Bidirectional, soft-switched, 200 V → 1600 V at 50 kHz: a switching-level DAB model checked against theory over hundreds of simulations.
A switching-level Simulink / Simscape model of a single-phase Dual Active Bridge (DAB) isolated DC-DC converter with the ratings of the classic 50 kW prototype by Kheraluwala et al. (IEEE Trans. Ind. Appl., 1992). Fully scripted MATLAB sweeps validate the converter's steady-state waveforms, phase-shift power-transfer characteristic, zero-voltage-switching (ZVS) region, the effects of snubber capacitance and magnetizing inductance, and bidirectional power flow.
| Result | Value |
|---|---|
| Rated point (d = 1, φ = 45°) | 49.1 kW simulated vs. 50.0 kW theory (−1.8 %), 98.2 % efficiency |
| Reverse power (φ = −45°) | −50.4 kW, with only the sign of the phase shift changed |
| Power-vs-phase sweep | 65 simulations, 5 voltage ratios; ≤ 8.2 % deviation (only at hard-switched light load) |
| ZVS map | 120 operating points; boundaries match the analytical limits |
| Snubber study | 10 → 100 nF raises the minimum ZVS phase shift from 6° to 26° |
| Magnetizing-inductance study | Lm 1 H → 10 µH lowers the primary ZVS limit at d = 1.3 from 23° to 13° |
| Parameter | Value |
|---|---|
| Input / output voltage V1 / V2 | 200 V / 1600 V |
| Turns ratio n | 8 (so d = V2 / (n·V1) = 1 at rated voltages) |
| Switching frequency fs | 50 kHz |
| Rated power | 50 kW (66.7 kW maximum at φ = 90°) |
| Leakage inductance L (primary-referred) | 1.5 µH, sized for rated power at φ = 45° |
| Winding resistance Rac | 5 mΩ |
| Switch / diode on-resistance | 1 mΩ |
| Dead time | 0.2 µs (40 ns for sweeps) |
| Solver sample time | 20 ns (1000 samples per period) |
Each bridge outputs a 50 %-duty square wave; the secondary is delayed by phase shift φ, and the leakage inductance carries the difference.
d = V2 / (n·V1)
P = V1·(V2/n)·φ·(π − |φ|) / (2π²·fs·L)
i(0) = −I_base·[1 − d + 2dφ/π] i(φ) = I_base·[2φ/π − (1 − d)] I_base = V1 / (4·fs·L)
ZVS requires i(0) < 0 (primary) and i(φ) > 0 (secondary):
- primary loses ZVS when φ < 90°·(1 − 1/d) (only for d > 1)
- secondary loses ZVS when φ < 90°·(1 − d) (only for d < 1)
- at d = 1, both bridges soft-switch at every load
Built entirely from Simscape Foundation Library blocks (ideal switches, anti-parallel diodes, RC snubbers, ideal transformer), generated programmatically by build_dab_model.m. Gate signals come from four sample-based pulse generators with built-in dead time; the secondary pair is delayed by the phase shift.
| Top level | Primary bridge subsystem |
|---|---|
![]() |
![]() |
| d = 0.7, φ = 45° (sawtooth current) | d = 1.3, φ = 10° (primary hard-switched) | Reverse power, φ = −45° |
|---|---|---|
![]() |
![]() |
![]() |
| Operating point | P theory (kW) | P sim (kW) | i(0) theory / sim (A) | i(φ) theory / sim (A) | ZVS pri / sec |
|---|---|---|---|---|---|
| d = 1.0, φ = 45° | 50.0 | 49.1 | −333 / −322 | +333 / +339 | yes / yes |
| d = 0.7, φ = 45° | 35.0 | 34.9 | −433 / −425 | +133 / +140 | yes / yes |
| d = 1.3, φ = 10° | 18.2 | 11.5 | +104 / +132 | +274 / +248 | no / yes |
| Power vs. phase shift (markers = simulation, lines = theory) | ZVS map (green = both bridges soft-switched) |
|---|---|
![]() |
![]() |
| Snubber capacitance narrows ZVS | Magnetizing current widens primary ZVS |
|---|---|
![]() |
![]() |
- Dead time shifts the effective phase. When a bridge hard-switches, its voltage edge moves from the start to the end of the dead time. That changes the effective φ by 3.6°, which explains the 37 % power shortfall at d = 1.3, φ = 10° (theory with φ = 6.4° predicts 35 %).
- A second ZVS limit set by dead time. After the bridge voltage swings, the inductor current keeps rising. If it crosses zero before the incoming switch is gated on, the voltage swings back and the switch turns on hard (≈ 7° minimum φ at d = 1 with 0.2 µs dead time).
- Magnetizing-inductance placement matters. Lm only widens the primary ZVS range when it sits across the primary bridge terminals; placed beyond the leakage inductance, its current is supplied by the secondary bridge and has no effect.
- Efficiency gap vs. hardware (98.2 % simulated vs. 87.2 % on the prototype) comes from the idealized switches: no switching loss, tail current, reverse recovery or package inductance.
simulation/
├── run_all.m # one click: build model, run every study, save all figures
├── dab_params.m # all circuit and simulation parameters
├── build_dab_model.m # programmatically builds dab_model.slx (+ self-test)
├── dab_model.slx # generated Simulink / Simscape model
├── dab_theory.m # analytical curves (power, ZVS region, ideal waveforms)
├── dab_run_point.m # simulate one operating point + waveform figure
├── dab_run_single.m # quick single run
├── dab_sweep_power.m # power vs. phase shift sweep (65 runs)
├── dab_sweep_zvs.m # soft-switching map (120 runs)
├── dab_extra_studies.m # snubber, magnetizing-inductance, reverse-power studies
└── dab_analyze.m, dab_timing.m, dab_ideal_waveforms.m # helpers
images/ # result figures
Requirements: MATLAB + Simulink + Simscape (Foundation Library; no Specialized Power Systems needed).
cd simulation
run_all % ~30–90 min: builds the model and regenerates every figure as .pngOr run pieces individually:
dab_params; % load parameters
build_dab_model; % (re)build dab_model.slx and self-test
dab_theory; % analytical curves only (instant)
dab_run_point(1.0, 45); % rated point waveforms
dab_run_point(1.3, 10); % light-load hard-switching case
dab_sweep_power; % power-transfer sweep
dab_sweep_zvs; % ZVS map
dab_extra_studies; % snubber / magnetizing / reverse power- Closed-loop output-voltage control
- Realistic transformer and IGBT models (switching loss, reverse recovery, stray inductance)
- Extended modulation schemes (e.g. dual/triple phase shift) to widen ZVS at light load
M. H. Kheraluwala, R. W. Gascoigne, D. M. Divan and E. D. Baumann, "Performance characterization of a high-power dual active bridge DC-to-DC converter," IEEE Transactions on Industry Applications, vol. 28, no. 6, pp. 1294–1301, 1992. doi: 10.1109/28.175280
- Aryan Verma









