Repository navigation
Tick the weekly hand-off; note ADR 0055's change to ADR 0045 - #132
Conversation
Follow-ups from the review of #129: the Monday task now exists, the decision-log line names the agent's change to ADR 0045 decision 4, ADR 0045 points to ADR 0055, and the hand-off steps set umask 077 so every file is private. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_017BpEZ7pADxYXWW2RSSarAJ
Claude review: passedThis pull request only changes documents. It ticks the weekly hand-off item on the roadmap, makes the decision log and ADR 0045's status say what ADR 0055 already says about ending the temporary merge rule and asking the owner before the catch-up review, and adds a step that keeps the weekly working files private to the session. No code, tests, checks, or spending limits change, and the description matches what the diff does. Optional
|
Overseer: no problems foundFrom the check on this pull request. This pull request marks the weekly issue hand-off as done, since the Monday scheduled task was created on 2026-11-16 and first runs on 2026-11-23. It also notes in the decision log and in ADR 0045 that ADR 0055 changed ADR 0045's catch-up review so it waits for the owner's yes, which matches what ADR 0055 already says. It adds one safety step to the weekly instructions so every private file is readable only by the session. It changes only documents and touches no test, no owner-only path, and no secret. Notes
A blocking finding counts like a blocking review comment: fix it, or explain on this pull request why not, and the owner settles it (ADR 0019). |
What changed
docs/weekly-issue.md: the steps start withumask 077, so the log and pages are private too, not only the key and the export. This was an optional note from the review of ADR 0055: first issue without the remaining facts; weekly hand-off steps #129.How it was tested
Risks
Needed from the owner
Checkpoint
Generated by Claude Code