You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
docs: CLAUDE.md drift — internal/ui status, lipgloss in go.mod, phase table points at closed #17/#18 #106
Dependencies section — says huh, bubbletea, lipgloss are "planned but not yet in go.mod". lipgloss v1.1.0 is in go.mod now; only huh and bubbletea remain planned.
SPEC.md §T is behind the merged work — e.g. T3 (wire AcquireLock) is still marked todo though it landed via PR #79, and T18 (internal/ui) is partially done. Update statuses via the spec workflow rather than leaving §T stale.
Activity
docs: refresh CLAUDE.md + SPEC §T after fix-wave (#116)