Skip to content

Commit 865e686

Browse files
docs(changelog): [Unreleased] — the first move (#30), one entry for the whole chain
T6, first item, written in the same session as the work rather than deferred: one entry covering the sit-with move, the deliberate lesson with its evidence sentence, the honest no-lesson shapes, the warm-up into a plan-related primary, the renderers and the Open-the-lesson control, the Start hand-off the Study picker used to lack, and the lifetime rule from council review 8. tasks.md T6 records what of it is done (entry, PR, CI on the reviewed head) and what waits (CI on the council head, fast-forward, archive).
1 parent 3e00f2e commit 865e686

2 files changed

Lines changed: 25 additions & 2 deletions

File tree

‎CHANGELOG.md‎

Lines changed: 22 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -7,7 +7,28 @@ experience may change before `1.0.0`.
77

88
## [Unreleased]
99

10-
_Nothing yet._
10+
### Added
11+
12+
- The `now` engine's recommendation can carry one passive **first move**
13+
(issue #30). On a low-energy day, the sit-with proposal names one tiny
14+
action on the deferred milestone — *Open “Advanced Sql 4H” from Complete Sql
15+
Databases Bootcamp — the match is the phrase “window function” — and read
16+
for ten minutes, nothing more* — naming a lesson only when the Course
17+
Explorer index matches the milestone's own concepts, and stating the course
18+
and the matched concept so a lexical match can be judged from the sentence;
19+
when nothing matches it names the milestone and says why (*no indexed lesson
20+
mentions “window frame” yet*). A plan-related active primary carries the same
21+
move as a warm-up into itself (*… then start the repair* / *the review* /
22+
*the milestone*), never on recall. CLI `now` prints `First move:` beneath the
23+
door; the Today card shows the line with an **Open the lesson** control that
24+
opens the lesson in the Course Explorer beside the current view; Body Double
25+
and Study Session carry the move and the control from the picker into the
26+
live session, and the Today card's **Start →** now hands the Study picker the
27+
action's topic, energy and move (it used to hand it nothing). The move
28+
belongs to the material it arrived beside: editing or re-picking the topic,
29+
a hand-off during a live session, or rejoining another session never shows
30+
it under different material. Proposal only — the companion says nothing
31+
about it. The no-plan payload is byte-identical.
1132

1233
## [0.5.0] - 2026-09-21
1334

‎openspec/changes/body-double-first-move/tasks.md‎

Lines changed: 3 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -96,5 +96,7 @@ edit; each task has a definition of done a reviewer can tick from output.
9696
row 3's world emitted from the GREEN tree through both real collectors, the first move shown as
9797
emitted; verdict `PENDING` until the owner scores it. The change is archived only after the row is
9898
scored **yes**.
99-
- [ ] **T6** CHANGELOG `[Unreleased]` entry; PR; CI green; fast-forward `main`; archive this change;
99+
- [ ] **T6** CHANGELOG `[Unreleased]` entry (written, `3e00f2e2`+1); PR #32 open with the whole chain in
100+
its body; CI green on `c83ebd75` (15/15), running on the council head; fast-forward `main`; archive
101+
this change;
100102
ships in 0.5.1.

0 commit comments

Comments
 (0)