add option to target net system electricity export import add estimated solar multiple based on solar field layout replace solar field re design warning message replace turbine with target on system control labels
…nrel/SAM into csp-controller-target-net-power
|
This also comments out CSP hybrids from the startup file that @mjprilliman added in the hybrid branch |
|
@cpaulgilman What do you think about adding an option in the MSPT UI for this "beta" feature as shown above? |
taylorbrown75
left a comment
There was a problem hiding this comment.
Branch builds on my machine and successfully targets the net power output in the default case.
@tyneises That approach looks good to me. It clearly communicates that the plant control target to net electrical output is in Beta, and the simulation output is what I expect based on the UI text description. The System Design help topic will need to be updated. |
mjprilliman
left a comment
There was a problem hiding this comment.
Hybrids seems to work correctly.
Add features corresponding to ssc pull request: NatLabRockies/ssc#1396
Also adds estimate of actual solar multiple to target solar multiple reports difference on System Design page.