Skip to content

Commit 711b5d6

Browse files
rmdevproclaude
andcommitted
Milton Hilton § 06: the one-stop technology shop — hands-on install
Rewrite the Role section to make explicit that we installed the system ourselves, not just designed it. Cameras, network cabling, WiFi, servers, switching, UPSs — all installed by us and our crew. Plumbers did the piping; electricians did the line voltage; we did everything else. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
1 parent f4a24de commit 711b5d6

1 file changed

Lines changed: 2 additions & 2 deletions

File tree

‎case-studies/milton-hilton.html‎

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -277,8 +277,8 @@ <h2>Everything the campus runs on.</h2>
277277
<div class="cs-section">
278278
<div class="lbl">§ 06 · Role</div>
279279
<div>
280-
<h2>Architect, designer, builder.</h2>
281-
<p>We handled every layer of the delivery — from the mechanical and electrical design of the HVAC plant to the racks in the IDF closet to the software running on the control supervisor. One accountable practice for the whole building.</p>
280+
<h2>The one-stop technology shop for the whole campus.</h2>
281+
<p>Every camera, every run of network cabling, every WiFi access point, every server, every switch, every UPS — installed by us and the people working for us. Plumbers handled the piping on the HVAC plant; electricians handled the line-voltage wiring; we handled everything else, from the first mechanical sketch through to the last punched-down cable and the software running on the control supervisor.</p>
282282
<p>Milton Hilton is also the campus for four of our tenant engagements: Bluefox Brands, Evergreen Agriculture Industries, Mass Cannabis Growers Cooperative, and Blossom Flower. Each tenant runs on the same infrastructure we built for the landlord, extended into their leased space.</p>
283283
</div>
284284
</div>

0 commit comments

Comments
 (0)