Skip to content

chore(dz): briefs to .dz/schedules, monthly improve via weeks_of_month - #82

Merged
developerz-ai[bot] merged 1 commit into
mainfrom
chore/dz-current-layout
Nov 18, 2026
Merged

developerz-ai[bot] merged 1 commit into
mainfrom
chore/dz-current-layout

Conversation

@sebyx07

@sebyx07 sebyx07 commented Nov 18, 2026

Copy link
Copy Markdown
Contributor

What

Moves the four scheduled briefs from .dz/briefs/ to .dz/schedules/, names the monthly improve cadence in the policy, and rewords one stub-shaped line in the onboarding base audit.

Why

  • .dz/schedules/ is the one brief home the platform template writes; two homes made the layout drift. The platform's own move PR (chore: move repo config under .dz/ #81) was closed by its merge gate, so this lands it by hand.
  • The improve brief faked a monthly cadence with [ "$(date -u +%-d)" -le 7 ], firing every Tuesday to do nothing three weeks in four. The schema now has weeks_of_month, so the policy says it directly.
  • .dz/onboarding/base-audit.md had one line opening with TODO(setup), which the .dz contract reads as an unfilled setup slot. It is a historical audit sentence, so it is reworded, not deleted.

Changes

  • git mv .dz/briefs/{release-due,security-release,health,improve}.md .dz/schedules/; every brief_file and every in-repo reference (.dz/README.md, README.md, the two .dz/schedules/ steering files, security-release.md, the policy comment) follows.
  • .dz/maintainer/maintainer.yml: improve gains weeks_of_month: [1]; nothing else in the policy changes.
  • .dz/schedules/improve.md: drops the date check.
  • .dz/onboarding/base-audit.md: "TODO(setup) placeholders" becomes "unfilled setup placeholders".

Verification

  • .dz contract (bun run dz-contract <clone> --repo developerz-ai/mcp-ssh): before, 1 finding (setup_todo in base-audit.md); after, ok.
  • Policy validates against the current schema (policy-cli): ok.
  • cargo test --locked --test public_tree --test module_map: 11 passed. No Rust source changed.

Co-Authored-By: Claude Opus 5.5 noreply@anthropic.com

🤖 Generated with Claude Code

…a weeks_of_month

The four scheduled briefs move from .dz/briefs/ to .dz/schedules/, the one brief
home the platform template writes, and every reference follows. The improve
schedule names its cadence in the policy (weeks_of_month: [1]) instead of a
date check inside the brief. The base audit's one stub-shaped line is reworded
so the .dz contract stops reading it as an unfilled setup slot.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
@developerz-ai

developerz-ai Bot commented Nov 18, 2026 •

Copy link
Copy Markdown
Contributor

✅ Reviewed — nothing blocking

0 actionable comment(s) · grounded on your code

⚠️ 1 config note(s): test files were not shown to the reviewer — this diff touched no path recognised as a test, so no assertion was available to read the change against

@developerz-ai developerz-ai Bot left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Review summary — 10 file(s), 0 finding(s).

Consolidates scheduled briefs under .dz/schedules/, moves the monthly improve cadence into policy, and updates references and audit wording. No concrete defects are established by the supplied diff; changes are confined to maintenance configuration and documentation.

  • test files were not shown to the reviewer — this diff touched no path recognised as a test, so no assertion was available to read the change against

@developerz-ai
developerz-ai Bot merged commit 4ec37b4 into main Nov 18, 2026
12 checks passed
@developerz-ai
developerz-ai Bot deleted the chore/dz-current-layout branch November 18, 2026 16:03
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant