V-Model Development Process with StrictDoc

1. Purpose

This document defines the development process along the V-Model and how each level is represented and traced in StrictDoc. Every artifact on the left side (specification) has a counterpart on the right side (verification). Traceability is maintained in StrictDoc from user requirement down to source code and back up to acceptance test.

2. Overview

User Requirements  ────────────────────────────────────────  Acceptance Tests
   System Requirements  ────────────────────────────────  System Tests
      Software Requirements  ───────────────────────  Integration Tests
         Software Architecture  ───────────────  Software Tests
            Unit Design  ───────────────────  Unit Tests
                       Implementation
  • Downward (left): each level refines its parent level.
  • Horizontal: each test level verifies the specification level opposite to it.
  • Upward (right): test levels are executed bottom-up; a level starts only when the level below has passed.

3. Levels at a Glance

# Level Document UID prefix Refines (Parent) Verified by
1 User Requirements 01_user_req.sdoc UR- – Acceptance Tests
2 System Requirements 02_system_req.sdoc SYS- UR- System Tests
3 Hardware Requirements 03_hardware_req.sdoc HWR- SYS- Inspection, bench, HIL
3 Software Requirements 03_software_req.sdoc SWR- SYS- Integration Tests
4 Software Architecture 04_software_arch.sdoc SWA- SWR- Software Tests
5 Unit Design Doxygen in the source see §4.5 SWA- Unit Tests
6 Implementation src/ – SWD- –
# Test level Document UID prefix Verifies
7 Unit Tests 07_unit_tests.sdoc UT- SWD-
8 Software Tests 08_software_tests.sdoc SWT- SWA-
9 Integration Tests 09_integration_tests.sdoc IT- SWR-
10 System Tests 10_system_tests.sdoc ST- SYS-
11 Acceptance Tests 11_acceptance_tests.sdoc AT- UR-

Level 3 has two branches, which is the classic V and was implicit here until the hardware one was written down. SYS-HW-* says what the system needs; HWR-* says what the board has to achieve, with the numbers. A requirement belongs in the hardware branch when getting it wrong is a board change rather than a firmware one.

4. Specification Phases (Left Side)

4.1 User Requirements (UR-)

  • Purpose: capture what the user or customer needs, in their language.
  • Input: customer specification, use cases, standards, stakeholder interviews.
  • Content: needs, operating scenarios, constraints. No solution details.
  • Target markets: the countries or regions in which the product will be placed on the market or operated. Each is stated as its own requirement, so that market-specific requirements can be traced to it.
  • Regulatory framework: the regulations, directives and standards that apply as a consequence of the target markets and the intended use. Each is stated as its own requirement with:
    • identifier and edition/date (e.g. "ISO 13849-1:2023"),
    • type (regulation, directive, harmonised standard, customer standard),
    • the target markets it applies to,
    • scope of applicability (whole product or specific functions).
  • Exit criteria: every requirement is uniquely identified, agreed with the stakeholder and has an acceptance criterion; target markets are complete and confirmed by the stakeholder; for every target market the applicable regulations, directives and standards are identified with their edition.

Recommended structure of 01_user_req.sdoc:

Section UID prefix Content
Target markets UR-MKT- one item per country or region
Regulations, directives, standards UR-REG- one item per document, linked to UR-MKT-
User needs UR- functional and operational needs

Example:

[REQUIREMENT]
UID: UR-MKT-001
TITLE: Target market European Union
STATEMENT: >>>
The product shall be suitable for placing on the market in all member states
of the European Union.
<<<

[REQUIREMENT]
UID: UR-REG-003
TITLE: Machinery Regulation
STATEMENT: >>>
The product shall comply with Regulation (EU) 2023/1230.
<<<
RELATIONS:
- TYPE: Parent
  VALUE: UR-MKT-001

UR-REG- items are refined like any other user requirement: the system requirements derived from a regulation or standard reference it as parent, so compliance can be shown through the traceability matrix. A change of target markets or a new edition of a standard triggers the impact analysis of rule 6 in section 8.

4.2 System Requirements (SYS-)

  • Purpose: translate user needs into verifiable technical requirements of the whole system (hardware + software + mechanics).
  • Input: user requirements.
  • Content: functional and non-functional requirements, external interfaces, environmental and safety requirements.
  • Exit criteria: every UR- is covered by at least one SYS-; every SYS- has a parent or a documented rationale; each is testable.

4.3 Software Requirements (SWR-)

  • Purpose: define what the software must do, as allocated from the system.
  • Input: system requirements, hardware/software interface.
  • Content: software functions, timing, resource limits, interfaces to hardware, error handling.
  • Exit criteria: every software-relevant SYS- is covered; no SWR- without parent.

4.4 Software Architecture (SWA-)

  • Purpose: define the static and dynamic structure of the software.
  • Input: software requirements.
  • Content: components, their responsibilities, interfaces, data flow, scheduling, resource budgets.
  • Exit criteria: every SWR- is allocated to at least one component; every interface is specified on both sides.

4.5 Unit Design

  • Purpose: specify each unit in enough detail to implement and test it.
  • Input: software architecture.
  • Content: per unit: functions, parameters, value ranges, algorithms, state machines, error behaviour.
  • Exit criteria: every SWA- component is broken down into units; every unit design element is testable in isolation.

This level is generated from the source and has no .sdoc of its own, and the departure from the pattern is deliberate. Every other level describes something that does not exist yet; this one describes code that does. A separate document saying what a function's parameters, ranges and error behaviour are is a second description of the same thing, and when the two disagree it is found by whoever is auditing rather than by whoever is editing.

So the unit design lives in Doxygen comments beside each unit, and tools/udd.sh produces the document. Three consequences worth stating:

  • There are no SWD- identifiers. A unit's identity is its name, which the compiler already enforces and nothing can silently rename. What rule 6 of section 8 asks of a SWD-, that it trace up and down, is carried by \implements, \derivedfrom and \verifiedby, each of which becomes a cross-referenced index page in the generated document.
  • The gate is doxygen's warnings, with WARN_AS_ERROR, so an undocumented function, struct or parameter fails CI rather than producing a document with a hole in it. That needs EXTRACT_ALL = NO and HIDE_UNDOC_MEMBERS = NO, which is the only one of the four combinations that warns; the Doxyfile's table records the other three, each of which is silent.
  • Coverage is counted separately, by tools/udd-coverage.py, and the separation has earned itself twice. Doxygen cannot see a file that carries no \file block at all, members included, and says nothing about it: two of the four headers were in exactly that state while the build was green. It also cannot notice that an EXCLUDE_SYMBOLS pattern meant to exempt the board layer has reached into the safety function and quietly removed five documented constants, which is what happened and what the count caught.

The fields each unit carries, and why those: firmware/supervisor/Doxyfile states the five questions an assessment under EN ISO 13849-1:2023 cl. 4.6 or EN IEC 60730-1 Annex H actually asks of a safety function, and each alias exists to answer one of them in a fixed place.

5. Implementation

  • Purpose: realise the unit design in source code.
  • Input: unit design, coding guidelines.
  • Traceability: source code references the SWD- UID it implements using a StrictDoc relation marker (see 7.3).
  • Exit criteria: code compiles without warnings, static analysis is clean, review is done, every unit design element is linked to code.

6. Verification Phases (Right Side)

6.1 Unit Tests (UT-) – verify Unit Design

  • Scope: a single unit in isolation; dependencies are stubbed or mocked.
  • Methods: requirement-based tests, boundary values, equivalence classes, structural coverage measurement.
  • Exit criteria: every SWD- has at least one passing UT-; coverage target reached.

6.2 Software Tests (SWT-) – verify Software Architecture

  • Scope: units integrated into components and components into the complete software; typically on host or simulator.
  • Methods: interface tests, data and control flow tests, resource usage.
  • Exit criteria: every SWA- interface and component has a passing SWT-.

6.3 Integration Tests (IT-) – verify Software Requirements

  • Scope: integrated software running on the target hardware.
  • Methods: requirement-based tests, hardware/software interface tests, timing and fault injection tests.
  • Exit criteria: every SWR- has at least one passing IT-.

6.4 System Tests (ST-) – verify System Requirements

  • Scope: complete system in a representative environment (e.g. HIL).
  • Methods: functional, performance, environmental, robustness tests.
  • Exit criteria: every SYS- has at least one passing ST-.

6.5 Acceptance Tests (AT-) – validate User Requirements

  • Scope: complete system in its intended use, with or by the customer.
  • Methods: scenario-based tests against the acceptance criteria.
  • Exit criteria: every UR- has at least one passing AT-; customer sign-off.

7. Realisation in StrictDoc

7.1 Repository Layout

project/
├── strictdoc.toml
├── docs/
│   ├── 01_user_req.sdoc
│   ├── 02_system_req.sdoc
│   ├── 03_software_req.sdoc
│   ├── 04_software_arch.sdoc
│   ├── 05_unit_design.sdoc
│   ├── 07_unit_tests.sdoc
│   ├── 08_software_tests.sdoc
│   ├── 09_integration_tests.sdoc
│   ├── 10_system_tests.sdoc
│   └── 11_acceptance_tests.sdoc
├── src/
└── tests/

7.2 Relations

Two relation types are sufficient:

Relation From → To Meaning
Parent lower spec level → upper level "refines"
Parent / Verifies test case → specification item "verifies"
File spec or test item → file "implemented in / run by"

Specification item:

[DOCUMENT]
TITLE: Software Requirements
UID: SWR
VERSION: 0.1

[REQUIREMENT]
UID: SWR-012
STATUS: Approved
TITLE: Output shutdown on overcurrent
STATEMENT: >>>
The software shall switch off the output within 10 ms after an overcurrent
condition is detected.
<<<
RATIONALE: >>>
Protects the output stage.
<<<
RELATIONS:
- TYPE: Parent
  VALUE: SYS-007

Test case (the role Verifies must be declared in the document grammar):

[REQUIREMENT]
UID: IT-031
TITLE: Overcurrent shutdown time
STATEMENT: >>>
Inject an overcurrent on the output and measure the time until switch-off.
Pass: switch-off time <= 10 ms.
<<<
RELATIONS:
- TYPE: Parent
  VALUE: SWR-012
  ROLE: Verifies
- TYPE: File
  VALUE: tests/integration/test_overcurrent.py

7.3 Source Code Traceability

Enable the feature in strictdoc.toml:

[project]
title = "My Project"
features = [
  "REQUIREMENT_TO_SOURCE_TRACEABILITY",
]

Mark the implementing code with the unit design UID:

/**
 * @relation(SWD-045, scope=function)
 */
void output_shutdown(void)
{
    ...
}

Unit test code is marked the same way with the UT- UID.

7.4 Generating and Checking

strictdoc export .      # generate HTML incl. traceability views
strictdoc server .      # edit and browse in the web UI

strictdoc export runs in CI. A broken relation (unknown UID) fails the build. The traceability matrix and the deep-traceability view are used as review evidence.

8. Process Rules

  1. Unique UIDs: every item has a stable UID with the level prefix; UIDs are never reused.
  2. No orphans: every item below UR- has at least one parent; every specification item has at least one child or a rationale why not.
  3. Full coverage: every specification item is verified by at least one test case on the opposite level.
  4. Tests are specified early: the test specification of a level is written when the opposite specification level is approved, not after implementation.
  5. Status workflow: Draft → In Review → Approved. Only approved items may be refined or implemented.
  6. Change handling: a change to an item triggers an impact analysis along its relations: children, implementing code and verifying tests are re-reviewed.
  7. Baselines: documents and code are versioned together in Git; a release is a tag for which the StrictDoc export is archived together with the test results.

9. Phase Gates

Gate Condition
Requirements freeze UR-, SYS-, SWR- approved; upward coverage complete
Design freeze SWA-, SWD- approved; all SWR- allocated
Code complete all SWD- linked to source; static analysis and review passed
Software release UT-, SWT-, IT- passed; coverage targets met
System release ST- passed; open issues assessed
Acceptance AT- passed; customer sign-off

10. How this project realises the process

Added when the existing requirements and architecture documents were restructured onto the levels above. This section records what was done, where it departs from the sections above, and what is not done yet, so that the gap between the process and its realisation is visible rather than assumed away.

10.1 Documents

Level Document Prefix State
1 User requirements 01_user_req.sdoc UR-, UR-MKT-, UR-REG-, UR-CON- written
2 System requirements 02_system_req.sdoc SYS-HW-, SYS-SAF-, SYS-ASM- written
3 Software requirements 03_software_req.sdoc SWR- + area written
4 Software architecture 04_software_arch.sdoc SWA- written
5 Unit design Doxygen comments in the source, built by tools/udd.sh not SWD-, see below Written for the supervisor, and generated rather than maintained. All four headers complete: 76 of 76 public functions and constants, with no exemption in core/ or protocol/. Enforced two ways, and both are needed. The controller has none.
7 Unit tests 07_unit_tests.sdoc UT- not written
8 Software tests 08_software_tests.sdoc SWT- not written
9 Integration tests 09_integration_tests.sdoc IT- not written
10 System tests 10_system_tests.sdoc ST- not written
11 Acceptance tests 11_acceptance_tests.sdoc AT- not written

Two concept documents sit alongside rather than inside the levels: safety.sdoc and security.sdoc. They are analyses, not specification levels: hazards, safety goals, threats and residual risks, each relating down into the requirements that discharge them. Keeping them beside the V rather than on it is deliberate; a hazard is not a refinement of a user requirement.

The 467 automated tests that already exist are not yet specified as UT- and IT- items. Until they are, rule 3 of section 8 is not met: coverage runs from requirement to test by naming convention and by @relation markers, not by a test specification. That is the largest remaining gap and it is specification work rather than test work, because the tests themselves are written and passing.

10.2 Deviations from the sections above

Sub-prefixes within a level. Section 3 shows flat numbering (SWR-012). This project keeps the functional area in the identifier: SWR-CTL-07, SYS-HW-13, SWR-SAF-25. With 169 software requirements, SWR-CTL-07 says where it belongs and SWR-112 does not, and the areas were already the document's structure. Section 4.1 already uses sub-prefixes for UR-MKT- and UR-REG-, so the pattern is the guide's own.

Numbering is not compacted. SWR-SAF- runs 04 to 31 with 01, 02, 03 and 24 missing, because those four are system level and are SYS-SAF-01/02/03/24. SRR- in the security concept has no 10. The gaps are kept on purpose: these identifiers are cited from the firmware, from the tests, from the two concept documents and from commit messages, and closing a numbering gap would break every one of those citations to buy nothing.

Section titles keep their old numbers. 02_system_req.sdoc contains sections titled "6. Hardware interface requirements" and "9. Assumptions" even though it has three sections, because a great deal of prose across the repository refers to "§6" and "§9" by those numbers. Renumbering is a separate tidy.

Statuses are not yet used as section 8 rule 5 describes. The workflow Draft → In Review → Approved is not in force; items carry Active, Withdrawn, Superseded, Reversed or Resolved, which record what happened to a requirement rather than how far it has got through review. The phase gates of section 9 therefore cannot be evaluated yet.

10.3 Target markets

The target market is the European Union, with the EEA EFTA states and Switzerland as secondary (UR-MKT-001, UR-MKT-002). Fifteen UR-REG- items record the legislation and standards that follow, each with its instrument number, edition, type and the route it applies to.

The project has two routes to market and they carry different obligations: finished units placed on the market by Bitcrush Testing, and a published design built by somebody else who then becomes the manufacturer of the finished machine. UR-REG- items carry a ROUTE field for this reason.

One finding from writing that section deserved to be read by anyone planning a release: the Cyber Resilience Act requires security updates to be available, and this device had no field update path at all. That was UR-REG-004 against SRR-11, and it made OQ-08 a regulatory deadline rather than an engineering preference. OQ-08 and OQ-R4 were answered on 2026-10-09: the device pulls a signed manifest from update.bitcrushtesting.com, the local display announces an available release, and the operator confirms there, with the web interface staying read-only (security.md §6.2, SWR-UPD-09 to SWR-UPD-16). The deadline has not gone away, it has changed character: SRR-11 now stands on implementation rather than on an open decision, and the CRA's reporting obligations start on 11 September 2026 regardless of what the firmware does. Two further questions, OQ-R1 on whether the controller is a machinery safety component and OQ-R2 on the radio conformity route, still decide how expensive the sold-units route is. None of section 2 is a conformity assessment, and SYS-SAF-24 already requires the documentation to say what this device is not.