From 64400ef7922cd7e7a0463c59d7eb905bbd410b65 Mon Sep 17 00:00:00 2001 From: Claude Date: Wed, 25 Nov 2026 05:00:16 +0000 Subject: [PATCH 1/3] Issue-205: Record D-43, release milestones replace M1-M5 Closes #205 Co-Authored-By: Claude Sonnet 5.5 Claude-Session: https://claude.ai/code/session_017Dj9JMHTKZZ4Vn2G9wyGNq --- CLAUDE.md | 2 +- docs/architecture/discovery-hunts.md | 2 ++ docs/decisions/README.md | 9 +++++---- docs/decisions/scope-process.md | 24 ++++++++++++++++++++++-- 4 files changed, 30 insertions(+), 7 deletions(-) diff --git a/CLAUDE.md b/CLAUDE.md index 6fe242b1..e0044d24 100644 --- a/CLAUDE.md +++ b/CLAUDE.md @@ -76,7 +76,7 @@ Project agents live in `.claude/agents/` and skills in `.claude/skills/`. Agents ## Build schedule -The team builds from 5 Nov 2026 (decisions D-14), setting aside the event rule against building before 14 Nov. Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" as milestones M1–M5 (D-29). M1–M4 build against fixtures and do not depend on each other; only M5 integrates them. +The team builds from 5 Nov 2026 (decisions D-14), setting aside the event rule against building before 14 Nov. Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" under release milestones (D-43, which amends D-29 and D-30; M1–M5 are closed): **R0** (housekeeping and verification), **R1a** (the release 1 minimum: HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6), **R1b** (the rest of release 1: HN-4, HN-7 to HN-10), **R2** (HN-11 to HN-16), **DR4** (HN-17, ships when Gaia DR4 is out) and **Maintenance** (standing, app fixes outside the hunts). No due dates for now. Difficulty is a label: `good first issue` is Level 1, `help wanted` is Level 2, no label is core work. Atish assigns every ticket. ## Layout diff --git a/docs/architecture/discovery-hunts.md b/docs/architecture/discovery-hunts.md index e9cec02d..888db9a5 100644 --- a/docs/architecture/discovery-hunts.md +++ b/docs/architecture/discovery-hunts.md @@ -1170,6 +1170,8 @@ Owners follow D-17 and are to be confirmed. Each search hunt ticket ships its ca | **HN-17** | H10 cross-match on Gaia DR4 | HN-1; DR4 | Kevin | | Later | Watch saved objects; sharing squares between PCs; replay with hunts | | | +**Milestones (D-43).** Tickets are tracked under release milestones: **R0** (HN-0 and the housekeeping and verification tickets), **R1a** (the release 1 minimum: HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6), **R1b** (the rest of release 1: HN-4, HN-7, HN-8, HN-9, HN-10), **R2** (HN-11 to HN-16, and the release 2 part of HN-4b), **DR4** (HN-17, when Gaia DR4 is out) and **Maintenance** (standing, outside the hunts). The R1a/R1b split and the placing of HN-11 and HN-16 are proposed in D-43 and wait for Atish. + **Order.** HN-5 comes before any search hunt is Validated: a tool whose first hunt misses every known asteroid has no standing to offer more. The export bundle (HN-4b) comes before the first hunt ships, because without it nothing is usable in research. ### A22.13 Tests diff --git a/docs/decisions/README.md b/docs/decisions/README.md index 61721272..6f76c555 100644 --- a/docs/decisions/README.md +++ b/docs/decisions/README.md @@ -10,7 +10,7 @@ The log is split by topic so a task loads only what it needs. **Load this index | File | Holds | Size | |---|---|---| -| [scope-process.md](scope-process.md) | scope cuts, doc layout, owners, build dates, milestones, the post-event backlog, the demo object and data release, ID reservations | 8 D, 13 Q, 23 KB | +| [scope-process.md](scope-process.md) | scope cuts, doc layout, owners, build dates, milestones, the post-event backlog, the demo object and data release, ID reservations | 9 D, 13 Q, 24 KB | | [contract.md](contract.md) | the data contract, object types, the endpoint list (D-16), schemas and generated types, saved assets, `overrides`, card and fixture shapes, cached replies, the issue #93 card fields (Q-363), warm-start health and the demo preflight (Q-454) | 6 D, 19 Q, 22 KB | | [contract-tags.md](contract-tags.md) | provenance tags and badges, the honesty toggle, tier fallback, the policy for unverified constants (Q-110, Q-119), "which tag does X get" | 3 D, 12 Q, 19 KB | | [data-sources.md](data-sources.md) | the backend framework, external archives and adapters, name resolving, the read-through cache and offline mode, test targets, overlays and the composite backends | 4 D, 16 Q, 22 KB | @@ -47,7 +47,7 @@ Agenda of the 11 Nov 2026 decision session: [session-2026-11-11.md](session-2026 ## Rules for entries - **IDs never change and are never reused.** A new decision is the next free `D-` number; a new question the next free `Q-` number. Before you pick one, check `origin/dev` (D-42; `main` is frozen) and the open PRs (they pick numbers too). -- **Next free:** D-43 and Q-487 (24 Nov 2026: issue #200 takes Q-486, Animate UI's licence vs the Space Apps terms). Before that, D-43 and Q-486 (20 Nov 2026: the `dev` branch rule takes D-42; D-41, the project licence, is recorded by issue #204 (branch `chore/license`); the Discovery hunts rows of A22 are registered from D-43 and Q-486 in HN-0). Before that, D-41 and Q-486 (20 Nov 2026: issue #187 takes Q-485, Touch mode after the haptics cut; the Discovery hunts rows of open PR #182 start at Q-486). Before that, D-41 and Q-485 (18 Nov 2026: Q-484 is reserved for the CODEOWNERS and `main` ruleset decision, branch `chore/codeowners`). Before that, D-41 and Q-484 (14 Nov 2026: issue #173, the Discovery journey, takes Q-483). Before that, D-41 and Q-483 (14 Nov 2026: issue #169, runs report failures honestly, takes Q-480 to Q-482; it had drafted Q-479 to Q-481, renumbered after #170 took Q-479 on main). Before that, D-41 and Q-480 (14 Nov 2026: issue #170, the scan and replay honesty, takes Q-479). Before that, D-41 and Q-479 (14 Nov 2026: the Discovery gap analysis takes Q-478). Before that, D-41 and Q-478 (14 Nov 2026: issue #146 takes Q-477). Before that, D-41 and Q-477 (14 Nov 2026: the spectrum check takes Q-474 and Q-475 (its spec, commit 7282456 of docs/spectrum-check, carried by issue #162's PR) and Q-476 (its UI as built, issue #162); checked against `origin/main`, where issue #157 (PR #159) took Q-472, and issue #158 (PR #165) takes Q-473, merged with main on 14 Nov 2026). Before that, D-41 and Q-474 (13 Nov 2026: issue #156 takes Q-470 and Q-471; Q-472 and Q-473 are reserved for #157 and #158; checked against `origin/main` and the open PRs, where PR #150 takes Q-468). Before that, D-41 and Q-470 (13 Nov 2026: the live-areas plan, issues #141 to #146, reserves Q-462 to Q-469; #141 takes Q-462, Q-463 and Q-467; Q-464 and Q-465 are for #143, Q-466 and Q-469 for #145, Q-468 for #142). Before that, D-41 and Q-462 (13 Nov 2026: issue #129 takes Q-461; its Q-455 collided with main's, checked against `origin/main` and the open PRs). Before that, D-41 and Q-461 (13 Nov 2026: issue #72 (PR #133) takes Q-460 (Stage 2 OUTLIER on a mover's core; its Q-456 then Q-459 collided with main's). Before that, D-41 and Q-460: issue #78 (feat/78-path-sound) takes Q-459 (Track path sound as built). Before that it was D-41 and Q-459: issue #77 (feat/77-tone-stream) takes Q-458 (tone stream as built, the grouped exposure tick); open PR #133 also writes Q-456, which collides with main's Q-456. Before that it was D-41 and Q-458: the follow-up to PR #107 (feat/build-view-ambience-minimise) takes Q-456 (Ambience dropdown with the sound settings) and Q-457 (build view: no dock, Minimise, Read paper, no island); issue #130 (PR #131) takes Q-455. Before that it was D-41 and Q-455, 12 Nov 2026, agreed on PR #105 and PR #107: #106 keeps Q-451, #107 takes Q-418, Q-419, Q-450, Q-452 and Q-453 (its build-strip entry, first Q-421, then Q-451, moved to Q-453), issue #103 (PR #105) takes Q-454, #110 took Q-420; Q-421 to Q-429 were never assigned. Before that: D-41 and Q-450, checked against `origin/main` after merging it into issue #93's branch, and the open PRs #107, #110 and #121: issue #93 took D-40 (D-38 on its branch before main's PR #104 took D-38) and Q-337 to Q-387; Q-388 to Q-399 never assigned; PR #121 (#111) takes D-39 and Q-430 to Q-444, #113 took Q-445 (PR #119), Q-446 by #115 (spectrum chord as built, PR #123), Q-447 and Q-448 by #116 (PR #124) and Q-449 by #117 (PR #125); #107 takes Q-418 and Q-419; #110 takes Q-420; Q-421 to Q-429 were never assigned. Q-370 to Q-372 are free but kept for the lead. Within issue #93: the performance waves took Q-381 to Q-387, the physics and data follow-up Q-373 to Q-380, and the regression and operations fixes Q-367 to Q-369. Before that on main: D-39 and Q-418 (12 Nov 2026, checked against `origin/main` and the open PRs #90, #100 and #101; PR #100 takes Q-406 to Q-408), and before that D-38 and Q-337, checked against `origin/main` after merging issue #75, and the open PR #90; issue #71 took D-37 and Q-210 to Q-336). **Taken by feat/matte-glass (PR #107):** Q-418, Q-419, Q-450, Q-452 and Q-453 (matte glass and minimise, build view opens without the split, build view header and Explore, frame-rate menu and sky info popover, one clock for the build strip). **Never assigned (do not reuse):** in issue #71's block, Q-213 to Q-219, Q-223 to Q-229, Q-236 to Q-239, Q-246 to Q-249, Q-264, Q-265, Q-268, Q-269, Q-277 to Q-279, Q-289 and Q-320 to Q-322; also Q-46, Q-127 to Q-129 and Q-149. **Taken by issue #75:** Q-206 (pack never hides a measured spectrum) and Q-207 (Rainbow Trails rotation in the UI). **Taken by feat/ui (PR #104):** D-38 (design language) and Q-409 to Q-417 (light theme, the artist's impression line, Pause, the Show row in Details, the island's pulse, the demo area flows, the mould, Hear it, the tab title; first drafted as Q-326 to Q-330, then Q-403 to Q-407, renumbered after main and PR #100 took those). **Taken by issue #97:** Q-400 to Q-402 (Area frames and dots). **Taken by issue #95:** Q-403 (star list choices) and Q-404 (star list owner), both Proposed; Q-405 reserved with them and never assigned. **Taken by issue #92:** Q-208 (Area contract shape choices, Proposed). **Never assigned:** Q-209. **Taken by issue #80:** Q-205 (event cut, Proposed). **Taken by issue #79:** Q-204 (PNG determinism). **Renumbered:** this PR's Q-150 to Q-183 became Q-170 to Q-203 on 10 Nov 2026, because main took Q-150 to Q-169 in PR #70; Q-203 is the four research checks, Q-170 to Q-202 are the spec-pass proposals. **From PR #53 (merged):** Q-125 (frame search tags and refusals) and Q-126 (MOST). Q-130 to Q-149 were reserved for the Track tool and Area search (Q-130). +- **Next free:** D-44 and Q-487 (25 Nov 2026: issue #205 takes D-43, release milestones). Before that, D-43 and Q-487 (24 Nov 2026: issue #200 takes Q-486, Animate UI's licence vs the Space Apps terms). Before that, D-43 and Q-486 (20 Nov 2026: the `dev` branch rule takes D-42; D-41, the project licence, is recorded by issue #204 (branch `chore/license`); the Discovery hunts rows of A22 are registered from D-43 and Q-486 in HN-0). Before that, D-41 and Q-486 (20 Nov 2026: issue #187 takes Q-485, Touch mode after the haptics cut; the Discovery hunts rows of open PR #182 start at Q-486). Before that, D-41 and Q-485 (18 Nov 2026: Q-484 is reserved for the CODEOWNERS and `main` ruleset decision, branch `chore/codeowners`). Before that, D-41 and Q-484 (14 Nov 2026: issue #173, the Discovery journey, takes Q-483). Before that, D-41 and Q-483 (14 Nov 2026: issue #169, runs report failures honestly, takes Q-480 to Q-482; it had drafted Q-479 to Q-481, renumbered after #170 took Q-479 on main). Before that, D-41 and Q-480 (14 Nov 2026: issue #170, the scan and replay honesty, takes Q-479). Before that, D-41 and Q-479 (14 Nov 2026: the Discovery gap analysis takes Q-478). Before that, D-41 and Q-478 (14 Nov 2026: issue #146 takes Q-477). Before that, D-41 and Q-477 (14 Nov 2026: the spectrum check takes Q-474 and Q-475 (its spec, commit 7282456 of docs/spectrum-check, carried by issue #162's PR) and Q-476 (its UI as built, issue #162); checked against `origin/main`, where issue #157 (PR #159) took Q-472, and issue #158 (PR #165) takes Q-473, merged with main on 14 Nov 2026). Before that, D-41 and Q-474 (13 Nov 2026: issue #156 takes Q-470 and Q-471; Q-472 and Q-473 are reserved for #157 and #158; checked against `origin/main` and the open PRs, where PR #150 takes Q-468). Before that, D-41 and Q-470 (13 Nov 2026: the live-areas plan, issues #141 to #146, reserves Q-462 to Q-469; #141 takes Q-462, Q-463 and Q-467; Q-464 and Q-465 are for #143, Q-466 and Q-469 for #145, Q-468 for #142). Before that, D-41 and Q-462 (13 Nov 2026: issue #129 takes Q-461; its Q-455 collided with main's, checked against `origin/main` and the open PRs). Before that, D-41 and Q-461 (13 Nov 2026: issue #72 (PR #133) takes Q-460 (Stage 2 OUTLIER on a mover's core; its Q-456 then Q-459 collided with main's). Before that, D-41 and Q-460: issue #78 (feat/78-path-sound) takes Q-459 (Track path sound as built). Before that it was D-41 and Q-459: issue #77 (feat/77-tone-stream) takes Q-458 (tone stream as built, the grouped exposure tick); open PR #133 also writes Q-456, which collides with main's Q-456. Before that it was D-41 and Q-458: the follow-up to PR #107 (feat/build-view-ambience-minimise) takes Q-456 (Ambience dropdown with the sound settings) and Q-457 (build view: no dock, Minimise, Read paper, no island); issue #130 (PR #131) takes Q-455. Before that it was D-41 and Q-455, 12 Nov 2026, agreed on PR #105 and PR #107: #106 keeps Q-451, #107 takes Q-418, Q-419, Q-450, Q-452 and Q-453 (its build-strip entry, first Q-421, then Q-451, moved to Q-453), issue #103 (PR #105) takes Q-454, #110 took Q-420; Q-421 to Q-429 were never assigned. Before that: D-41 and Q-450, checked against `origin/main` after merging it into issue #93's branch, and the open PRs #107, #110 and #121: issue #93 took D-40 (D-38 on its branch before main's PR #104 took D-38) and Q-337 to Q-387; Q-388 to Q-399 never assigned; PR #121 (#111) takes D-39 and Q-430 to Q-444, #113 took Q-445 (PR #119), Q-446 by #115 (spectrum chord as built, PR #123), Q-447 and Q-448 by #116 (PR #124) and Q-449 by #117 (PR #125); #107 takes Q-418 and Q-419; #110 takes Q-420; Q-421 to Q-429 were never assigned. Q-370 to Q-372 are free but kept for the lead. Within issue #93: the performance waves took Q-381 to Q-387, the physics and data follow-up Q-373 to Q-380, and the regression and operations fixes Q-367 to Q-369. Before that on main: D-39 and Q-418 (12 Nov 2026, checked against `origin/main` and the open PRs #90, #100 and #101; PR #100 takes Q-406 to Q-408), and before that D-38 and Q-337, checked against `origin/main` after merging issue #75, and the open PR #90; issue #71 took D-37 and Q-210 to Q-336). **Taken by feat/matte-glass (PR #107):** Q-418, Q-419, Q-450, Q-452 and Q-453 (matte glass and minimise, build view opens without the split, build view header and Explore, frame-rate menu and sky info popover, one clock for the build strip). **Never assigned (do not reuse):** in issue #71's block, Q-213 to Q-219, Q-223 to Q-229, Q-236 to Q-239, Q-246 to Q-249, Q-264, Q-265, Q-268, Q-269, Q-277 to Q-279, Q-289 and Q-320 to Q-322; also Q-46, Q-127 to Q-129 and Q-149. **Taken by issue #75:** Q-206 (pack never hides a measured spectrum) and Q-207 (Rainbow Trails rotation in the UI). **Taken by feat/ui (PR #104):** D-38 (design language) and Q-409 to Q-417 (light theme, the artist's impression line, Pause, the Show row in Details, the island's pulse, the demo area flows, the mould, Hear it, the tab title; first drafted as Q-326 to Q-330, then Q-403 to Q-407, renumbered after main and PR #100 took those). **Taken by issue #97:** Q-400 to Q-402 (Area frames and dots). **Taken by issue #95:** Q-403 (star list choices) and Q-404 (star list owner), both Proposed; Q-405 reserved with them and never assigned. **Taken by issue #92:** Q-208 (Area contract shape choices, Proposed). **Never assigned:** Q-209. **Taken by issue #80:** Q-205 (event cut, Proposed). **Taken by issue #79:** Q-204 (PNG determinism). **Renumbered:** this PR's Q-150 to Q-183 became Q-170 to Q-203 on 10 Nov 2026, because main took Q-150 to Q-169 in PR #70; Q-203 is the four research checks, Q-170 to Q-202 are the spec-pass proposals. **From PR #53 (merged):** Q-125 (frame search tags and refusals) and Q-126 (MOST). Q-130 to Q-149 were reserved for the Track tool and Area search (Q-130). - **D-37, Q-286 to Q-288, Q-299 to Q-306 and Q-309 to Q-316 (the engines)** are in [rendering-engines](rendering-engines.md) (moved from rendering-bodies on 11 Nov 2026); their PR #89 review fixes **Q-329 to Q-331, Q-334, Q-335** are in [rendering-engines-review](rendering-engines-review.md). **D-40 and Q-337 to Q-354 (issue #93 engine fixes) and Q-367, Q-368 (#93 regression and operations fixes)** are in [rendering-engines-tuning](rendering-engines-tuning.md), **Q-369 (#93 pack catalogue gap)** in [demo-pack](demo-pack.md), **Q-355 to Q-362 (#93 physics) and Q-373 to Q-380 (#93 physics and data follow-up)** in [physics-fixes](physics-fixes.md), **Q-363 (#93 card fields)** in [contract](contract.md) and **Q-364 to Q-366 (#93 literature and cache)** in [catalogue-values](catalogue-values.md). **D-39, Q-430 to Q-449, Q-458 and Q-459 (sound)** are in [sound-ambience](sound-ambience.md). **Q-294 to Q-298 (stream U, build view)** are in [shell-surfaces](shell-surfaces.md). **Q-274 to Q-276 (stream H, orbit view and close-up pane)** are in [rendering-bodies](rendering-bodies.md). - **One entry, one file.** Put a new entry in the topic file it belongs to and add its row to the index below in the same commit. An entry that changes another one says "amends D-xx" and the amended entry gets an "Amended by" line. - **Status words** (for new entries; older rows keep their wording): **Open**; **Open (built)** (code follows the proposal); **Proposed** (an owner must confirm); **Decided** (who and when); **Partly decided** (list what is open); **Superseded by** (the newer entry rules); **Deferred** (after the event). D- entries are **Accepted** unless marked otherwise. @@ -87,8 +87,8 @@ Every entry, in ID order. Status is shortened; the row in the topic file is auth | D-26 | Sliders on baked bodies | Accepted | [rendering-bodies](rendering-bodies.md#d-26-sliders-on-baked-bodies-answers-q-03) | | D-27 | Type of overrides | Accepted (+ note) | [contract](contract.md#d-27-type-of-overrides-answers-q-13) | | D-28 | Rainbow Trails is a flipbook mode | Accepted | [moving-objects](moving-objects.md#d-28-rainbow-trails-is-a-flipbook-view-mode-answers-q-04) | -| D-29 | Milestones are independent tracks | Accepted | [scope-process](scope-process.md#d-29-milestones-are-independent-tracks) | -| D-30 | Milestone owners and dependencies | Accepted (Atish) | [scope-process](scope-process.md#d-30-milestone-owners-and-dependencies) | +| D-29 | Milestones are independent tracks | Accepted; amended by D-43 | [scope-process](scope-process.md#d-29-milestones-are-independent-tracks) | +| D-30 | Milestone owners and dependencies | Accepted (Atish); amended by D-43 | [scope-process](scope-process.md#d-30-milestone-owners-and-dependencies) | | D-31 | Saturated targets refused; demo objects added | Approved Atish; Moon pending | [data-sources](data-sources.md#d-31-saturated-test-targets-stay-as-refusals-demo-objects-added-answers-q-26) | | D-32 | Tier fallback chain | Accepted (PR #44); Kevin, Atish (haptics) pen… | [contract-tags](contract-tags.md#d-32-tier-fallback-chain-partly-answers-q-38) | | D-33 | Accuracy first | Pending team confirmation | [rendering-bodies](rendering-bodies.md#d-33-accuracy-first) | @@ -101,6 +101,7 @@ Every entry, in ID order. Status is shortened; the row in the topic file is auth | D-40 | Issue #93: engine speed, seeded patterns, physics corrections and new card fields | Decided (Atish, 11 Nov 2026); built except Q-361; Q-346 built by Q-385; performance waves Q-381 to Q-387 | [rendering-engines-tuning](rendering-engines-tuning.md#d-40-issue-93-engine-speed-seeded-patterns-physics-corrections-and-new-card-fields-decided-by-atish-11-nov-2026) | | D-41 | Project licence: BSD-3-Clause for code and mock-ups, CC-BY-4.0 for docs; data and third-party parts keep their terms (their licence table comes with #200); GPL only as an optional plugin the user installs | Decided (Atish, 24 Nov 2026, PR #212); Space Apps terms checked 24 Nov 2026 | [scope-process](scope-process.md#d-41-project-licence) | | D-42 | `dev` is the development branch: all work branches off `dev` and merges back into it by PR; `main` is frozen at `b7b4a1d6` and `dev` is the default branch | Decided (Atish, 20 Nov 2026); GitHub settings to apply | [scope-process](scope-process.md#d-42-dev-is-the-development-branch-main-is-frozen) | +| D-43 | Release milestones R0, R1a, R1b, R2, DR4 and Maintenance replace M1 to M5; difficulty by label; Atish assigns every ticket | Decided (Atish, 20 Nov 2026); the R1a/R1b split and HN-11, HN-16 placement are proposed | [scope-process](scope-process.md#d-43-release-milestones-replace-m1-to-m5) | | Q-01 | Backend framework | Answered: D-15 | [data-sources](data-sources.md) | | Q-02 | Frontend hosting | Answered: D-24 | [platform-hosting](platform-hosting.md) | | Q-03 | Sliders on baked bodies | Answered: D-26 | [rendering-bodies](rendering-bodies.md) | diff --git a/docs/decisions/scope-process.md b/docs/decisions/scope-process.md index b9f71d81..10106e18 100644 --- a/docs/decisions/scope-process.md +++ b/docs/decisions/scope-process.md @@ -50,7 +50,7 @@ - M1 to M4 do not depend on each other. Each builds against its own fixtures (recorded responses, sample cards and spectra). Only M5 joins them. Each milestone holds as few tickets as possible. - Open questions and **[verify]** items sit inside the ticket that needs them. -- **Amended by:** Q-132 (M3 is renamed "Sound") and Q-187 (proposed: M4 also holds Track tickets T1, T2 and T4, A19.14). Area tickets D1 and D2 are in M4 and D3 in M5 ([A16.7](../architecture/moving-objects/area-plan.md#a167-tickets-and-plan)). Status board: [A13](../architecture/plan.md#a13-plan-to-14-nov). +- **Amended by:** Q-132 (M3 is renamed "Sound") and Q-187 (proposed: M4 also holds Track tickets T1, T2 and T4, A19.14). Area tickets D1 and D2 are in M4 and D3 in M5 ([A16.7](../architecture/moving-objects/area-plan.md#a167-tickets-and-plan)). Status board: [A13](../architecture/plan.md#a13-plan-to-14-nov). **Amended by D-43** (20 Nov 2026): M1 to M5 are closed and replaced by release milestones. ## D-30 Milestone owners and dependencies @@ -67,7 +67,7 @@ - The milestone owner leads and signs off the milestone; ticket owners from D-17 still apply inside it. - Numbering: `#1`–`#17` below and in architecture spec §13 are GitHub **issue** numbers (one per ticket); PR numbers are written as "PR #n". - **Dependencies:** M1–M4 have no hard dependency on each other (D-29). Three soft links run across milestones: texture haptics (#11, M3) read the shared CPU field from #8 (M2); the Gemini layer (#14, M4) repaints the albedo from the baker's height map (#6, M2, D-07); physics sliders (#13, M4) need the viewer (#7, M2) to be seen. Each can be built against fixtures first. M5 depends on all of them. The map is in architecture spec §13. -- **Amended by:** Q-132 (M3 is renamed "Sound"; its owner is unchanged). Track tickets: Q-187. +- **Amended by:** Q-132 (M3 is renamed "Sound"; its owner is unchanged). Track tickets: Q-187. **Amended by D-43** (20 Nov 2026): the milestones this entry assigns owners to are closed; ticket owners are named by Atish (D-17). ## D-41 Project licence @@ -100,6 +100,26 @@ - **GitHub settings (an admin, once):** create `dev` from `b7b4a1d6`; copy the `main` ruleset (id 27523962) to a `dev` ruleset; make `dev` the default branch; retarget open PRs. - **Relates to:** Q-484 (code owners and the merge gate), D-17 (owners). +## D-43 Release milestones replace M1 to M5 + +- **Decision (Atish, 20 Nov 2026), amends D-29 and D-30:** the milestones M1 to M5 were closed on 20 Nov 2026. Work is tracked in the same GitHub project, "SphereX and PlanetX - NASA COMPETITION 2026", under these milestones, which follow the releases of [A22.12](../architecture/discovery-hunts.md#a2212-plan-tickets-and-owners): + + | Milestone | Holds | + |---|---| + | **R0** | Housekeeping and verification before the build: HN-0, the `V` checks, the library checks, the README and test-helper tickets | + | **R1a** | The release 1 minimum (A22.12, R-27): HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6 | + | **R1b** | The rest of release 1 (R-8): HN-4, HN-7, HN-8, HN-9, HN-10 | + | **R2** | Release 2: HN-11 to HN-16, and the release 2 part of HN-4b (R-54) | + | **DR4** | HN-17 (H10, cross-match on Gaia DR4). Ships when Gaia DR4 is out | + | **Maintenance** | Standing. App fixes outside the hunts (for example #184, #185) | + + No milestone has a due date for now. +- **Difficulty is a label, not a milestone:** `good first issue` is Level 1, `help wanted` is Level 2, and a ticket with neither is core work. Atish assigns every ticket (D-17). +- **Unchanged:** the contents of the A22 releases. D-43 only names where each ticket is tracked. +- **Why:** M1 to M5 were the event's independent tracks, due 8 to 15 Nov. The event build is done, and the Discovery hunts ship in releases that overlap, so the old names and due dates no longer describe the work. +- **Open for Atish:** the A22.12 text does not define R1a and R1b. The split above follows "Release 1 minimum" (R1a) and issue #202 ("R1b: blocks HN-4"). Placing HN-11 and HN-16 in R2 is also proposed: A22.12 does not label them. +- **Relates to:** D-14 (build dates), D-17 (owners), D-42 (`dev`), A22.12. + ## Post-event backlog | ID | Item | From | From 29096d47ef93f551214f75af57f231dc75324a24 Mon Sep 17 00:00:00 2001 From: Claude Date: Wed, 25 Nov 2026 05:41:14 +0000 Subject: [PATCH 2/3] Issue-205: Apply review feedback on D-43 HN-11 and HN-16 move to R1b as in the GitHub milestones; real milestone titles; CLAUDE.md and A22.12 point to D-43; plan.md and the A22.15 next-free note get pointers. Co-Authored-By: Claude Sonnet 5.5 Claude-Session: https://claude.ai/code/session_017Dj9JMHTKZZ4Vn2G9wyGNq --- CLAUDE.md | 2 +- docs/architecture/discovery-hunts.md | 4 ++-- docs/architecture/plan.md | 2 ++ docs/decisions/README.md | 4 ++-- docs/decisions/scope-process.md | 14 +++++++------- 5 files changed, 14 insertions(+), 12 deletions(-) diff --git a/CLAUDE.md b/CLAUDE.md index e0044d24..d7f93f1c 100644 --- a/CLAUDE.md +++ b/CLAUDE.md @@ -76,7 +76,7 @@ Project agents live in `.claude/agents/` and skills in `.claude/skills/`. Agents ## Build schedule -The team builds from 5 Nov 2026 (decisions D-14), setting aside the event rule against building before 14 Nov. Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" under release milestones (D-43, which amends D-29 and D-30; M1–M5 are closed): **R0** (housekeeping and verification), **R1a** (the release 1 minimum: HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6), **R1b** (the rest of release 1: HN-4, HN-7 to HN-10), **R2** (HN-11 to HN-16), **DR4** (HN-17, ships when Gaia DR4 is out) and **Maintenance** (standing, app fixes outside the hunts). No due dates for now. Difficulty is a label: `good first issue` is Level 1, `help wanted` is Level 2, no label is core work. Atish assigns every ticket. +The team builds from 5 Nov 2026 (decisions D-14), setting aside the event rule against building before 14 Nov. Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" under the release milestones **R0**, **R1a**, **R1b**, **R2**, **DR4** and **Maintenance** (D-43 lists what each holds; it amends D-29 and D-30, and M1–M5 are closed). No due dates for now. Difficulty is a label: `good first issue` is Level 1, `help wanted` is Level 2, no label is core work. Atish assigns every ticket. ## Layout diff --git a/docs/architecture/discovery-hunts.md b/docs/architecture/discovery-hunts.md index 888db9a5..066e18bd 100644 --- a/docs/architecture/discovery-hunts.md +++ b/docs/architecture/discovery-hunts.md @@ -1170,7 +1170,7 @@ Owners follow D-17 and are to be confirmed. Each search hunt ticket ships its ca | **HN-17** | H10 cross-match on Gaia DR4 | HN-1; DR4 | Kevin | | Later | Watch saved objects; sharing squares between PCs; replay with hunts | | | -**Milestones (D-43).** Tickets are tracked under release milestones: **R0** (HN-0 and the housekeeping and verification tickets), **R1a** (the release 1 minimum: HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6), **R1b** (the rest of release 1: HN-4, HN-7, HN-8, HN-9, HN-10), **R2** (HN-11 to HN-16, and the release 2 part of HN-4b), **DR4** (HN-17, when Gaia DR4 is out) and **Maintenance** (standing, outside the hunts). The R1a/R1b split and the placing of HN-11 and HN-16 are proposed in D-43 and wait for Atish. +**Milestones (D-43).** Tickets are tracked under the release milestones R0, R1a, R1b, R2, DR4 and Maintenance. [D-43](../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5) lists the tickets each one holds. **Order.** HN-5 comes before any search hunt is Validated: a tool whose first hunt misses every known asteroid has no standing to offer more. The export bundle (HN-4b) comes before the first hunt ships, because without it nothing is usable in research. @@ -1265,7 +1265,7 @@ The first draft's research (17 Nov 2026) was at the level of search results and ### A22.15 Decisions -This PR may not touch `docs/decisions/`, so nothing here has an id yet. On approval each row becomes a `D-` or `Q-` entry (next free at the time of writing: **D-42** and **Q-485**; PR #183 reserves Q-484 and the project licence takes D-41) in `docs/decisions/moving-objects.md` and the index. R-1 to R-12 were **decided by Moon on 18 Nov 2026**, taking the recommendations made on Atish's twelve questions. R-13 to R-28 and the PD rows were **decided by Moon on 19 Nov 2026** on Atish's re-review (changes requested at 76eca86). R-29 to R-49 were **decided by Moon on 19 Nov 2026** from a literature review (arXiv, ADS, IVOA and archive documentation; abstracts and repository pages, not full texts, so sources not opened are marked [verify] and listed as V37). They are registered only once V37 is closed (HN-0). Atish's third review (20 Nov 2026) corrected the citations of R-29, R-39, R-44, R-46, R-47 and R-48, re-decided R-37, corrected the wording of R-3, R-14, R-16, R-18, R-24, R-39, R-40, R-42 and PD-3, and took R-51 to R-54. Atish confirmed the corrections and took these decisions as a code owner on 20 Nov 2026 (Q-484; Moon may still reopen any of them on the PR). The project licence stays a whole-team `D-` decision (HN-0). +This PR may not touch `docs/decisions/`, so nothing here has an id yet. On approval each row becomes a `D-` or `Q-` entry (next free at the time of writing: **D-42** and **Q-485**; PR #183 reserves Q-484 and the project licence takes D-41; **since then D-42 and D-43 are taken, so HN-0 registers these rows from D-44**) in `docs/decisions/moving-objects.md` and the index. R-1 to R-12 were **decided by Moon on 18 Nov 2026**, taking the recommendations made on Atish's twelve questions. R-13 to R-28 and the PD rows were **decided by Moon on 19 Nov 2026** on Atish's re-review (changes requested at 76eca86). R-29 to R-49 were **decided by Moon on 19 Nov 2026** from a literature review (arXiv, ADS, IVOA and archive documentation; abstracts and repository pages, not full texts, so sources not opened are marked [verify] and listed as V37). They are registered only once V37 is closed (HN-0). Atish's third review (20 Nov 2026) corrected the citations of R-29, R-39, R-44, R-46, R-47 and R-48, re-decided R-37, corrected the wording of R-3, R-14, R-16, R-18, R-24, R-39, R-40, R-42 and PD-3, and took R-51 to R-54. Atish confirmed the corrections and took these decisions as a code owner on 20 Nov 2026 (Q-484; Moon may still reopen any of them on the PR). The project licence stays a whole-team `D-` decision (HN-0). | Ref | Decision | Status | |---|---|---| diff --git a/docs/architecture/plan.md b/docs/architecture/plan.md index bda91042..90c28e96 100644 --- a/docs/architecture/plan.md +++ b/docs/architecture/plan.md @@ -4,6 +4,8 @@ ## A13 Plan to 14 Nov +> **Superseded by D-43 (20 Nov 2026):** milestones M1 to M5 are closed and replaced by release milestones; see [D-43](../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5). The board below is a 9 Nov snapshot. + Status board as of **9 Nov 2026**, from GitHub (issues and merged PRs). Dates are targets, not promises. The team builds from 5 Nov and has set aside the event rule against building before 14 Nov (D-14). Work is tracked in the GitHub project "SphereX and PlanetX - NASA COMPETITION 2026" as milestones M1 to M5 (D-29, owners D-30). M1 to M4 build against their own fixtures; only M5 joins them. Numbers like #26 are issues; "PR #n" are pull requests. **What changed since the plan of 5 Nov:** the event build is desktop browser only on the Asus A15 (Q-132), so M3 becomes **"Sound"** (D-29 and D-30 carry the amendment; the rename on GitHub is pending) and phone testing moves after the event. The MVP demo is 433 Eros in the **Track** tool (Q-137, A19, Atish). **Area search** (Q-146, A16 to A18) joins M4 as tickets D1 to D3. diff --git a/docs/decisions/README.md b/docs/decisions/README.md index 6f76c555..37d201d8 100644 --- a/docs/decisions/README.md +++ b/docs/decisions/README.md @@ -10,7 +10,7 @@ The log is split by topic so a task loads only what it needs. **Load this index | File | Holds | Size | |---|---|---| -| [scope-process.md](scope-process.md) | scope cuts, doc layout, owners, build dates, milestones, the post-event backlog, the demo object and data release, ID reservations | 9 D, 13 Q, 24 KB | +| [scope-process.md](scope-process.md) | scope cuts, doc layout, owners, build dates, milestones, the post-event backlog, the demo object and data release, ID reservations | 9 D, 13 Q, 25 KB | | [contract.md](contract.md) | the data contract, object types, the endpoint list (D-16), schemas and generated types, saved assets, `overrides`, card and fixture shapes, cached replies, the issue #93 card fields (Q-363), warm-start health and the demo preflight (Q-454) | 6 D, 19 Q, 22 KB | | [contract-tags.md](contract-tags.md) | provenance tags and badges, the honesty toggle, tier fallback, the policy for unverified constants (Q-110, Q-119), "which tag does X get" | 3 D, 12 Q, 19 KB | | [data-sources.md](data-sources.md) | the backend framework, external archives and adapters, name resolving, the read-through cache and offline mode, test targets, overlays and the composite backends | 4 D, 16 Q, 22 KB | @@ -101,7 +101,7 @@ Every entry, in ID order. Status is shortened; the row in the topic file is auth | D-40 | Issue #93: engine speed, seeded patterns, physics corrections and new card fields | Decided (Atish, 11 Nov 2026); built except Q-361; Q-346 built by Q-385; performance waves Q-381 to Q-387 | [rendering-engines-tuning](rendering-engines-tuning.md#d-40-issue-93-engine-speed-seeded-patterns-physics-corrections-and-new-card-fields-decided-by-atish-11-nov-2026) | | D-41 | Project licence: BSD-3-Clause for code and mock-ups, CC-BY-4.0 for docs; data and third-party parts keep their terms (their licence table comes with #200); GPL only as an optional plugin the user installs | Decided (Atish, 24 Nov 2026, PR #212); Space Apps terms checked 24 Nov 2026 | [scope-process](scope-process.md#d-41-project-licence) | | D-42 | `dev` is the development branch: all work branches off `dev` and merges back into it by PR; `main` is frozen at `b7b4a1d6` and `dev` is the default branch | Decided (Atish, 20 Nov 2026); GitHub settings to apply | [scope-process](scope-process.md#d-42-dev-is-the-development-branch-main-is-frozen) | -| D-43 | Release milestones R0, R1a, R1b, R2, DR4 and Maintenance replace M1 to M5; difficulty by label; Atish assigns every ticket | Decided (Atish, 20 Nov 2026); the R1a/R1b split and HN-11, HN-16 placement are proposed | [scope-process](scope-process.md#d-43-release-milestones-replace-m1-to-m5) | +| D-43 | Release milestones R0, R1a, R1b, R2, DR4 and Maintenance replace M1 to M5; difficulty by label; Atish assigns every ticket | Decided (Atish, 20 Nov 2026) | [scope-process](scope-process.md#d-43-release-milestones-replace-m1-to-m5) | | Q-01 | Backend framework | Answered: D-15 | [data-sources](data-sources.md) | | Q-02 | Frontend hosting | Answered: D-24 | [platform-hosting](platform-hosting.md) | | Q-03 | Sliders on baked bodies | Answered: D-26 | [rendering-bodies](rendering-bodies.md) | diff --git a/docs/decisions/scope-process.md b/docs/decisions/scope-process.md index 10106e18..bda951f8 100644 --- a/docs/decisions/scope-process.md +++ b/docs/decisions/scope-process.md @@ -104,20 +104,20 @@ - **Decision (Atish, 20 Nov 2026), amends D-29 and D-30:** the milestones M1 to M5 were closed on 20 Nov 2026. Work is tracked in the same GitHub project, "SphereX and PlanetX - NASA COMPETITION 2026", under these milestones, which follow the releases of [A22.12](../architecture/discovery-hunts.md#a2212-plan-tickets-and-owners): - | Milestone | Holds | + | Milestone (GitHub title) | Holds | |---|---| - | **R0** | Housekeeping and verification before the build: HN-0, the `V` checks, the library checks, the README and test-helper tickets | - | **R1a** | The release 1 minimum (A22.12, R-27): HN-1, HN-2, HN-3, HN-4b, HN-5, HN-6 | - | **R1b** | The rest of release 1 (R-8): HN-4, HN-7, HN-8, HN-9, HN-10 | - | **R2** | Release 2: HN-11 to HN-16, and the release 2 part of HN-4b (R-54) | - | **DR4** | HN-17 (H10, cross-match on Gaia DR4). Ships when Gaia DR4 is out | + | **R0 · Foundations and onboarding** | The licence, the `dev` branch, HN-0, onboarding docs and the first starter tickets; V6 and the library checks | + | **R1a · Hunts core (minimum)** | R-27's minimum, except HN-0 (in R0): HN-1, HN-2, HN-3, HN-4b (release 1 part), HN-5, HN-6 | + | **R1b · First validated hunts** | The rest of release 1 (R-8): HN-4, HN-7, HN-8, HN-9, HN-10, HN-11, HN-16 | + | **R2 · More hunts** | Release 2: HN-12, HN-13, HN-14, HN-15, and the release 2 part of HN-4b (R-54) | + | **DR4 · Gaia dark companions** | HN-17 (H10, cross-match on Gaia DR4). Ships when Gaia DR4 is out | | **Maintenance** | Standing. App fixes outside the hunts (for example #184, #185) | No milestone has a due date for now. - **Difficulty is a label, not a milestone:** `good first issue` is Level 1, `help wanted` is Level 2, and a ticket with neither is core work. Atish assigns every ticket (D-17). - **Unchanged:** the contents of the A22 releases. D-43 only names where each ticket is tracked. - **Why:** M1 to M5 were the event's independent tracks, due 8 to 15 Nov. The event build is done, and the Discovery hunts ship in releases that overlap, so the old names and due dates no longer describe the work. -- **Open for Atish:** the A22.12 text does not define R1a and R1b. The split above follows "Release 1 minimum" (R1a) and issue #202 ("R1b: blocks HN-4"). Placing HN-11 and HN-16 in R2 is also proposed: A22.12 does not label them. +- **Source:** the descriptions of these GitHub milestones, created by Atish on 20 Nov 2026, which name the tickets of R0, R1a, R1b and R2; A22.12 labels only HN-12 to HN-15 as release 2. Not every `V` check is in R0: #202 (V36) is in R1b, next to HN-4, which it blocks. - **Relates to:** D-14 (build dates), D-17 (owners), D-42 (`dev`), A22.12. ## Post-event backlog From 70d82b076ff6638127d5c22c76745970ebfc3205 Mon Sep 17 00:00:00 2001 From: Claude Date: Thu, 26 Nov 2026 08:48:53 +0000 Subject: [PATCH 3/3] Issue-205: Note that the M-labels in the Area and Track ticket tables are closed milestones (D-43) Co-Authored-By: Claude Sonnet 5.5 Claude-Session: https://claude.ai/code/session_017Dj9JL8HPhcxQHyG7e9ABN --- docs/architecture/moving-objects/area-plan.md | 2 +- docs/architecture/moving-objects/track-contract.md | 2 +- docs/architecture/moving-objects/track-ui.md | 2 ++ 3 files changed, 4 insertions(+), 2 deletions(-) diff --git a/docs/architecture/moving-objects/area-plan.md b/docs/architecture/moving-objects/area-plan.md index 57dbc5b6..8eae2403 100644 --- a/docs/architecture/moving-objects/area-plan.md +++ b/docs/architecture/moving-objects/area-plan.md @@ -6,7 +6,7 @@ The end of [A16](area-search.md#a16-area-search): the tickets, the Day 0 gate an ### A16.7 Tickets and plan -Three core Area tickets (D-29 "as few tickets as possible"): D1 and D2 in **M4 Extras**, D3 in **M5**, priority P2. Four **gated extras** (D4 to D7, [Q-203](../../decisions/moving-objects.md)) in **M4 Extras**, priority P3, behind the gate below. Track's tickets T1 to T4 are in [A19.14](track-contract.md#a1914-owners-tickets-and-tests) and [A20.15](track-ui.md#a2015-tests-and-tickets). +Three core Area tickets (D-29 "as few tickets as possible"): D1 and D2 in **M4 Extras**, D3 in **M5**, priority P2. Four **gated extras** (D4 to D7, [Q-203](../../decisions/moving-objects.md)) in **M4 Extras**, priority P3, behind the gate below. Track's tickets T1 to T4 are in [A19.14](track-contract.md#a1914-owners-tickets-and-tests) and [A20.15](track-ui.md#a2015-tests-and-tickets). (M1 to M5 are the event milestones, closed on 20 Nov 2026 and replaced by release milestones, [D-43](../../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5); the labels below are kept as history.) | Ticket | Owner | Checklist | |---|---|---| diff --git a/docs/architecture/moving-objects/track-contract.md b/docs/architecture/moving-objects/track-contract.md index 2c086f07..25da29b1 100644 --- a/docs/architecture/moving-objects/track-contract.md +++ b/docs/architecture/moving-objects/track-contract.md @@ -80,7 +80,7 @@ Q-21's text still says `frames:truncated` past the cone cap; PR #53's entry, mer | OUTLIER-core rule in Stage 2 (A4.2) | Moon | **T4** | | Track screen; Track sound | Atish | T2, T3 ([A20.15](track-ui.md#a2015-tests-and-tickets)) | -Milestone M4 Extras, priority P1 because Track is the MVP demo (**Proposed (Q-187)**). Tests (backend, offline on recorded answers): the path from the recorded Horizons replies; an over-limit 200 text answer is not cached; the interpolated marker against the TLIST positions within the stated bound; the Horizons gate never runs two calls at once; Eros gives 14 of 16 points, 13 flagged `outlier_core` **[verify]**; the star list's radii and the near-track filter; the ECSV round trip (tags in the metadata, refusal rows kept, no spin columns); `path:deferred` then a final path. +Milestone M4 Extras, priority P1 because Track is the MVP demo (**Proposed (Q-187)**). Tests (backend, offline on recorded answers): the path from the recorded Horizons replies; an over-limit 200 text answer is not cached; the interpolated marker against the TLIST positions within the stated bound; the Horizons gate never runs two calls at once; Eros gives 14 of 16 points, 13 flagged `outlier_core` **[verify]**; the star list's radii and the near-track filter; the ECSV round trip (tags in the metadata, refusal rows kept, no spin columns); `path:deferred` then a final path. (M1 to M5 are the event milestones, closed on 20 Nov 2026 and replaced by release milestones, [D-43](../../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5); the labels below are kept as history.) ### A19.15 Open items diff --git a/docs/architecture/moving-objects/track-ui.md b/docs/architecture/moving-objects/track-ui.md index 8c2dc78a..14a40962 100644 --- a/docs/architecture/moving-objects/track-ui.md +++ b/docs/architecture/moving-objects/track-ui.md @@ -133,6 +133,8 @@ Track's path sound (Q-134: one tick per exposure, wavelength to pitch, drawn x t | **T2 Track screen** (A20.1 to A20.14) | Atish | M4 Extras, P1 (**Proposed (Q-187)**) | | **T3 Track sound** (R8.9.2, A20.9) | Atish | M3 (renamed "Sound", Q-132) | +(M1 to M5 are the event milestones, closed on 20 Nov 2026 and replaced by release milestones, [D-43](../../decisions/scope-process.md#d-43-release-milestones-replace-m1-to-m5); the labels below are kept as history.) + | Layer | Tests | |---|---| | Unit | Interpolation between samples and the snap at exposures (`trackTime.ts`); slider and marker in sync; the hash `track=`; Escape closes Track before any other surface (a focused text field keeps it, Q-170) |