Stakes: Phase 3 Flanger stays modulation.Flanger. The Electric Mistress rebuild is not shipped.
Parked, not THROUGH. Gate auditor 2026-09-08, effects/p3-integration. Record: docs/effects-internal/audits/effects-phase3-gate-audit.md. Parent: #31.
Cause: G2 — TAIL / kit.state / allocation unmeasured. G3/G4 — independent pass refutes F3 at 44.1/22.05 kHz (rise 14.624 / 14.832 dB vs ≥15), F6 t90 (identical on NoSlew and wire), F8 audio t60 1.47 s < 2 s; F6 plant silent at constructor defaults. G5/G9 as for the family (board FNV empty; catalogue “unmeasured”).
G6 fits +options FeedbackDelay (5.8/9.8 % vs 9/15).
Trigger: measure the unmeasured Tier 1 cells; regrade or replant so every remaining demonstrated row fires at defaults and cannot be dialled healthy; board digests with a non-class cause; measured cost in the catalogue.
Stakes: Phase 3 Flanger stays
modulation.Flanger. The Electric Mistress rebuild is not shipped.Parked, not THROUGH. Gate auditor 2026-09-08,
effects/p3-integration. Record:docs/effects-internal/audits/effects-phase3-gate-audit.md. Parent: #31.Cause: G2 — TAIL / kit.state / allocation unmeasured. G3/G4 — independent pass refutes F3 at 44.1/22.05 kHz (rise 14.624 / 14.832 dB vs ≥15), F6 t90 (identical on NoSlew and wire), F8 audio t60 1.47 s < 2 s; F6 plant silent at constructor defaults. G5/G9 as for the family (board FNV empty; catalogue “unmeasured”).
G6 fits +options FeedbackDelay (5.8/9.8 % vs 9/15).
Trigger: measure the unmeasured Tier 1 cells; regrade or replant so every remaining demonstrated row fires at defaults and cannot be dialled healthy; board digests with a non-class cause; measured cost in the catalogue.