- Goal:
- Scope (paths/files):
- Steps: 1. 2. 3.
- Success criteria (verifiable):
- Required checks pass
- Security signals reviewed (as applicable)
- Risks + mitigations:
- Rollback / escalation plan:
- Workflow run(s):
- Scan results (if applicable):
- Plan reviewed and approved
- Required reviews satisfied
- Required checks satisfied