Owner

Automated daily orchestrator run 3 for 2026-07-28 (GHA run 30393663268). Full summary: dev/daily/2026-07-28-run3.md.

Three PRs merged this run: #2149 (f44e5bb2), #2152 (14270b57), #2148 (751de67d).

The finding worth reading: run 2 (30380136239) is the first orchestrator run observed with conclusion: failure, and nothing surfaced it. Its Step 9 bundling step hit fatal: 'ops/daily-2026-07-28-run2' is already checked out at '/tmp/ops-run2' (exit 128) — because run 2's own Step 8 worktree was still holding the branch. Critically, the step's git checkout had already removed the generated budget record before the fatal, so run 2's $36.82 reached neither its PR nor the ops/budget-* orphan fallback: it was destroyed, not stranded. Reconstructed here from the job log. Step 10 (Fail on escalations) is skipped when step 9 fails, so the escalation gate never ran either.

This is systemic rather than a slip: Step 4's GHA guidance (git checkout -b in the shared tree) is wrong, so every recent run overrides it with git worktree add — while the bundling step was written against the checkout-based assumption it replaced. Filed as A-WORKTREE-BLOCKS-BUNDLE in dev/status/orchestrator-automation.md with three fix options. Interim mitigation applied by this run: no worktree left on the summary branch.

Contents: the run-3 summary, two audit records, two dev/reviews/* combined results (written by the orchestrator, not the QC agents, per the PR-D'c migration), the fast health report, the reconstructed budget record, and the Step 5.5 index reconcile.

🤖 Generated by the GHA orchestrator.

web-flow and others added 2 commits July 28, 2026 21:32
Run 3 of 2026-07-28 (GHA run 30393663268). Three PRs merged:

- #2149 (f44e5bb) - run 2's stranded summary PR, carrying the 31 orphaned
  budget records / $283.31 it had recovered. Run 2's workflow FAILED before
  merging it, so without this the backfill would have been re-lost.
- #2152 (14270b5) - cholesky SPD docstring. The review disproved the
  originating finding's own numbers (dominance breaks at n=32 not n=100;
  lambda_min 1.83 not 1.69) and traced 1.69 to a Toeplitz lower bound
  reported as if it were the eigenvalue.
- #2148 (751de67) - H-CHECK-CACHE-BLIND closed. 23 of 25 check scripts
  could be silently cache-skipped by a warm _build, including
  status_file_integrity.sh and no_python_check.sh; now 0 among
  currently-wired top-level rules.

New defect diagnosed and filed: A-WORKTREE-BLOCKS-BUNDLE. Run 2
(30380136239) is the first orchestrator run observed with
conclusion: failure. Its Step 9 bundling step hit 'fatal: ... is already
checked out at /tmp/ops-run2' (exit 128) AFTER its git checkout had already
removed the generated budget record, so the $36.82 cost record reached
neither the PR nor the ops/budget-* orphan fallback - it was destroyed.
Reconstructed here from the job log. Step 10 (Fail on escalations) was
skipped as a consequence, so the escalation gate never ran.

Also: dev/reviews/{cleanup,harness}.md combined results + Reviewed SHA lines
(written by the orchestrator, not the QC agents, per PR-D'c migration),
two audit records, the fast health report, and the Step 5.5 index reconcile.
@dayfine
dayfine merged commit 6f89d1b into main Jul 28, 2026
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants