Deployment

Everything ships through one script, deploy.sh, run on the server. It is a batch job, not a pipeline: there is no CI, nothing validates a push, and nothing rolls back. What the script does is the whole of what happens at deploy time, so the script has to be kept in step with the codebase by hand. This document is the record of that contract.


The two-branch model, and why it matters here

Branch What it is
main Visualex "vanilla" — the product in production
visualex-merlt-main The AI-powered experiment. Never deployed.

The pull at step 1 is:

git pull -r origin "$(git branch --show-current)"

It follows whatever branch the server happens to be on. If a debugging session ever left the server checked out on visualex-merlt-main, this would ship the experiment — including a Python sidecar and a Docker stack production has no configuration for.

Step 0 therefore refuses to run from anything but main, detached HEAD included:

✗ Refusing to deploy from branch 'visualex-merlt-main' — expected 'main'.
  Switch with: git checkout main
  Or, if this is deliberate, re-run with --allow-branch

--allow-branch downgrades it to a warning, for the deliberate case of deploying a hotfix branch.

Work flows one way, mainmerlt. Vanilla fixes are committed on main through short-lived branches; merlt absorbs them with a periodic git merge main. Nothing is ever cherry-picked back.


What deploy.sh does

./deploy.sh --patch     # build, bump 1.0.0 -> 1.0.1, restart
./deploy.sh             # build and restart, no version bump
./deploy.sh --no-pull   # build what is already checked out
./deploy.sh --no-restart

The steps, and what each one is there to prevent. Most were added after their absence broke a deploy, which is why they read as a list of scars:

# Step Why it is there
0 Branch guard Refuses to deploy from anything but main. See above.
1 git pull -r on the current branch Rebases onto the remote. Discards lockfile churn if it finds any — with npm ci there should be none, so this is now a net for a hand-run npm install — and refuses to continue if anything else in the tree is dirty: git pull -r cannot rebase over unstaged changes, and a deploy must not silently discard work it did not create.
2 pip install -r requirements.txt Runtime deps only. requirements-dev.txt (pytest) is deliberately not installed in production. Now includes lxml (the Akoma Ntoso parser): it ships a cp314 wheel, so the server needs no compiler — check that before pinning a version that has none.
2b playwright install chromium pip install does not fetch browser binaries. Without this, PDF export and date completion break at runtime, not at build time.
3 npm ci in backend/ Installs exactly the committed lockfile and never rewrites it. If it fails with EUSAGE the lockfile and package.json have drifted — commit an updated lockfile, do not fall back to npm install.
3b npx prisma generate A schema change pulled from git leaves node_modules/@prisma/client stale, and the backend build then fails on missing models.
3c npx prisma migrate deploy Idempotent. Without it a schema change ships with no matching column and the API fails on the first query that touches it.
4 npm ci in frontend/
5 npm run build (frontend) tsc -b && vite build. This is the real type-check — it walks the project references, which a bare tsc --noEmit does not.
6 npm run build (backend) pm2 runs node dist/index.js, so skipping this leaves the service on a stale dist/. tsc type-checks as it emits and fails before writing.
7 Version bump + commit Only when --major/--minor/--patch is passed.
8 Restart pm2 restart all, else systemctl restart visualex-backend.

Before you run it

The script builds but never runs a test, and it still has no rollback. Since the transfusion round there is CI (.github/workflows/ci.yml) on every PR into main and on main itself — Python tests on 3.12 and 3.14, the three frontend gates, backend tests, plus a weekly pip-audit / npm audit — so a red main is now visible before a deploy rather than after it. It is a signal, not a gate: deploy.sh does not consult it and will happily ship a red commit. Run the suites first, from the repo root:

.venv/bin/python -m pytest tests/ -q
cd backend && npm test
cd frontend && npm run build && npx vitest run

Expected today: 400 Python (1 deselected — the live marker), 35 backend, 194 frontend.

The backend suite needs backend/.env.test pointing at a separate database (visualex_test, not visualex_platform) — it runs prisma migrate reset on whatever DATABASE_URL it is given. There is a guard against resetting a non-test database, but check the file rather than trusting it.

There are no end-to-end tests on main. Builds and unit tests do not catch a visual or interaction regression, so after a deploy that touched the frontend, open the app and walk the main flows: search, dossier, workspace.


Environment variables

Not in git. They live in .env on the server, and a missing one either falls back silently or stops the boot.

Backend (backend/.env) — DATABASE_URL and JWT_SECRET are validated at startup and the process refuses to boot without them. See backend/.env.example.

Variable Note
DATABASE_URL Required
JWT_SECRET Required. Generate with openssl rand -base64 32
JWT_ACCESS_EXPIRY / JWT_REFRESH_EXPIRY Default 30m / 7d
ALLOWED_ORIGINS Comma-separated. Must list the production origin
PORT / NODE_ENV
REDIS_ENABLED / REDIS_URL With Redis off the rate limiter falls back to per-instance memory and logs a warning

Python API — all optional, all with defaults:

Variable Default Note
ALLOWED_ORIGINS localhost only Set this in production, or CORS silently allows only localhost
RATE_LIMIT / RATE_LIMIT_WINDOW 1000 / 600 Per-IP counter
REDIS_ENABLED / REDIS_URL / REDIS_CACHE_PREFIX off Falls back to a filesystem cache
PERSISTENT_CACHE_TTL 86400
HTTP_MAX_CONCURRENCY, HTTP_TIMEOUT, HTTP_MAX_RETRIES, HTTP_BACKOFF_FACTOR, HTTP_INITIAL_BACKOFF, HTTP_MIN_INTERVAL, HTTP_JITTER see tools/config.py Scraper tuning
FETCH_QUEUE_WORKERS / FETCH_QUEUE_DELAY
AKN_ENABLED true Kill switch for the Akoma Ntoso path (article index + last-resort text fallback). Read at call time, so flipping it needs no code change
AKN_CACHE_MAX_ACTS 40 Article indexes held in memory, a few tens of KB each. Texts are never cached

Maintaining the batch

deploy.sh encodes assumptions about the project. When one of these changes, the script changes with it — otherwise the deploy fails on the server, where finding out is most expensive.

  • New runtime dependency → make sure it is in requirements.txt or the right package.json. Test-only deps belong in requirements-dev.txt or devDependencies, which production never installs.
  • Prisma schema change → nothing to do; steps 3b and 3c cover it. But the migration must be committed. A schema edit without a migration file passes the build and breaks at runtime.
  • New service or process → step 8 must learn to restart it, and the pm2 definition must exist on the server (see the gap below).
  • New required env var → add it to backend/.env.example, add it to the table above, and set it on the server before deploying. A backend var that is validated at boot will take the service down.
  • Build command or output path change → steps 5, 6 and the pm2 start script must agree on where the artefacts land.

Node runtime

The box runs Node 24 (NodeSource) / npm 11, matching both CI and the npm that writes the committed lockfiles. That alignment is what lets steps 3 and 4 use npm ci; it was Node 20 / npm 10 until 29 August 2026, and the mismatch rewrote the lockfiles on every deploy.

Upgrading is an apt operation, because Node comes from NodeSource:

sudo sed -i 's|node_20.x|node_24.x|' /etc/apt/sources.list.d/nodesource.list
sudo apt-get update && sudo apt-get install -y nodejs
pm2 update            # restarts the pm2 daemon under the new Node

pm2 lives in /usr/lib/node_modules, which the nodejs package does not own, so it survives the upgrade — but pm2 update is required, or the daemon keeps running on the old binary. Run pm2 save first.

To roll back, restore /etc/apt/sources.list.d/nodesource.list.bak-node20 and sudo apt-get install -y nodejs=20.19.6-1nodesource1, then reinstall node_modules in both backend/ and frontend/.

Keep this in step with .github/workflows/ci.yml, which pins Node 24. If the two drift again, the lockfile churn comes back.

nginx routes the Python API by prefix, and the list is hand-maintained

/etc/nginx/sites-enabled/visualex proxies to the Quart app only for paths matching one regex:

location ~ ^/(fetch_|search_|stream_|export_|history|version|health|dossiers|parse_query)

Anything else is served as frontend. A new endpoint whose path does not start with one of those prefixes is invisible in production — nginx answers with the SPA and the client sees a 405 or an HTML page, while every local test passes.

This has cost two incidents in one day: /parse_query and /search_case_law. When adding an endpoint, either name it with an existing prefix or add the new one here, and verify against production with curl after deploying — the deploy script does not check.

Config changes are made with sudo, after sudo nginx -t and with a timestamped backup beside the file.

The shared HTTP client binds to the first event loop that used it

visualex_api/services/http_client.py keeps one module-level ThrottledHttpClient whose aiohttp.ClientSession is created lazily and then memoised. It binds to whatever event loop was running at that moment.

pytest-asyncio gives each test its own loop, so the second live test in a single process fails with "Event loop is closed" — and that surfaces as the adapter reporting the source unreachable, which is the worst possible disguise: it looks exactly like the remote site being down.

Today only one test carries the live marker, so the bug is dormant. The moment a second one is added, reset the client between tests (replace the instance's __dict__ in an autouse fixture) rather than spending an afternoon believing Normattiva is down.

Known gaps

Recorded rather than fixed, so nobody rediscovers them during an incident.

  • CI does not gate the deploy. .github/workflows/ci.yml runs the Python suite on 3.12 and 3.14, the three frontend gates and the backend tests on every push to main — but deploy.sh consults nothing and runs no tests, so a red main still deploys. Read the run on GitHub before deploying; the pre-deploy checklist above is still run by hand or not at all.
  • The systemctl path only restarts the backend. pm2 restart all covers every registered process, but the systemctl fallback restarts visualex-backend alone — the Python API on :5000 keeps running the old code.
  • The pm2 process definitions are not in the repo. There is no ecosystem.config.js. What pm2 runs, with which env and which working directory, exists only on the server; if that machine is lost, so is the knowledge. start.sh is a development launcher (npm run dev, python app.py &) and is not what production runs.
  • The version bump commit is never pushed. It stays local to the server, so the server's main sits one commit ahead of origin/main and git pull -r rebases it forward on every deploy.
  • requirements.txt has no version pins. Builds are not reproducible, and a compromised or breaking upstream release lands in production on the next deploy without anyone choosing it.
  • No rollback. Recovery means checking out the previous tag and re-running the script — and prisma migrate deploy does not walk migrations backwards.