chore(ci): raise backend coverage job timeout - #1497
Merged
Merged
Conversation
Backend coverage runs take 12-14 min (internal/services ~9.5m under -race), leaving no headroom under the 15m job cap and Go's 10m per-package default. Raise the job caps and add a configurable CHARON_TEST_TIMEOUT (default 30m) to go-test-coverage.sh. Claude Code assisted.
Contributor
|
You are seeing this message because GitHub Code Scanning has recently been set up for this repository, or this pull request contains the workflow file for the Code Scanning tool. What Enabling Code Scanning Means:
For more information about GitHub Code Scanning, check out the documentation. |
Codecov Report✅ All modified and coverable lines are covered by tests. 📢 Thoughts on this report? Let us know! |
Contributor
✅ Supply Chain Verification Results✅ PASSED 📦 SBOM Summary
🔍 Vulnerability Scan
📎 Artifacts
Generated by Supply Chain Verification workflow • View Details |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Backend coverage job runs take 12-14 min (internal/services ~9.5m, handlers ~7m under -race), so the 15m job cap leaves almost no headroom (run 37414531459 finished all steps then hit the cap at 15m02s) and Go's default 10m per-package timeout is close to being hit.
-timeoutto both gotestsum and go test branches, configurable viaCHARON_TEST_TIMEOUT(default 30m); documented in the skill file.Claude Code was used to help produce this change.