Skip to content

reset valve setting when valve status changes to be a fixed status (OPEN/CLOSED) by controls#66

Open
WaterDesk wants to merge 1 commit into
OpenWaterAnalytics:developfrom
WaterDesk:xuxi/fix-control-setting
Open

reset valve setting when valve status changes to be a fixed status (OPEN/CLOSED) by controls#66
WaterDesk wants to merge 1 commit into
OpenWaterAnalytics:developfrom
WaterDesk:xuxi/fix-control-setting

reset valve setting when status is fixed with control changes

9585dc8
Select commit
Loading
Failed to load commit list.

Workflow runs completed with no jobs