ops: daily orchestrator summary 2026-07-28-run4 - #2157
Merged
Conversation
Merged #2155 (harness: close #2148's three FLAG residuals) — both QC gates APPROVED q5/q5, zero rework iterations. Overrode Step 0.5's saturated-queue fast-exit: all four conditions passed, but Condition 1 passes vacuously on an empty queue. Filed as A-FASTEXIT-VACUOUS. Also filed: A-FINISH-PROTOCOL-BACKGROUND (4/4 agents strand work on backgrounded builds; removing the long task works where stronger prompting does not), H-CHECK-RUNTARGET-PATHQUAL, H-WRITE-AUDIT-SHEBANG-MISMATCH.
…after drafting)
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Automated daily orchestrator run 4 for 2026-07-28 (GHA run 30405186411).
See
dev/daily/2026-07-28-run4.mdfor the full summary.Merged this run: #2155 — closes the three FLAG residuals qc-behavioral raised
on #2148. Both QC gates APPROVED (q5 / q5), zero rework iterations.
The item most worth reading: Step 0.5's saturated-queue fast-exit passed all
four conditions and I overrode it. Condition 1 is a
FOR each track with N > 0 open PRsloop, so with zero open PRs it passes vacuously — and zero openPRs is maximum dispatch capacity, the opposite of the saturation the check exists
to detect. The perverse consequence: the cleaner a run finishes, the more likely
its successor is told to do nothing. Filed as
A-FASTEXIT-VACUOUSwith three fixoptions; the smallest is one line.
Also filed:
A-FINISH-PROTOCOL-BACKGROUND— 4 of 4 agents across runs 3-4ended their turn on a backgrounded build despite escalating warnings. The one
agent that did not was the one whose brief removed the long build from its
critical path. Removing the temptation works where forbidding it does not.
Plus
H-CHECK-RUNTARGET-PATHQUALandH-WRITE-AUDIT-SHEBANG-MISMATCH.Main was green throughout — verified on the starting HEAD
6f89d1b0and again onthe merged tip
14e14b24.