Plan projects that run for weeks on a Gantt timeline, and keep each project's drawings, quotes and site photos in one place.
An open-source app template provided by Clawnify.com.
Conceptual UI illustrations of the app's main capabilities, with fictional example data. Open an image to see the details.
| Drag to replan | Double bookings, flagged |
|---|---|
![]() |
![]() |
| Who does each phase | Every file in its project |
![]() |
![]() |
- A timeline of every project. Each project is a plan of phases, each with a start, an end and who does it. They show as bars by day, week or month, with today's line and weekends shaded.
- Change the plan by dragging. Drag a bar to move a phase, drag its edge to change its length, drag a project's bar to move its whole plan. Arrow keys do the same for keyboard users.
- Double bookings are flagged, not blocked. When the same person, crew or subcontractor is on two phases on the same days, in any open project, both bars are marked and the timeline says how many. The plan may still be right; the person deciding knows.
- One place for a project's files. Drop drawings, the quote, permits and site photos on the project. Photos and PDFs open in place; anything else downloads.
- Your agent can plan for you. The API describes itself, so an agent can draft a project with its whole plan from a sentence, report what runs this week, or push a project back two weeks in one call.
A project has no dates of its own: it runs from its first phase to its last, so the plan and the project can never disagree.
| Part | What |
|---|---|
| Interface | React, Tailwind, shadcn/ui |
| API | Hono, OpenAPI described |
| Database | SQLite |
| Files | Object storage |
pnpm install
pnpm dev # creates the local database, then serves the app and the APIOpen the address vite prints. The dev server stands in for the platform and
puts every request in one local workspace.
pnpm test # date arithmetic: weeks, ISO week numbers, inclusive spans
pnpm typecheckMIT