Skip to content

effects: park Flanger (Phase 3 gate) #55

Description

@bdbarnett

Stakes: Phase 3 Flanger stays modulation.Flanger. The Electric Mistress rebuild is not shipped.

Parked, not THROUGH. Gate auditor 2026-09-08, effects/p3-integration. Record: docs/effects-internal/audits/effects-phase3-gate-audit.md. Parent: #31.

Cause: G2 — TAIL / kit.state / allocation unmeasured. G3/G4 — independent pass refutes F3 at 44.1/22.05 kHz (rise 14.624 / 14.832 dB vs ≥15), F6 t90 (identical on NoSlew and wire), F8 audio t60 1.47 s < 2 s; F6 plant silent at constructor defaults. G5/G9 as for the family (board FNV empty; catalogue “unmeasured”).

G6 fits +options FeedbackDelay (5.8/9.8 % vs 9/15).

Trigger: measure the unmeasured Tier 1 cells; regrade or replant so every remaining demonstrated row fires at defaults and cannot be dialled healthy; board digests with a non-class cause; measured cost in the catalogue.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions