Tracks Phase 7 of the effects program (plan: workspace docs/effects-roadmap.md, Phase 7). The CHANGELOG, the release at the version Brad names, its verification, the portal's wasm refresh decided with the byte cost measured, the fleet charters and the accuracy vision's pointer checked, every issue this program filed closed or carrying a trigger.
Closes when every Gate condition is met and recorded (EFFECTS PHASE 7 MET, packet docs/effects-gate7-packet.md, outcome posted here). Not started.
Tracks Phase 7 of the effects program (plan: workspace
docs/effects-roadmap.md, Phase 7). The CHANGELOG, the release at the version Brad names, its verification, the portal's wasm refresh decided with the byte cost measured, the fleet charters and the accuracy vision's pointer checked, every issue this program filed closed or carrying a trigger.Closes when every Gate condition is met and recorded (
EFFECTS PHASE 7 MET, packetdocs/effects-gate7-packet.md, outcome posted here). Not started.