Archived 2026-07-02 — active milestone tracking moved to Linear (Reflective team). This file is kept for historical context only. Do not add new items here.
Single source of truth for what ships and when. Every session starts by reading this file. Scope work to the current milestone. Detailed deliverables live in
kb/Planning/Milestones.md.See
~/dev/reflective/bedrock-platform/EPIC.mdfor the coarse-grained outcomes these milestones advance.
Deadline: TBD | Epic: E5 Tie off the trailing work from the just-shipped Runtime Runway boundary refactor: get Quorum/Atlas running in production, restore CI on the post-rename workspace, and close the recovery audit on what the application-server deletion may have collaterally removed.
RR D5 is shipped (2026-07-01). StorageKit.leases is available. Helms can apply
SessionOwnershipLayer to its mutating routes now — this unblocks multi-instance
deployment and makes gaps 2–5 below the critical path.
Remaining scale gaps (all Helms work):
- Apply
SessionOwnershipLayerto Quorum/Atlas mutating routes (RR D5 now available) - Durable coordination state — migrate
SessionRegistry,PresenceRegistrytoDocumentStore - Persistent
DecisionLedger— gate decisions must survive process restart - Topology consistency model — formalize read-consistency semantics under concurrent admission writes
- Mobile SSE resilience — server-side delivery tracking + client ack (delivery + completion) — in progress
Boundary refactor closeout:
- Phase 10 — Cloud Run deploy for Quorum and Atlas (not Catalyst)
- CI repair — replace
actions/checkoutpath: ../Xwith direct git clone for sibling-repo path-deps - Recovery audit A —
http_api.rsroute-by-route consumer survey (~2,200 deleted lines) - Recovery audit B —
IdentityGrpc/TruthCatalogGrpc/ModuleRegistryGrpcconsumer survey - Recovery audit C — 5 subscription truth bodies: decide commerce-rails-truths vs plain operations
- Quorum boundary Wave 1 — execute HELMS
H-2026-06-15-01throughH-2026-06-15-05inQUALITY_BACKLOG.md
Detailed steps for recovery items A–C live in runtime-runway/docs/superpowers/plans/2026-05-30-recover-lost-functionality.md.
Deadline: TBD | Epic: E5
Notes app on the runway after platform-polish closes. Core vault is live; source imports (Google, web, LinkedIn, IG, FB, X), intelligence enrichment (OCR, PDF, vision, entity extraction), desktop UX, and receipt-OCR for expenses are still open. Full deliverable list in kb/Planning/Milestones.md.
Deadline: TBD | Epic: E5 Align code, API, and CLI to the Helm Surface Model. CLI command taxonomy from truth catalog, surface-neutral API namespaces, crm-* → helm-* renames.
Deadline: TBD | Epic: E5 Billing hardened, CLI ships, first paying customer.
Deadline: TBD | Epic: E5 Analytics-backed truths, second vertical.
Deadline: TBD | Epic: E5 Convergence loops that generate, verify, and deploy executable code (Wasm via Axiom).
Generic server ownership decoupled from Helm. application-server work classified and rehomed: host concerns (auth, middleware, telemetry, storage, deploy) into runtime-runway; operator-control + governed-job routes extracted into helm-operator-control and helm-governed-jobs as mountable HelmModules; domain truths into per-app packets. Catalyst, Quorum, and Atlas backends all migrated to RunwayAppHost. application-server deleted (Phase 9).
Governed multi-truth pipeline (score → qualify → schedule) with live convergence visibility and HITL approvals. SSE endpoint, desktop pipeline page, helm-notes capture, EXP-001/EXP-002 confirmed.