Milestones
List view
The last two gates. Both need a harness first and neither blocks another phase. Epic #79.
No due date•0/3 issues closedThe BE rows are Partial on source coverage, not design. Consumes the output of Phases 2-4. Epic #78.
No due date•1/4 issues closedTurn measurable into passing: hole inference, the missing class checks, deriving diagnostics, fundep coverage, and the M3 kind gate. Epic #77.
No due date•0/6 issues closed230 of 377 unresolved passing files are blocked on nothing but a missing library module. Depends on Phase 2, because the library is a client of the forms Phase 2 lands. Epic #76.
No due date•0/5 issues closedThe largest corpus blocker: 134 passing files stop in surface lowering before resolution, kinds or types run. Epic #75.
No due date•8/8 issues closedOfficial errorCode mapping, a lenient type-check entry point, L4/L5 scoreboards, the harness module path, and a runtime scoreboard. Until this lands, L4, L5, L6/M7 and M8-W report nothing. Epic #74.
No due date•5/5 issues closedClose the three remaining L1 files and the two lexer divergences. Self-contained; closes the L0/L1 gate. Epic #80.
No due date•1/1 issues closed