dsl/compiler: Extend solver_parameters handling in PETScSolve and update logging #8549
pytest-core-mpi.yml
on: pull_request
Matrix: pytest-mpi
Matrix: pytest-mpi
Annotations
6 errors
|
pytest-mpi (3.9)
Process completed with exit code 1.
|
|
pytest-mpi (3.11)
The operation was canceled.
|
|
pytest-mpi (3.11)
The strategy configuration was canceled because "test-mpi-basic._3_9" failed
|
|
pytest-mpi (gcc)
Process completed with exit code 1.
|
|
pytest-mpi (icx)
The operation was canceled.
|
|
pytest-mpi (icx)
The strategy configuration was canceled because "test-mpi-docker.gcc" failed
|