is not available. The Rust planner uses ordinarylimits.max_payload_bytes(2 MiB) as the entire completion request limit, forcing individually valid values into external storage. This is a confirmed SDK product defect, separate from Server #1136's early HTTP 413 response-delivery defect. Neither failed cell is passing acceptance.Next action, owner sdk-rust: implement #254 using the explicit optional
limits.max_workflow_task_completion_bytesdiscovery field agreed with Server, scoped to workflow and activity-continuation completion endpoints. Preserve per-value/ordinary limits and upload authority. Server owns discovery plus transport correction in #1136; repeat the feature cell with exact published SDK and corrected qualified Server artifacts after both fixes. No version or multiplier inference, oversized-batch success, or native timeout-cleanup claim is authorized by the current evidence.rmcdaniel commentedon Nov 13, 2026
PR #255 merged at
3e8b28299528b0d49159632309f13a1ccdec2ad5after Security's exact-head PASS and all required checks. The remote head is deleted and confirmed absent. The implementation and regression fixture are public; raw continuation offload/lease authority remain unchanged.Owner sdk-rust. Release draft #256 prepares 4.16.0 with this fix and revision-2 metrics. Exact package/lifecycle backward-compatibility qualification is running against published native 3.8, which cannot qualify the new negotiated-cap fan-out path. Publication and feature delivery remain held for Server #1203's qualified published producer and the real installed-worker within/over-cap cell. Server owner and Security have the dependency and test contract; sdk-rust owns the SDK package/installed repeat and downstream evidence. This issue stays open.
rmcdaniel commentedon Nov 13, 2026
The release dependency is now the combined corrected native Server 3.9.1 cohort (#1202 + #1203), as confirmed by the Server owner and Security. The tentative 3.9.2 split is superseded. The durable cohort decision retains combined CI, counter-review, final notes/tree and immutable publication gates. This is an unreleased plan, not a version-based capability assumption.
SDK source
afc2b2ff8960ac2e080ffec765c66f59200cd544and candidate package89f6418ca72e1c6e13495281aab131417c5ddcee1946bfc1a22b1e63cc2b11ccremain unchanged. Security has granted exact-head release-source PASS; all current checks are green. Final tag, approval record and publication remain held until Server provides its qualified immutable index/platform/source/version tuple and the candidate passes actual installed within/over-limit Worker acceptance. The consumer must see the explicit discovery field, satisfy per-value/ordinary limits and complete a same-worker follow-up. Neither older Server evidence nor the planned version number substitutes for that gate.Owners: Server drives combined CI/counter-review/publication and sends the exact tuple; sdk-rust runs the real feature repeat and protected package/publication/registry follow-through; Security retains final package review. Existing baseline and metrics candidate PASS evidence stays scoped to published Server 3.8.0.
Release preparation PR #256 is now merged at
154fab4dcf5e503328a42c61932bcaa4b5af6523after exact-source Security PASS and green required checks; its remote head is deleted and confirmed absent. The approved release-source candidate remainsafc2b2ff, with unchanged package bytes. The real completion-limit fixture also compiles as a fresh archive-only consumer; execution remains held for the qualified corrected published Server tuple. No tag, approval record or publication exists.rmcdaniel commentedon Nov 13, 2026
Corrected native 3.9.1 is published and exact-image qualified at source
7d7ad9d6c9aee2e4592d74389ba9efd36e741f44, indexsha256:946c65eb70e8b4b7c4694be8a181c9669d46c3408b80d4e44d96f2030ea3cf51in both registries. Linux/amd64 child issha256:b0f2bf2a37e8b229282362acb26d9ed511596ebdd366ea4e53bd9f16008a356e; linux/arm64 child issha256:2400a252f7877e3f4876ca96486b9c740bfab47e4d5184fdf3657a2d3a045c3a. Protocol 1.20 / control plane 2.Evidence: publication/scans43423285947, corpus43425102353/a1, all four Compose cells43425106728/a1, and Security exact five-receipt PASS. Protected alias promotion43428195557 is running; final GitHub Release/live alias readback is still pending. This is an immutable-image handoff for owner-controlled installed qualification, not a production adoption instruction.
The producer now advertises
limits.max_workflow_task_completion_bytesfrom the same HTTP admission function (default 33,554,432 encoded request-body bytes, both completion routes). Ordinary/per-value budgets and external-reference slot authority remain unchanged. The bounded discard preserves typed 413 delivery within its documented 64 MiB/two-second remainder bound.PHP, Python and Rust owners have the tuple and own actual installed real-Worker within-cap and oversized/follow-up repeats, plus their package/source/release gates. Record exact package/registry identity, valid 300×10 KiB behavior, an individually valid but over-wire-cap batch, no partial scheduled activity writes, one structural failure and continued same-worker operation. Retain malformed/absent/smaller cap and continuation-authority scope as applicable; no result-bound ref substitution into unsupported command slots. Server owns response/discovery diagnosis if any repeat fails. This issue remains open through those published-package results; source controls, transport-only 413 and the image corpus alone do not close it.
rmcdaniel commentedon Nov 13, 2026
Python owner sdk-python is running one installed PyPI 2.17.1 consumer against the newly qualified published native Server 3.9.1, source
7d7ad9d6c9aee2e4592d74389ba9efd36e741f44, indexsha256:946c65eb70e8b4b7c4694be8a181c9669d46c3408b80d4e44d96f2030ea3cf51, linux/amd64 childsha256:b0f2bf2a37e8b229282362acb26d9ed511596ebdd366ea4e53bd9f16008a356e. Server's exact qualification handoff is recorded in server1205 / comment6853373077.The selected scope is actual Worker 300×10KB within-limit, an aggregate over-limit request with zero partial activities, and a small follow-up on the same worker. The earlier native3.8 transport nonpass remains intact. This is one bounded local acceptance with synthetic SQLite state, loopback only and no production credentials or source overlay. Results and exact cleanup follow here; no cross-SDK acceptance or final issue closure is inferred.
rmcdaniel commentedon Nov 13, 2026
Workflow searched this issue's retained evidence and the owning Workflow #865/#930/#809 records for an equivalent published embedded acceptance. No named-published 300 × 10 KB plus aggregate/budget-refusal atomicity receipt was found. The existing published 2.5.27 four-worker receipt covers 64 activities with small typed values and queue recovery. It is useful prior queue evidence, but it does not exercise this issue's aggregate payload or refusal control, so it will not be rerun or counted as equivalent.
Owner: Workflow, after the current 2.29.0 release and timeout-cleanup installed gate. Reuse the ordinary embedded database-queue fan-out fixture with a normal registry installation and no runtime source override. The bounded acceptance will cover 300 individually valid 10 KB arguments, exact completion/effects and original deadlines, then a separately named over-budget control with a typed measured refusal and no partial scheduling/effects, followed by continued ordinary worker operation. Record the exact package/source archive, framework/PHP/backend, configured embedded limits, results and cleanup here.
Embedded admission has no native HTTP completion envelope. Its history-event/byte/row and per-value limits must be measured and identified directly; native's 32 MiB wire cap and SDK controls are not embedded proof. Source-only budget tests do not replace the installed result. General retains cross-mode closure, and existing #1116 retains any already-scoped accounting/legacy-closure design work.
rmcdaniel commentedon Nov 13, 2026
Python published-artifact acceptance: PASS for the selected completion cases
Owner sdk-python, linux/amd64 SQLite cell, November 13. Exact tuple: PyPI durable-workflow 2.17.1, wheel SHA-256
90040cb28906985b227988815b1b53aa3079378673e35c689392ac71edaf7b35; native Server 3.9.1, source7d7ad9d6c9aee2e4592d74389ba9efd36e741f44, indexsha256:946c65eb70e8b4b7c4694be8a181c9669d46c3408b80d4e44d96f2030ea3cf51, amd64 childsha256:b0f2bf2a37e8b229282362acb26d9ed511596ebdd366ea4e53bd9f16008a356e. Pulled the exact index, verified its amd64 selection and image revision, and compared all 46 installed SDK files byte-for-byte with the downloaded registry wheel. Dependencies: httpx 0.28.1 / fastavro 1.13.1. No source overlay.One actual Worker ran all three scenarios over direct native HTTP from 12:58:39 to 13:00:56 UTC:
[300,3000000].reason: payload_too_large,limit_kind: workflow_task_completion_bytes,limit: 33554432. The SDK sent one 477-bytefail_workflowcompletion on the same original task and received 200. Exactly one WorkflowFailed withfailure_category: structural_limit,non_retryable: true, and measured-size/limit guidance. Zero ActivityScheduled, ActivityCompleted or WorkflowTaskFailed; no repair/replay block.[3,30].The first fixture attempt had an insufficient 120-second bound: 300 activities were scheduled and 241 completed before the harness stopped the Worker; a lost-lease failure was recorded at that shutdown. It remains runner-aborted/NONPASS. Only the later run with a 300-second bound qualifies above. No SDK or Server source changed between attempts.
Cleanup verified: owned container absent, both anonymous volumes removed, zero remaining owned volumes, fixture credential file removed and no OOM. No production credentials, vault reads, builds or production changes.
This qualifies Python 2.17.1's selected within/over/follow-up completion behavior on the exact published native 3.9.1 amd64 tuple. The earlier native 3.8 transport nonpass remains historical evidence. Other SDKs, architectures, legacy/request-key cohorts and cross-repository issue closure retain their own gates. Python 2.17.1 needs no new SDK release for this Server correction.
rmcdaniel commentedon Nov 13, 2026
Published 4.16.0 installed acceptance: PASS
Exact published tuple: Rust 4.16.0, registry/archive SHA-256
89f6418ca72e1c6e13495281aab131417c5ddcee1946bfc1a22b1e63cc2b11cc, clean source/tagafc2b2ff8960ac2e080ffec765c66f59200cd544; native Server 3.9.1, source7d7ad9d6c9aee2e4592d74389ba9efd36e741f44, indexsha256:946c65eb70e8b4b7c4694be8a181c9669d46c3408b80d4e44d96f2030ea3cf51, executed Linux amd64 childsha256:b0f2bf2a37e8b229282362acb26d9ed511596ebdd366ea4e53bd9f16008a356e. Public runner fixture is reviewed commitb3480de83b30764b6d4237f5de243a49d9a22f61(#257); package/source bytes remain the approved ones.Fresh registry consumer: exact lock source/checksum verified, no patch, vendor or local Cargo config. Actual tests against the same disposable published Server:
Separate registry-only lifecycle/deadline acceptance also passes. Every run cleaned its owned containers/networks; no leftovers. The prior candidate shutdown NONPASS is preserved and is not substituted for this result.
Publication 43432093783, final Release, and API docs 43432730516 all pass. Fresh API build identity is 4.16.0 / checksum above / source above / tooling
ab8cae5eeb9c2aa701a997a2593e0ecd933a57a4.Scope: the larger allowance requires explicit
limits.max_workflow_task_completion_bytes; older producers retain the conservative ordinary cap. This tuple qualifies the Rust completion/metrics behavior, not other SDKs, every backend, #216 caller-key retries or native timeout-cleanup. Root docs adoption is being driven by its owner. Sample App keeps its already-frozen 4.15 ordinary cohort, which does not claim this large-fanout slice; no redundant tuple run is required for that unchanged scope.rmcdaniel commentedon Nov 13, 2026
PHP owner-installed acceptance is complete on published SDK3.18.1 / native Server3.9.1, registry-only43440828565. Exact SDK source/dist
ffa67454b99e299624d46dc2c5a4f7eceab5b73f; Server indexsha256:946c65eb70e8b4b7c4694be8a181c9669d46c3408b80d4e44d96f2030ea3cf51, source7d7ad9d6c9aee2e4592d74389ba9efd36e741f44; protected stock PHP8.3.36, no source/candidate fallback.The actual Worker completes300×10KB activities from a4,158,899-byte completion without configured storage. A60×450KB completion is36,032,179 bytes and is submitted exactly once: authoritative HTTP413 names workflow_task_completion_bytes, limit33,554,432 and exact observed size. The run closes with structural_limit, zero partial activities and no repeated submission. The same Worker then completes fresh work; upload count0. Ordinary per-value limit remains2,097,152. Retained artifacts include body counts/statuses and bounded diagnostics, no payloads/credentials.
PR411 links source fixes406/408, independent exact-package approval, immutable release/Packagist identity and live stable manual/API proof. This closes the PHP planner/Worker delivery slice. General owns cross-SDK issue closure; continuation slot authority, other transport cohorts and #216 are not inferred from this result.
rmcdaniel commentedon Nov 13, 2026
Root docs adoption is delivered via docs #536, merge
127993281e379985fcb3b20d27ca7e0d97543fea, protected Pages 43447139751 SUCCESS. All 16 changed public pages across eight locales, exact manifest and unchanged installers passed live readback. Stable selection now uses PHP SDK 3.18.1; manifest SHA2560a8878f4dc1cd92af315d5c41887da1beddd3d20e8efd53b01a7ab1e46a88c36.The PHP guide explains typed/raw defaults, pending versus completed null, capability refusal and stable-ID recovery when the original key is unknown, linking the actual exact-tag SDK guide. The shared completion reference names only the qualified PHP 3.18.1/native 3.9.1 PHP8.3.36/linux-amd64/SQLite Worker receipt. Broader #216/native timeout and cross-product closure remain separate. This completes the root-docs downstream slice; SDK/General retain their actual upstream acceptance and closure decisions.