ops: daily orchestrator summary 2026-07-28-run4 - #2157

Merged
dayfine merged 3 commits into
mainfrom
ops/daily-2026-07-28-run4
Jul 29, 2026
Merged

ops: daily orchestrator summary 2026-07-28-run4#2157
dayfine merged 3 commits into
mainfrom
ops/daily-2026-07-28-run4

Conversation

@dayfine

@dayfine dayfine commented Jul 28, 2026

Copy link
Copy Markdown
Owner

Automated daily orchestrator run 4 for 2026-07-28 (GHA run 30405186411).
See dev/daily/2026-07-28-run4.md for the full summary.

Merged this run: #2155 — closes the three FLAG residuals qc-behavioral raised
on #2148. Both QC gates APPROVED (q5 / q5), zero rework iterations.

The item most worth reading: Step 0.5's saturated-queue fast-exit passed all
four conditions and I overrode it. Condition 1 is a FOR each track with N > 0 open PRs loop, so with zero open PRs it passes vacuously — and zero open
PRs is maximum dispatch capacity, the opposite of the saturation the check exists
to detect. The perverse consequence: the cleaner a run finishes, the more likely
its successor is told to do nothing. Filed as A-FASTEXIT-VACUOUS with three fix
options; the smallest is one line.

Also filed: A-FINISH-PROTOCOL-BACKGROUND — 4 of 4 agents across runs 3-4
ended their turn on a backgrounded build despite escalating warnings. The one
agent that did not was the one whose brief removed the long build from its
critical path
. Removing the temptation works where forbidding it does not.

Plus H-CHECK-RUNTARGET-PATHQUAL and H-WRITE-AUDIT-SHEBANG-MISMATCH.

Main was green throughout — verified on the starting HEAD 6f89d1b0 and again on
the merged tip 14e14b24.

web-flow and others added 3 commits July 28, 2026 23:51
Merged #2155 (harness: close #2148's three FLAG residuals) — both QC gates
APPROVED q5/q5, zero rework iterations.

Overrode Step 0.5's saturated-queue fast-exit: all four conditions passed, but
Condition 1 passes vacuously on an empty queue. Filed as A-FASTEXIT-VACUOUS.

Also filed: A-FINISH-PROTOCOL-BACKGROUND (4/4 agents strand work on backgrounded
builds; removing the long task works where stronger prompting does not),
H-CHECK-RUNTARGET-PATHQUAL, H-WRITE-AUDIT-SHEBANG-MISMATCH.
@dayfine
dayfine merged commit cb248e2 into main Jul 29, 2026
2 checks passed
@dayfine
dayfine deleted the ops/daily-2026-07-28-run4 branch July 30, 2026 01:33
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants