Skip to content

Technical Note: Area 4 : Forward Compatibility / Roadmap for future Convergence #20

@woodsmc

Description

@woodsmc

Based on the Alternative_Solutions_(WASI_Wasm).md provide technical notes on:

  • Proposed standards process changes for continued standardization based on WASI 0.1 while not slowing WASI 0.2+ / WASI 1.0 RC work

(Perhaps the following would be better as it's own presentation - keep note above focused?)

  • Proposed standard process changes with phase gate quality measured based on NFRs; performance metrics compared to same operation (if possible) in native / WASI 0.1 / CM model.

  • How CM based binaries can execute on non CM enabled core-wasm runtimes

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions